Submits Trip Rept of 860226-28 Visit to Facilities in Conjuction W/Duties as Expert Welding Team Members on FIN A-3839, Evaluation of Welding Concerns at TVA Operating Reactors
ML20215N433
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/18/1986
From: Czajkowski C
BROOKHAVEN NATIONAL LABORATORY
To: Liaw B
NRC
Shared Package
ML20214D842 List:
References
CON-FIN-A-3839 NUDOCS 8611050399
Download: ML20215N433 (10)


Text

, .,

Attachment 8

],

' ~

BROOKHAVEN NATIONAL LABQRATORY ASSOCIATED UNIVERSITIES, INC.

{e s um a Upton. Long Island. New York 11973 (516) 282 Department of Nuclear Energy FTS 666 2420 March 18, 1986 Dr. B.D. Liaw Eng. Branch . '

Mail Stop P-1132 U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Dr. Liaw:

This letter is being sent to document the visit of Messrs. P. Hasters, W.H. Munse, R.D. Stout and myself to the Sequoyah Nuclear Units on February 26-28, 1986. This site visit was made in conjunction with our duties as Expert Welding Team members on FIN A-3839 entitled " Evaluation of Welding Concerns at TVA Operating Reactors."

The trip report is broken up into three parts; each part will cover one days activity of the visit.

February 26, 1986 A. meeting was held at the Sheraton East Ridge, Chatanooga TN, at 15:00 hours on February 26, 1986. The meeting was attended by both USNRC personnel and welding consultants (Attachment #1). The purpose of the meeting was to discuss the TVA Welding Concern Program and establish the Celding Team Charter. Informal presentations were made by the following:

D. Smith /U. Long

1. Discussed an overview of the TVA welding concern program and established the charter of the Expert Welding Team.
2. The charter of the Team is not to address any vendor welds- 't will only address site related problems.
3. There are approximately 60 Sequoyah concerns on welding .out 500 total welding concerns.
4. Definitions of various acronyms were discussed, e.g., NSRS, QCT, LER, etc.

/ $? / , y

- 1 Q C l/ o 60399 My

Czajkowski to Liaw March 18, 1986 A. Herdt

1. Provided a discussion of TVA history of the plants including:
a. potential " generic" concerns
b. the fact that TVA does its own construction and design on its units
c. a definition of " employee concern"
2. Discussed the public meeting between USNRC and TVA of January 7,1986.
3. Described the TVA and USNRC telecon discussions of January 9,1986, and TVA's commitment for a physical reinspection of their plants.
4. Detailed the January 29, 1986, inspection report of Messrs. Crowley, Smith and Cortland.
a. Discussed report's Executive Summary
5. Described the work the USNRC NDE Van was performing at Sequoyah Units 1 and 2.

C. Czajkowski .

After NRC personnel left the meeting, I addressed the Team and detailed the specifics of the contract, the type of reports required, and most importantly, the independence which must, be maintained by the Team of Experts.

February 27, 1986 A meeting was held at 10:00 hours at the Sequoyah Nuclear Plant site between TVA personnel, USNRC personnel and the Welding Team (Attachment

  1. 2). A presentation was made by TVA personnel (Attachments 3-6) of the planned activities of TVA in evaluating the employee concerns expressed about the Sequoyah site.

Af ter the presentation, the Welding Team and NRC personnel were escorted on a tour of both *outts 1 and 2 (and common aress to both) which included many of the welds which were inspected by either TVA or the USNRC NDE Van or both.

Various stru r.aral welds and pipe welds were visually examined by the Team with no abnormalities noted.

Af ter the tour, the Welding Team discussed their observstions with USNRC NDE Van personnel.

i l

e .

March 18, 1986

' Czajkow. ski to Linw February 28, 1986 The Exit Critique of findings by NRC NDE Van personnel was convened at 10:41 hours (Attachment 7). The report of findings were given the number 327/328 86-13. The Van personnel had reviewed documentation for fifty pipe welds as well as seventeen structural weld packages. NRC Van personnel had inspected approximately:

350 structural welds (already inspected by TVA) 190 new structural welds (not previously inspected) 35 pipe welds (already inspected by TVA) 12 new pipe welds (not previously inspected)

There were some follow up NRC items from the inspection and some areas which were still under evaluation by NRC personnel, but one point was made on the reinspection:

"Me differences observed on the quality of welds inspected 2re not considered unusual or worse than industry norms.

I would like to note that both the TVA and NRC personnel were most forthright in providing answers to the Team in a timely and professional manner. If there are any questions, please contact me.

Veq truly yours, I j '

PN Carl J. z Jk i Attachments CJC/ad cc: Welding Team ,

P. Cortland U. Kato

' W. Long D. Smith

' J. Weeks 9

    • s e

_-_r - _ _ _ -- -

(3/18/86 Memo Attachment 1)

Meeting at the Sheraton East-Ridge, Chattanooga, TN Regarding Welding Concerns 2/26/86 - 1500 Hours Attendees NAME AFFILIATION Carl Czajkowski Brookhaven National Laboratory David E. Smith NRC/PWR-A/EB Alan R. Herdt NRC - Chief Engineering Branch, Region II Bill Long NRC/NRR Paul Cortland NRC/0IE Paul Masters Consultant - Brookhaven National Laboratory William H. Munse Consultant - Brookhaven National Laboratory Robert D. Stout Consultant - Brookhaven National Laboratory O

e o

- - - - - - - aw,-- , , , - - , .-r -r,-

(3/18/86 Memo Attachment 2)

Attendance List - February 27, 1986 NAME AFFILIATION J.E. Rose John Fox TVA L.E. Martin TVA-ONP Alan R. Herdt NRC - Chief Engineering Branch, Region II Bill Long NRC/NRR Project Manager for Welding Carl Czajkowski Brookhaven National Laboratory David E. Smith NRC/PWR-A/EB George Georgiev NRC/IE Robert D. Stout Consultant - Brookhaven National Laboratory William H. Munse Consultant - Brookhaven National Laboratory Paul Masters Consultant - Brookhaven National Latoratory John D. White TVA Engineering D.J. Etzler TVA Of fice of Engineering C.W. Hatmaker TVA Office of Engineering Gary J. Pitzl TVA Office of Nuclear Power Robert A. Montgomery TVA Office of Engineering Larry D. Alexander TVA SNP J.W. Coan TVA WP Robert M. Jessee . TVA WP

(3/18/86 Memo Attachment 3)

FFI DIN 3 FFDECT D4WTER EXR41tE 1}E GGANIZATIOfW. WELDING PROGPR45 IN WA, DETER 41tE ACTIONS THAT t/AY BE FEEDED, NO TAKE T10SE ACTiais tEGSSARY TO ASSURE 11%T anURE WA PERF00ED haDItG ACTIVITIES ARE IN ACCmD WlTH WA'S Cot 4 TO EXCELLEICE IN ITS tlXLEAR PROGP44.

WRIFY Ti%T THE WA PERFm/ED HADING OF STRUCTURES, PIPING SYSTEMS, NO OTHER SAFETY-RELATED PL## CDP 0tEtRS, WHIG ARE CURREtaLY IN PLAG AT WA'S tDQ_ EAR PLNRS ARE /OEQUATE TO MET WA, CCDE, NO REGULATmY REQUIRBEtJS.

t TE PRimlTY WILL BE AS FO LOVS:

1. SEQUOYNi
2. VATTS BAR
3. BROVNS FERRY t

I 4. FW lFFORE

\

l l

esse.es l

l l

l Ifl nlNG PRlFCT 1

l NI ENG QM.lTY -

M3T RnECT E(P, ERS (Li&NSING)

. STMF t@t@ER o OTC g

J. W. 00H ---- o EGsG I

PRQfCT STAFF OWSLLT#lT (PEO4TEL POER CORP.)

F. C. BREl9ElSTER O

O R

FERSWAL ERVI&S PRRECT PRGECT PRRECT PRRECT $

FCR VARIOUS ENGIMER ENGIMER ENGIMER ENGI S mim AVEC15- (INTRACT ENGIMERIm OWSBUCTICN CPERATICNS E

. BY (INTRACKRS KNINlSTRATim Prom #5 PRER#S MS j H.S. E00ER R.M. .F N F S.P. STKN1.lA G.J. PITA. I .

[

095 % 0.02

(3/18/86 Memo Attachment 5) !

Fw KEE RAT I TE PRlhMRY PURPOSES CF Pl%SE I ARE TO ENSURE THAT Tm TVA PROGRAM, DESIGN DOCUEMS, POLICIES AND PROCEDURES CORRECTLY EFLECT TVA COfdlTENTS NO REGJLATmY EQUIRDEMS #D TO IDENTIFY #O CATEGCRIZE CONCERNS DEFICIEtCIES IN lHE b'dLDING PROGRAM.

FHLT II TE PRibMRY PURPOSES & PlaSE II ARE TO:

EVALUATE THE IMUFENTATICT & PROCEDURES VERIFY THAT INSTALLED hE. DENTS FEET EQJIRDENTS CR ARE ADECL Fm SERVIG

- CCRRECT ## PRCELEMS, Ibf'LDENT 0%NGES TO PREVENT ECURRENCE 096002.02 ma

  • (3/18/86 Memo Attachment 6)

/CTICN RM PFM T l

1. REVIEW WA C0441VEtRS TD fRC
2. WRIFY THAT hRITTEN PROGRA'4 REFLECTS C0441TFENTS
3. ASSEbELE QJALITY ltolCATmS G " WELDING CONCERNS" BY TY
4. TREtO NO EVALUATE EFFECT & "QJALITY ltOICATORS" ON PR&iRA
5. ISSUE ADE0JACY STATBENT RECARDitG hRITTEN PROGRA COURQ. ELDING RAT 11
1. PERF0@4 ELDING PROGR44 l>PLDENTATIQ1 AUD1T C01STRUCTIQ1 PROGR44 l>PLDENTATIQi CPERATIONS PRO @/M l>PLEFENTATIQi
2. EVALUATE EED FCR A00lTlalAL REINSPECTIONS
3. IbPLEFENT ANY ADDITIO4AL RElls?ECTIONS NO DEFICIENC ltolVIDUAL NO EtERIC CASES)
4. YELDING PROJECT WILL ISSUE FINAL REPORTS, EA04 PLANT 0X202.02 e e, ..o, e
          • e**e

'- a---- - -- - - - -

. e (3/18/86 Mems Attachment 7)

Attendance Roster Exit Meeting NAME AFFILIATION Robert Birchell Compliance SQN Larry S. Bryant Mech. Maint. SQN Cary S. Boces Mech Maint. SQN M.A. Skarzinski SQN Paul Herman NRC Clenn B. Kirk SQN William R. Ramsey SQN B. Patterson SQN P.R. Wallace SQN N. Choules NRC- Region III Dolan Falconer NRC-Region II Donald S. Brinkman NRC-0IE J.T. Taffanstedt SNIP J. Blankenship Info. Office D. Persinko NRC/DHFT/MTB R. Lloyd NRC/IE Arthur Howell, III NRC/IE Owen Gomley NRC/IE L. Watson NRC Region II Michael Purcell Regulatory Engineering L. McCormick Regulatory Engineering W.S. Wilburn Site Services M.R. Harding SQN H.D. Elkins, Jr. . SQN R.V. Pierce Mech. Mth./SNP R.W. Olson SQN-Modification R.C. Denney Design Services SNP A.R. Meller NSS F.E. Denny OE-QMS R.N. Butler QA Staff Roger Landis Mods / Mech M. Sedlacik Mod L. Alexander Mod W. Liu NRC Region II R.W. Newsome NRC Region II H. Kerch NRC Region I A. Herdt NRC Region II B. Crowley NRC Region 11 D.E. Smith NRC/NRR/PWR-A George Georgiev NRC/IE J.H. Fox TVA Cary J. Pitzl TVA Office of Nuclear Power l J. Brandy HM/SNP Gerald Minton TVA L. Mink TVA D Mickler Construction Robert D. Stout Consultant - Brookhaven National Laboratory Carl Czajkowski Brookhaven National Laboratory Paul Masters Consultant - Brookhaven National Laboratory William H. Munse Consultant - Brookhaven National Laboratory J.W. Coan . TVA W.O. Long NRC

..