ML20215P011

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Sept 1986
ML20215P011
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/30/1986
From: White P
Public Service Enterprise Group
To:
Shared Package
ML20215P009 List:
References
NUDOCS 8611100218
Download: ML20215P011 (1)


Text

=

4...

. OPERATING DATA. REPORT CORRECTED COPY-Docket No.~50-311 Date October 10,1986-Telephone 935-6000

. Completed;by

-Pell White Extension-4451 Operating Status ~-

1. ~ Unit Name Salem No. 2 Notes' 2.._ Reporting Period September 1986-

~3.

Licensed Thermal Power-(MWt) 3411 4.

Nameplate,. Rating (Gross MWe)- '

TI75 5.-

Design Electrical Rating- (Net-MWe)

ITTE 6.

Maximum Dependable Capacity (Gross MWe)llTF 7.

Maximum ~ Dependable. Capacity (Net MWe) ITFE 8.

-If' Changes.0ccur in' Capacity Ratings (items-3 through 7)_ since Last

. Report, Give Reason N/A 9.

Power Level to Which Restricted, if any (Net MWe) 85%

10. Reasons for Restrictions, if any Due.to power distribution on power transformers-This Month Year to Date' Cumulative
11. Hours in. Reporting Period 720 6551 43536
12. No. of Hrs. Reactor was Critical 320.9 5275.6 25601.5

~13'. Reactor Reserve' Shutdown Hrs.-

0 0

0

14. Hours Generator On-Line 311.5 5199.6 24736.0-
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 728568 5995328 25571808

"-~

17. Gross Elec. Energy Generated (MWH) 210920 5477680' 25054160
18. Net Elec. Energy Generated (MWH) 193890

-5223944

-23758788-

19. Unit' Service Factor 43.3-79.4-56.8
20. Unit Availability Factor 43.3 79.4 56.8
21. Unit Capacity Factor (using MDC Net) 24.3 72.1 49.3 22.. Unit Capacity Factor (using DER Net) 24.2 71.5 48.9

~23. Unit Forced Outage Rate 5 6. 7 --

19.4 35.1

24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

11/28/86

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81

'8-1-7.R2 8611100218 861031 PDR ADOCK 05000311 R

PDR