ML20216A972
| ML20216A972 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 06/17/1987 |
| From: | Taylor J DAIRYLAND POWER COOPERATIVE |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| LAC-12261, NUDOCS 8706290021 | |
| Download: ML20216A972 (2) | |
Text
i b
j Q[y W e:
'\\
.g ' p//g[,/gg' hh/S/[ COOPERATIVE. P O BOX 817
- 2615 EAST AVE. SO.
LA CROSSE. WISCONSIN 54602 0817
+
(608) 788-4000 -
)
JAMES W. TAYLORJ Gtneral Manager
-3 June 17, 1987 In reply, please j
refer to LAC-12261 1!
DOCKET NO. 50-409 U. S. Nuclear Regulatory Commission Attention: Document Control Desk j
- Washington, DC 20555 i
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE DPR-45 APPLICATIONS FOR AMENDMENTS TO LICENSE
REFERENCES:
(1) DPC Letter, Linder to Crutchfield, LAC-9687, dated. March 20, 1984.
(2) 'DPC Letter, Linder to Crutchfield, LAC-9553, l
dated' January 30, 1984.
(3) DPC Letter, Taylor to Zwolinski, LAC-11517, dated April 7, 1986.
y (4). DPC Letter, Taylor to.Zwolinski, LAC-12018,.
dated' December 17, 1986.
(5). DPC Letter, Taylor to Zwolinski., LAC-12019, dated December 19, 1986.
.j
-(6) DPC Letter, Taylor to Zwolinski, LAC-11518, I
dated April 7, 1986.
-(7) DPC Letter, Taylor to Document Control Desk, LAC-12166, i
dated March 24, 1987.
j
'l Gentlemen:
l Dairyland Power Cooperative requested revisions to LACBWR Technical Specifications in References 1-7.
Due to the permar.cnt shutdown of the La' Crosse Boiling Water Reactor, DPC is withdrawing its requests for some of these changes, j
The proposed amendments DPC is withdrawing are as follows:
-(1) Revisions to reactor protective system on-line functional testing frequency'(Reference 1).
I (2) New specification on control room chemical detectors (Reference 2).
i PC1 60l jjRo629oo21 870617 a7p ADOCK 05000409.[
' !O s
1
/
PDR 6
i t
q:
i if;;i: ~Hi
- i
,. Document Control Desk'-
r Page Two'.
June-17, 1987-t u
- LAC-12261:
E o.
(3),. Revision's to' reporting requirements on primary coolant iodine spikes-1- (
f(Reference 3).
l (4) -Revision's to specifications covering-partial scrams due to control rod
' drive mechana:.m low-gas pressure and low oil level (Reference 4).
(5) -Revisions to nuclear instrumentation specifications-(Reference 5).
The. proposed revisions reflecting DPC organizational changes (Reference 6, as modified by Reference 7) are still needed.
l If there are~any. questions, please contact us.
1 Sincerely,
_DAIRYLAND POWER COOPERATIVE j
James W. Taylor General Manager
' JWT LSG sks
- cc A..Bert Davis, Region III
'_NRC Resident Inspector
~P. Erickson, LACBWR Project Manager
- r L. L. Smith, Director, Electrical and Water Bureau l
PCI-36 4
(
_