Forwards Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Were Identified.One Instance of Improper Foreign Matl Exclusion Control & One Case of Work Order Not Being Properly Revised Were Noted
ML20216B192
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/06/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20216B198 List:
References
50-282-98-05, 50-282-98-5, 50-306-98-05, 50-306-98-5, NUDOCS 9804130389
Download: ML20216B192 (2)


See also: IR 05000282/1998005

Text

.;. ,

,e

Mr. M. Wadley, Vice President

Nuclear Generation

Northem States Power Company

~414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

INSPECTION REPORT NO. 50-282/98005(DRP); 50-306/98005(DRP) FOR

PRAIRIE ISLAND NUCLEAR GENERATING PLANT

Dear Mr. Wadley:

On March 28,1998, the NRC completed an inspection at your P uirie Island Nuclear Generating

-

Plant. The enclosed report presents the results of that inspection.

During the four week period covered by this inspection, most operations activities were

performed well with only a few mmor errors. Two evolutions involving unusual reactivity

manipulations on Unit 1 were conducted conservatively and carefully. The Unit 2 startup and

retum to full power was also accomplished in a safe and controlled manner. Several instances

of personnel stopping to correct procedure discrepancies were noted. Most maintenance and

surveellence activities were also conducted well. However, one instance of improper foreign

material exclusion control and one case of a work order not being property revised were noted

in addition, a temporary change to equipment operating instructions necessary to protect a

gauge from being damaged was not incorporated into all of the appropriate procedures. Finally,

an inadequate procedure for setting thermal overload heaters resulted in a ventilation fan being

inoperable at the same time the opposite train's emergency diesel generator was being tested.

Engineering support of operations and maintenance activities was excellent.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-282;50-306

License Nos.: DPR-42; DPR-60

Enclosure:

Inspection Report

No. 50-282/98005(DRP);

50-306/98005(DRP) '

-

DOCUMENT NAME: R:\\insprptsipowers\\pralipra98005.dtp

.

To sensive e oesy of this doeu nent, ladosto in the bor 'C" = Copy vulthout enschenentlenolosure T" = cost wilh :

-

_

_ N" * No oesr

"

OFFICE

Rill

t

Rlli

f

Rill

1

NAME

Kunowski:dpgf) JMc8 Q

Grant /[fr

DATE

04/ 4/98^[

04/[j /98

04/(g/98

OFFICIAL RECORD COPY

'l

i

. , .

9804130389 900406

i

PDR

ADOCK 05000282

0

PDR

l

i

i

i

-

.:

.*

M. Wadley

-2-

cc w/ encl:

Plant Manager, Prairie Island

State Liaison Officer,

State of Minnesota

State Liaison Officer,

State of Wisconsin

Tribal Council

Prairie Island Dakota Community

Distributign:

Docket File w/enct

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Prairie is'and PM, NRR w/end

SRI Prairie Island w/enci

LEO (E-mali)

Rlli Enf. Coordinatorw/enci

A. B. Beach w/enci

C. Carpenter, NRR w/enci

DRP w/ encl

Deputy RA w/enci

DRS (2) w/enci

DOCDESK (E-mail)

TSS w/enci

i'

l

)