ML20216B709
| ML20216B709 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/08/1998 |
| From: | Bowling M NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20216B715 | List: |
| References | |
| B17056, NUDOCS 9804140064 | |
| Download: ML20216B709 (4) | |
Text
8
.i -
1, Nht R pe Ferry Rd. (Route 156), Unterford, Cr 06385 Nuclear Energy EUntone Nudcar Pom Stadon Northeast Nudcar Energy Company P.O. Ikix 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 j
%e Northeast Utilities System APR - 81996 Docket No. 50-423 B17056 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk
{
Washington, DC 20555 i
Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specification
)
instrumentation Surveillances (PTSCR 3-30-97)
Northeast Nuclear Energy Company (NNECO), in letters dated October 15,1997 and January 23, 1998, requested a revision to Millstone Unit No. 3 Technical Specifications. NNECO, after discussions with the NRC Staff, has decided to make additional changes that do not affect the intent of the requested revision. Therefore, we are requesting that our requested revision be modified by replacing pages 2-4, B 2-3, B 2-4, 3/4 3-15, B3/4 3-1 and B 3/4 3-2 with the pages contained within to this letter.
l We have reviewed the above listed changes to our requested revision and have concluded that the changes do not affect the Safety Assessment or Significant Hazards Consideration contained within our "B16624, Application for Amend to License NPF-49,proposing Changes That Will Affect Nominal Trip Setpoints & Allowable Values. Proprietary Rev 5 to WCAP-10991 & non-proprietary Rev 5 to WCAP-10992,encl.Proprietary Rept Withheld,Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid..790|October 15,1997 letter]].
if you have another questions, please contact Mr. D. A. Smith at (860) 437-5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY M. L. Bowling, Jr.
/
Millstone Unit No. 2 - Recovery Officer Sworn to and subscribed before me this f day of //A 1998 54$$
\\
F Notary Pubic LORETTA F. GOODSON i'O My Commission expires NOTARY PIIRI le jl Commission Expires November 30,2001 Attachments
_,,,,g cc:
See Page 2 9004140064 98040s PDR ADOCK 050oo423 P
i tJ.S. Nucl:ar Regulatory Commission B17056\\Page 2 i
l cc:
H. J. Miller, Region I Administrator i
J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 J
A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, Ph.D, Director, Special Projects Office j
Director Bureau of Air Management l
Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 0610605127 L
1 l
l l
l l
l l
L l
l l
t Docket No. 50-423 B17056 i
1 l
l i
i i
l l
l Millstone Nuclear Power Station, Unit No. 3 l
l Commitments l
l l
l
\\
l I
i l
l l
I i
i i
l l
t 1
1 April 1998 i
I
' U.S. Nucl fr Regulatory Commission B17056%ttachment 1\\Page 1 l
Enclosure j
List of Regulatory Commitments I
The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Regulatory Complianca at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Commitment Committed Date or Outage NONE N/A i
i i
.