ML20215N567

From kanterella
Jump to navigation Jump to search
Submits Weekly Status Rept for 861027-1102.Core Drilling Rig Drilled 101 Holes Through Hard Crust at Top of Remaining Core.Removal of Drilled Fuel Pin Matl Scheduled for 861103. Outdoor Air Samples Below Limit of Quantitative Detection
ML20215N567
Person / Time
Site: Crane 
Issue date: 11/03/1986
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-86-106 NUDOCS 8611060360
Download: ML20215N567 (3)


Text

~

~

g w wo Novembar 3, 1936 ilRC/Till-3G-106 liEMORANDUM FOR:

liarold R. Denton, Director Office of fiuclear Reactor Rtgulation Frank J. fliraglia, Director Division of PWR Licensing-B FROM:

William D. Travers, Director TMI-2 Cleanup Project Directorate SUUJECT:

NRC Till-2 CLEAfiUP PROJECT DIRECTORATE ilEEKLY STATUS REPORT FOR OCTOBER 27 - Il0VEMBER 2, 1986 1.

DEFUELIliG The core drilling rig has drilled 101 holes through the hard crust at the top of the reaaining core uaterial. The test pattern area (19 holes) has been drilled down through part of the region containing fuel pins. These holes end approxicately 2 inches above the bottom spacer grid on the fuel assembly. Renoval of the drilled fuel pin material from the test pattern area is scheduled for Monday, November 3,1986. This will check the effectiveness of drilling fuel pins as a defueling technique.

2.

EDVIRONMENTAL P0flITORIliG US Environnental Protection Agency (EPA) sample analysis results show that TiiI site liquid effluents are in accordance with regulatory limit:,, HRC requirements, and The City of Lancaster Agreenent.

The Lancaster water sample taken at the water works river intake and analyzed by EPA consisted of a seven day ccaposite sample taken October 12 - 18, 1986. A gama scan detected no reactor related activity.

Till water sanples taken by EPA at the plant discharge (includes Units 1 and 2) to the river consisted of seven daily composite seaples taken from October 11 - 15, 1986. A gama scan detected no reactor related activity.

The EPA analyses of the fiRC outdoor air sample for the period October 23 - 31, 1986 showed that concentrations of' Cs-137 and 1-131 were below the lower limit of quantitative detection (LLD) for the sy s tca. The LLD varies around a value of IE-13 uC1/cc.

pgpotBatRBah!7ago 4

g n:c ronu na no-soi nncu ono OFFICIAL RECORD COPY

4 N

i m.

Harold R. Denton 2

Eover:bar 3,1986 Frank J. Miraglia haC/TiiI-86-106 3.

AUXILIARY /diD FUEL llANDLIl!G BUILDIliG ACTIVITIES Decontanination of the seal injection cubicles continues.

Reclamation of clogged Defueling Water Cleanup Systea (DWCS) filter canisters by flushing with hot boric acid is in progress.

iludifications are in progress to the fuel handling building (F!!B) ventilation systea. These codifications are in support of the installation of an engineered safety feature grade FHB ventilation systen for TiiI-1 as uandated by the Till-1 restart license conditions.

4.

HRC EVALUATI0iiS In PROGRESS Technical Specification Change Request nunbers 49, 51, 52, and 54.

Recovery Operations Plan Change nuc.bers 31 and 33.

,elid Weste Facility Technical Evaluation Report.

fleavy Load Safety Evaluation Report, Revision 3.

Disposal of Precessed Water Report.

Safety Evaluation Report for Use of Plesna Arc Cutting Torch.

S.

DEETING The next rweting of the Advisory Panel is tentatively scheduled for December 10, 1986. Exact time and location of the necting will be dn30ul.Ced in the future.

Persons desiring to speak before the Advisory Panel are requested to contact !!r. Thonas Snithgall at 717-291-1042, or virite hin at 2122 Wirietta Avenue, Lancaster, PA 17603.

% seen sy,

% 0. %

Will ha D. Travers Director Tiil-2 Cleanup Project Directorate FFICE) suRmy l NRC FORM 318 (10 80) NRCM O240 OFFICML RECORD COPY

)

s N#<

liarold R. Denton 3

Ifoveuber 3, 1986 c

Frank J. Hiraglia tiRC/TilI-86-105 Ii;TERNAL DISTRIBUTION

'CEiiTEL Fill fiRC PDR LOCAL PDR EDO OGC EPA DOE RI Regional Administrator RI Division Directors Public Affairs, RI State Liaison, RI Ti1I HQ r/f Ti I SITE r/f Till-2 Project Section File Ti1I-1 Resident Office (5)

TMI Cleanup Project Directorate (14) n OFFICE > TMICP h)

TM N TMICPD TM CPQ

,kkkkkkklfkg gh,

, h

.h,,,

3.e

^ ' ' > ll/f./86,,,

,,11/),/86,,,

,11/?,/86,,,

11/ >/86,,

sac sonu sia no soi wacu o2' OFFICIAL RECORD COPY