>* Ff C y
i UNITED STATES g
j NUCLEAR REGULATORY COMMISSION g~7, pp $
f WASH!NGTON, D.C. 20066 4001
.m./
March 5, 1998 DISTRIBUTION:
Project File PUBLIC Mr. Ian C. Rickard, Director JRoe Operations Licensing TEssig ABB Combustion Engineering TCollins Nuclear Systerns LKopp 2000 Day Hill Road RIngram P.O. Box 500 PWen Windsor, Connecticut 06095-0500 PGEB r/f
SUBJECT:
ACCEPTANCE FOR REFERENCING OF THE TOPICAL REPORT CENPD-199(P), REVISION 1-P-A, SUPPLEMENT 2-P,"CE SETPOINT MEHODOLOGY" (TAC NO. M99684)
Dear Mr. Rickard:
We have concluded our review of the subject topical report of September 1997, submitted by the ABB Combustion Engineering Nuclear Systems (ABB-CE) company. The report is accepteble for referencing in licensing applications for ABB-CE plants with analog protection systems, subject to the limitations specified in the report and in the associated NRC evaluation, which is enclosed. The evaluation defines the basis of acceptance of the rcport.
We do not intend to repeat our review of the matters described in the report, and found acceptable, when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to matters described in the report.
In accordance with procedures established in NUREG-0390," Topical Report Review Status,
we request that ABB Combustion Engineering publish accepted versions of this topical report, proprietary and non-proprietary, within 3 months of receipt of this letter. The accepted versions shall incorporate this letter and th ' enclosed evaluation between the title page and the abstract.
It must be well indexed such that WJormation is readily located. Also, it must contain in appendices historical review information, such as questions and accepted responses, and original report pages that were replaced. The accepted versions shallinclude an "A" (designating accepted) following the report identification symbol. The staff will review this report when it is submitted.
I i
OF03 i
^
.kd 9
9003130103 980305 PDR ADOCK 05200003 NRC FILE CENTER CO
^
.I ! !Ill.l!IllJil.l ll l
l l
- l. Rickard March 5, 1998 If our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, ABB-CE and/or the applicants referencing the to, nice! report niii be exp66ted to revise and resubmit their respective dccumeiriation, or submit justification f0r the continued app!!cebi!!ty of the topical report without revision of their respective documentation.
Sin
- ely, pt Thomas H. Essia. A ing Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
Enclosure:
CENPD-199(P), Revision 1-P-A, Supplement 2-P, Evaluation ec: See next page l
I
[
(
1
- l. Rickard March 5, 1998 if our criteria or regu!ations change so that our conclusions as to the acceptability of the report are invalidated, ABBCE and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentatier., or submit justification for the continued applicability of the topical report without revision of their respective documentation.
Sincerely, Original Signed By:
Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Reguiation
Enclosure:
CENPD-199(P), Revision 1-P-A, Supplement 2-P, Evaluation cc: See next page Distnbuuon: See attached list DOCUMENT: G:\\sim\\ce199.Itr 4
SC:PGEBM OFFICE PGEB BC:SRXB BC:PGEBA NAME PWen:sw {cd TCollins<M FAkstuleNcz TEssig 'k DATE 3/ 1 /98 36 ? /98 3/ 3/98 3/h /98 46 l
,