b AMENDMINT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDMENT / MODIFICATION MO.
3. EFFECTIVE DATE
4. REQUISITIOm/ PURCHASE REQ No.
5. PROJECT No.

Six m W 2 4 MB RFPA# AED-%-261, Dtd 11/24/97 (if *PPlicabie)

RFPA# AED-%-261, Dtd 12/23 97 AED962616&7

6. !$5UED BY CODE
7. ADMINISTERED BY CODE I (If other than Item 6)

U S. Nuclear Regulatory Conunission DIV. of Contracts & Property Mgmt.

Contract Management Branch 3 Mall Stop T 7tl-2 Washington, DC 2055$

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION NO.

SONALYSTS, INC 215 PARKWAY NORTH M. DATED (SEE ITEM W WATERFORD, CT 06385 PRINCIPAL INVEST! GATOR / TECHNICAL CONTACT: LAVERIA SANDERS 10A. MODIFICATION OF CONTRAC1/ ORDER NO.

TELEPHONE: (203) 442-4355 x

gpg_pg_gg_ggj 108. DATED (SEE 11EM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITAfl0NS O The above ruubered solicitation is amended as set forth in item 14 The hour and date specified for receipt of Offers O is extended, p is not extended. Offerers must acknowledge receipt of this amenchnent rior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completi ltems 8 and 15, and returning co 8y acknowledging receipt of this amenament on eac copy of the e,f fer s@mitted or (c) pies of the amendment; (bBy separate letter or te egram which includes a reference to the solicitation and amendnent numbers. FAILURf OF YOUR ACKWCWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEXPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amentanent you desire to change an offer already submitted such change may be made by telegr.am or letter, provided each telegram or tetter makes rr.ference to the solicitatlon and this amenchment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) 534,212.00 780.00 B&R# 882 15-22-20-05 BOC: 252A JOB CODE: E8293 APPN# 31x0200.882 AMOUNT 08 LIGATED: 519, B&R8 882-15-22-20-05 BOC: 252A JOB CODE: E8293 AFPN# 31x0200.882 AMOUNT OBLIGATED:

I

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRAC15/ ORDERS, IT M00!FIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT 10: (Specify authnrity) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

8. THE A80VE NUMBERED CONTRACT / ORDER IS MODiflED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN l1EM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THl$ $UPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

SUBSECTION B.3, CONSIDERATION AND OBLIGATION--TASK ORDERS l

D. OTHER (Specify type of modification and authority)

I tillateral - SWsection C.3.1.f CFR Self Study Quizzes Subsection C.3.3 Future Requirements Specialized Course Dev.

E. IMPORTANT: Contractor O is not, E is required to sign this document and return 2 copies to the issuing office.

l

14. DESCRIPT10N OF AMENDMENT /MODIFICAil0N (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)

l l

i S

WC2 / d l

SEE THE ATTACHED PAGES 9804130320 980324 PDR CONTR NRC-26-96-261 PDR Except as provided herein, all terms and conditions of the docunent ref erenced in item 9A or 10A, as heretofore changed. remains unchanged and in futt force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) n her hd

/N(s N b p'JKn [4Q 158 15C. DATE SIGNED 168. UN[iED ST ATES OF AMEit!CA 16C. ATE SIGHED J/ ' ' ?l L/. >-

( A % etur( of person authorized to sign) 3h.

N MSfonature of contruting Of ficer)

O ' *-

'l ^

81

~

NSN 7540-01-152-8070 30-105 STANDARD FORM 3 0 (REV.10-83)

PAFVlfm FDITION UNUSARtF Prescribed,by GSA,,

(OLI ri.

NRC-26-96-261 Modification No. 1 Page 2 of 8 The purpose of this modification is to:

1.

incorporate CLINs 0013A. 0019A. 0025A and 0031A which are the firm fixed prices to update the Code of Federal Regulations Self-Study Quizzes for contract years two through five in accordance with Subsection C.3.1.f of the subject contract.

2.

incorporate CLIN 0013B to allow for the conversion of the Power Plant Engineering Training Course to a Self-Study format in accordance with Subsection C.3.3 of the subject contract.

3.

increase the total amount for the base period by $128.272.00 from

$495.702.00 to $623.974.00, thereby increasing the grand total amount of the contract by $128.272.00 from $1.110.469.00 to $1.238.741.00.

j 4.

provide incremental funding in the amount of $53.992.00 which increases the obligated amount of the contract from $412.230.00 to $466.222.00.

Accordingly the contract is hereby modified as follows:

(1)

Subsection B.3. Items and Price is deleted in its entirety and substituted in lieu thereof the following:

"B.3. ITEMS AND PRICES ITEM SUPPLIES / SERVICES QUANTITY UNIT UNIT PRICE NO.

BASE PERIOD OF PERFORMANCE Year One 0001 Development of Student 1

lot

$102.228 Manuals. Instructional Manuals. Visual Aids and initial contract award travel (C.7) in accordance with Section C (One-time Charge) 0002 Power Plant Engineering 1

ea

$ 57.784 Course 0003 Nondestructive Student 1

ea

$ 21.449 Examination (NDE)

Technology and Codes Course

i Contract No. NRC-26-96-261 Modification No. 6 Page 3 of 8 l

0004 Eddy Current

-1 ea

$ 18.882 Course 0005 Welding and NDE 1

ea

$ 12.638 Overview Course 0006 Field Techniques 1

ea

$ 33.594 Course 0007 Specialized Course 1

lot CEILINCt Development and

$ 50.689 Presentation (C.3 3.) and CFR Self-Study Quizzes (C.3.1.f) 0007A 1997 CFR Self-Study Quiz Update (Firm-Fixed Price $35.542 - Price Includes Material Costs of $400.00)

Professional (600 estimated hrs)

Oversight

$74.67 hr @

42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Technical

$67.30 hr @

550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Consultant

$39.44 hr @

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non-Professional (300 estimated hrs)

Clerical

$32.57 hr @

250 hors Graphics

$41.61 hr @

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> ITEM SUPPLIES / SERVICES QUANTITY UNIT UNIT PRICE NO.

Year Two 0008 Power Plant Engineering 1

ea

$ 58.956 Course 0009 Nondestructive Student 1

ea

$ 21.542 Examination (NDE)

L Technology and Codes Course 0010 Eddy Current 1

ea 5 18.975 Course

j Contract No. NRC-26-96-261 Modification No. 6 Page 4 of 8 0011 Welding and NDE 1

ea

$ 12.731 Overview Course

$ 34.284 0012 Field Techniques 1

ea Course 0013 Specialized Course 1

lot CEILING Development and

$180.222 Presentation (C.3.3.) and CFR Self-Study Quizzes (C.3.1.f) l 0013A 1998 Self-Study Quiz Update (Firm-Fixed Price $31.173 - Price Includes Material Costs of $471.00) i 00138 Power Plant Engineering Self-Study Course (Firm-Fixed Price $147.072)

Professional (2094 estimated hrs)

Oversight

$76.00 hr @

210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> Technical

$69.00 hr @

1876 hours0.0217 days <br />0.521 hours <br />0.0031 weeks <br />7.13818e-4 months <br /> Consultant

$39.44 hr @

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non-Professional (1018 estimated hrs)

Clerical

$33.44 hr 0 968 hours0.0112 days <br />0.269 hours <br />0.0016 weeks <br />3.68324e-4 months <br /> Graphics

$42.65 hr @

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> TOTAL BASE PERIOD:

$623.974 ITEM SUPPLIES / SERVICES QUANTITY UNIT UNIT PRICE i

NO.

00 tion 1 - Year Three 0014.

Power Plant Engineering 1

ea

$ 59.579 Course i

0015 Nondestructive Student 1

ea

$ 21.637 Examination (NDE)

Technology and Codes Course 0016 Eddy Current 1

ea

$ 19.070 l

Course

7 Contract No. NRC-26-96-261 Modification No. 6

/

Page 5 of 8 i

+

0017 Welding and NDE 1

ea

$ 12.836 Overview Course 0018 Field Techniques 1

ea

$ 34.989 Course 0019 Specialized Course 1

lot CEILING Development and

$ 53.239 Presentation (C.3.3.) and CFR Self-Study Quizzes i

(C.3.1.f) 0019A 1999 CFR Self-Study Quiz Update (Firm-Fixed Price $31.949 - Price Includes Material Costs of $471.00)

Professional (600 estimated hrs)

Oversight

$78.40 hr 0 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Technical

$70.67 hr 0 550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Consultant

$39.44 hr @

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> i

Non-Professional (300 estimated hrs)

Clerical

$34.31 hr @

250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> Graphics

$43.71 hr @

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> TOTAL OPTION YEAR 1:

$201.340 ITEM SUPPLIES / SERVICES QUANTITV UNIT UNIT PRICE NO.

ODtion 2 ; Year Four 0020 Power Plant Engineering 1

ea

$ 60.795 Course 0021 Nondestructive Student 1

ea

$ 21.733 Examination (NDE)

Technology and Codes Course 0022 Eddy Current 1

ea

$ 19.165 Course 0023 Welding and NDE 1

ea 5 12.922 l-Overview Course

I Contract No. NRC-26-96-261 Modification No. 6 Page 6 of 8 0024 Field Techniques 1

ea

$ 35.712 Course 0025 Specialized Course 1

lot CEILING Development and

$ 54.565 Presentation (C.3.3.) and CFR Self-Study Quizzes (C.3.1.f) 0025A 2000 CFR Self-Study Quiz Update (Firm-Fixed Price $32.730 - Price

~

Includes Material Costs of $471.00)

Professional (600 estimated hrs)

Oversight

$80.00 hr @

42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Technical

$72.48 hr @

550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Consultant

$39.44 hr @

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non-Professional (300 estimated hrs)

Clerical

$35.14 hr 0 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> Graphics

$44.88 hr @

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> TOTAL OPTION YEAR 2:

$204.892 j

ITEM SUPPLIES / SERVICES QUANTITY UNIT UNIT PRICE NO.

00 tion 3 - Year Five 0026 Power Plant Engineering 1

ea

$ 62.042 Course 0027 Nondestructive Student 1

ea

$ 21.833 Examination (NDE)

Technology and Codes Course i

0028-Eddy Current 1

ea

$ 19.265 Course 0029 Welding and HDE 1

ea

  • 13.022 Overview Course 0030 Field Techniques 1

ea 5 36.454 Course l

t

~

Contract No. NRC-26 96-261 Modification No. 6 r

i Page 7 of 8 0031 Specialized Course 1

lot CEILING Development and

$ 55.919 Presentation (C.3.3.) and CFR Self-Study.0uizzes (C.3.1.f) 0031A 2001 CFR Self-St'dy Quiz Update u

L (Firm-Fixed Price $33.536 - Price l

Includes Material Costs of $471.00)

Professional (600 estimated brs)

Oversight

$82.00 hr @

42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> l

Technical

$74.28

'hr @

550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Consultant

$39.44 hr @

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non-Professional (300 estimated hrs)

Clerical

$36.04 hr @

250 hour0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br />s-Graphics

$45.90 hr @

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> TOTAL OPTION YEAR 3:

$208,535 GRAND TOTAL:

$1.238.741.00 (2)

Subsection B.4. Consideration and Obligation - Delivery Orders (JUN 1988) is deleted in its entirety and substituted in lieu the following:

for the The total estimated amount of this contract (ceiling) der this

"(a) products / services ordered. delivered, and accepted un contract is $623.974.00. The Contracting Officer may unilaterally increase this amount as necessary for orders to be placed with the contractor during the contract period provided such orders are within any maximum ordering limitation prescribed under this contract."

(b) The amount presently obligated with respect to this contract is

$466.222.00. The Contracting Officer may issue orders for work up to the amount presently obligated. This obligated amount may be.

unilaterally increased from time to time by the Contracting Officer by written modification to this contract. The obligated L'

amount shall. at no time, exceed the contract ceiling as specified i'

in paragraph a above. When and if the amount (s) paid and payable to the Contractor hereunder shall equal the obligated amount. the Contractor shall not be obligated to continue performance of the n

i work-unless and until the Contracting Officer shall increase the amount obligated with respect to this contract.

Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk."

Contract No. NRC-26-96-261 Modification No. 6 Page 8 of 8 A summary of obligations for this contract, from date of award through the date of this action is provided below:

Total FY 96 Obligations ----------------- $160.012.00 Total FY 97 Obligations ----------------- $252.218.00 Total FY 98 Obligations ----------------- $ 53.992.00 Cumulative Total of NRC Obligations:

$466.222.00.

This modification obligates FY 98 funds in the amount of $53.992.00.

All other terms and conditions under this contract remains unchanged. -