Ltr Contract:Mod 4 to Task Order 15 Under Contract NRC-04-95-065
ML20216A916
Person / Time
Issue date: 05/06/1998
From: Mace M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Schossow F
ICF, INC.
References
CON-FIN-J-5236, CON-NRC-04-95-065, CON-NRC-4-95-65 NUDOCS 9805140296
Download: ML20216A916 (4)


Text

h p uco o.

sh UNITED STATES

('

j NUCLEAR REGULATORY COMMISSION p

WASHINGTON, D.C. 2055W1

'C

.'hqy 0 4 1998 ICF Incorporated

)

ATTN:

Ms. Frances Schossow Project Administrator 9300 Lee Highway Fairfax, VA 22031-1207

Dear Ms. Schossow:

Subject:

Modification No. 4 to Task Order No.15 under Contract No. NRC-04-95-065 The purpose of this modification is to (1) add within scope work to the Statement of Work as per the attached pages and in accordance with the contractor's i

technical proposal dated 04/08/98. (2) increase the ceiling by $54.233.

from $149.365 to $203,598, all of which represents the reimbursable costs.

l and (3) increase the obligated amount by $29,613, from $135,000 to $164.613.

Accounting Data for Task Order No.15. Modification No. 4 is as follows:

APPN No.

31X0200.660 B&R No.

85015122027 Job No.

J5236 BOC No.

252A Amt. Ob1igated:

$14.365 APPN No.

31X0200.860 and APPN No.

31X0200.860 B&R No.

86015213015 and B&R No.

86015213015 Job No.

W6295 and Job No.

W6295 BOC No.

252A and BOC No.

252A Amt. Obligated:

$ 8.248 and Amt. Obligated:

$ 7.000 A summary of obligations for this task order from award date through the date of this action is given below:

Total FY97 Obligation Amount:

$ 50.000 Total FY98 Obligation Amount:

$114.613 Cumulative Total of NRC Obligations:

$164.613 This modification obligates FY98 funds in the amount of $29.613.

9805140296 980504 NR -04 065 PDR

Contract No.

NRC-04-95-065 Modification No.

4 to Task Order 15 Page 2 of 2 Please indicate your acceptance of this task order modification by having an official, autnorized to bind your organization, execute three copies of this docuent in the-space provided and return two copies to the Contract Specialist.

You should retain the third copy for your records Should you have any questions regarding this modification please contact Ms.

Amy Siller. Contract Specialist, on (301) 415-6747.

Sincerely, e

II

' [Q Mary M e. Contractin Officer Contract j agement Branch 1 Division of Contracts and Property Management Office of Administration ACCEPTED:

\\L0D

(',c w

~

NAME j

e i

I (ITi.E

%h8 DATE

4.0 DELIVERABLES AND SCHLudLES e

Product Due Draft Final Task 1 Categorize and Summarize Comments from the Public Meetings Held in the Fall of 1997

  • First public meeting (planned for 10/28-30/97 in Chicego) 2 ccks 04/17/98
  • Second public meeting (planned for 11/12-14/97 in Phil.)

2 ;.ccks 04/17/98 NUREC/CR Occumcat combin:ng the public concats of both mcctings 2 accks E-weeks Task la Comment Summary ACMUI Meeting 30 days 2 accks 04/17/98 Task lb Comment Summary All Agreement States Meeting 30 days 2 accks 04/17/98 Documents must also be in an electronic format compatible with the NRC Web Site.

Task 2 Environmental Assessment 0 accks after 2 wccks after 05/13/98 2nd public mtg.- contractor is (01/16/00) provided commcats on draft Task 3 Regulatory Analysis 0 wccks aftcr 2 wccks aftte 05/13/98 2nd public mtg. contractor is (01/15/00) providcd com:Nats on draft Task 3.5 OMB Clearance 'ackage 03/11/00 03/25/00 05/13/98

    • At least one, but not more than three, of each product may be required.

L r.im

l Statement of Work con't.

2 t

l l

Product Due DrJL Final l

Task 4 r

Categorize and Summarize Public Comments on the Proposed Rule l

4a. Ccmcat:; received at public mcctings.

  • First public meeting 8/19-20/98 10/98-12/98 u_._

n

...-_L-l (p1anned vbb

\\_bli n,,, e,, n n )

u. lu s

.s su L.

ma l

  • Second public meeting l

9/8-9/98 10/98-12/98 a

O..mmL-(p1anried ubb

~m 7,,11 n,/1 E,I n n kne.

sm

. it

. uliu s is su m omsJ Third public meeting (planned 9/23-24/98) 10/98-12/98 1

l Of in 7 / t'* n nnn..-nm&

am b4m:

.a a

+Lm livi\\LUI bi) UV b uites.siL bVIIIU l l i l I I3 blib public cc mcats of both mcctings 2 wccks 2 wccks 4b.

NUREG/CR document that 2ssccks after 2 wccks after categorizes and summarizes the close of public contractor u written comments received in ec acnt period provided ccmcnts response to the Federal Register on draft Notice announcing the proposed rule 10/98-12/98

/ s \\ + Ls.s 9.

mmL-s(4 m m O.

m L,-

st+m A-nm.

.m m ~ 4

-- L: m: ma3 tu/

Liib v nbuhJ u i bbi b TibchJ u 8 Lbim Tb.

UUb uuibi 4 6 bVii4U 4 4 413 written ccacnts rcceived in close of public contractor is respcasc to the redcral Reaister concnt period provided concats l

Notice announcing the proposed on draft rulc and (b) the public comments of the two mcctings-planncd betwccn 3..,..

_a c _. _u _,

,nno

(

Uu iJ A uilu vb p 6L 6 Hub i A.

Assv i

  • Ouc date will bc 2 wccks aftcr the contractor rtceives t4;e trans:ript of the j

mccting from the NRC.

l Documents must also be in an electronic format compatible with the NRC Web Site.

. u. -

.ma

.- - a c+ -..:.uu..-.a r

um.

un,.

+cc..:,,

-~.am m~by Ibna uilu b ui4 It a lbi i L J Vli usulLJ n IbliIII L YT U nvwna vi liU L L.

lii sb aLuie ni4 i FI UVsub i receipt of drafts from the contractce-

    • At least one. but not more than three, of each product may be required.