ML20216B288
| ML20216B288 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/02/1998 |
| From: | Mccormickbarge NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9803130036 | |
| Download: ML20216B288 (1) | |
Text
Mr. S. A. Pctuiski Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241
Dear Mr. Patul9ki:
This letter confirms our cancellation of a meeting at 10:00 a.m. on March 10,1998, in th3 Region 111 Office, in Lisle, Illinois. The purpose of the meeting was to discuss the station problem reporting and corrective action process, the results of a root cause analysis for a recent transformer failure, and planned improvements to the security program. The meeting will be rescheduled, i
Sincerely,
/s/J. W. McCormick-Barger J. W. McCormick-Barger, Chief Reactor Projects Branch 7 Docket No.: 50-266 i
Docket No.: 50-301 cc:
R. R. Grigg, President and Chief Operating Officer, WEPCO A. J. Cayia, Plant Manager B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L. Parrino, Chairman Wisconsin Public Service Commission State Liaison Officer Distribution:
Docket File 4
)
SRI Point Beach
[]
PUBLIC IE41,h;7 Rlli Enf. Coordinator A. B. Bea6.h Deputy RA DRP Project Manager, NR'R DRS (2)
RlllPRR TSS GREENS DOCUMENT NAME: G:\\poin\\ pol 03108.mtg To seceive a copy of this docurnent, indicate hi the hos *C' s Copy without attach /enci "E" a Copy with attach!enci *N* = No copy OFFICE Rlli (i
Rill
_A b
'ill V NAME Kunowski:nmE -
McCormidk-Barger DATE 03/2/98 03/ A/98 OFFICIAL RECORD COPY 9003130036 980302 PDR ADDCK 05000266 h,h