e Northern States Power Company 414 Nicollet Man Minneapoks Minnesota 55401 Telephone (612) 330 5500 October 27, 1986 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission-Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 LICENSE NOS. DPR-42 50-306 DPR-60 Supplemental Information Related to Implementation of Generic Requirements - Plant Specific Review The purpose of this letter is to supplement our June 2, 1986 letter which responded to an NRC Staff request for informa-tion dated dated April 30, 1986 from Mr Dominic C Dilanni, Senior Project Manager, Project Directorate #1, Division of PWR Licensing A, USNRC.

Several items in the original list provided with the April 30, 1986 letter could not be identifed by NSP.

Followup discussions with the NRC Licensing Project Manager for Prairie Island has clarified these items.

The attached corrected list was prepared in conjunction with the Prairie Island NRC Project Manager using additional information provided by the NRC Staff.

Based on the clarifications of these items provided by the NRC, the corrections to the status list are believed to accurately reflect the status of these review items.

Please contact us if you have any questions related to the information we have provided.

b m

David Musolf Manager Nuclear Suppo t Services c:

NRR Project Manager, NRC Dg Resident Inspector, NRC Regional Administrator, Region III, NRC hg G Charnoff k$d10jjfyK05000202 Attachment 2 861027 P

PDR

  • ?

R-1208731-001 REGULAT0RY I ll F 0 R H A T I O !!

TRACKIItO SYSTEH PA2E llo.:.382 03/31/16 FACILITY I 11 P L E li E il T A T I O II FACILITY: PRAIRIE ISL A!!D 1 PL AllT LOCATIO!Is 28 HI SE OF HIllilEAP'0LIS, flilitt LICEllSETI Pol!ER: 1650 tillT FROJECT HAllAGER D. DIIAllll!

DOCKET llull8ER: 050-00282 DESIGN Poller:

0530 Mile BRAllCll ClllEF:

G. LEAR flSSS VENDORS llEST LIC. ASSISTAllTs P. SiluTTLEll0RTH A RCll/ EllGIllE E R s IPI IE IllSI'ECIOR:

C. FEIERABEllD 1TC ACT LICEllSEE Cf}RLgig }IAltli ))Alg tac t:0 IIPA I TIILE 11/14/80C Note 1 11/80 (Complete) t106336 A-01 to CFR 50.55 A(G) - ISI 01/Ol/70C L _ ( M 9 [ *M 1108289 A-01 10 CFR 50.55 A(G) - ISI 10/21/82C. Ilote 1 1/83 (Complete) 1108151 A-02 APPEllDIX I - ALARA 03/14/79C 3/79 (Complete) 1106949 A-03 SECURITY REVIEllS-Il0DIFIED A!!EllDilEllT PL Alls 02/23/83C 2/83 (Complete) 1108250 A-04 APFEtIDIX J - CollTAlli!!Elli LEAK TESTIt!G 12/Ol/8tC 12/81 (Complete) 1106853 A-08 ECCS EVALUATI0tt-GEllERIC PER 50.46 C0t1PLTAllCE 02/27/8tc -Nat e-4 --k8) (ggfgt PRESSURE VESSEL BELTLillE FIATERI AL SURVEILL AtlCE !!I9387 A-09 02/25/81C Note 1 2/81 (complete) (180398 A-10 COIITIllGEllCY PL AllllIllG 02/25/8tC Note 1 2/81 (Complete) Ill0402 A-11 GUARD TRAltlil10 Pt Alls 04/12/82C _E M 4'/*r Il10400 A-12 VITAL AREA AllALYSIS (188429 A-14 10CFR 50.55 A(G) - IllSERVICE TESTIIIG OI/04/83C Note 1 1/83 (Complete) 12/83 (Complete) 1147399 A-16 QUALIFICATI0tlS OF EXAHillATI0ll, IllSPECTI0ft, TESTir10 08/12/82C !!58822 A-17 IllSTRUMEllTATIO!! TO FOLLoll Tile COURSE OF All ACCIDEll 10/18/85C 6/87 (Projected) 1155731 A-18 TECH SPECS AFFECTED BY 50.72 AtID 50.73 (GL 83-43) 06/25/85C Note 1 6/85 (Complete) 5/87 (Projected) II//S / 1159130 A-20 to CFR 50.62 OPERATIt!G REACTOR REVIEllS Ilote 3 1/86 (Complete) !!59974 A-21 t o CFR 50.61, PRESSURIZED TilERNAL Sil0CK RULE 09/16/79C Note 4 6/85 (Complete)

  • 05587 B-02 FIRE PROTECTIO!!

tt 11/26/80C M g (q 1108394 B-03 PllR tt0DERATOR DILUTIO!! _ o(M\\ 01/0I/70C m __ g fl06620 B-04 REACTOR VESSEL DVERPRESSURE PROTECT 10ll 08/03/79C Note 1 8/79 (Complete) 1106807 B-04 REACTOR VESSEL OVERPRESSURE PROTECTIUit NSP PAGE 1'OF 14

R-1208F31-001 REGUL.AT0RY I II F 0 R 11 A T I O 11 TRACKING S Y S T E tt PAGE ilo.:.333 03/31/86 FACILITY I !! P L E H E il T A T I O II PRAIRIE ISt AllD 1 (CollTIlluATI0ll) LIC ACT LICEllSEE IAC_HQ,. HEA_1 TULE COHElflg $IAlld PAIE 1107278 B-07 STEAM GEllERATOR FEE 0llATER FL0il IllSTABILITY 09/13/79C 9/79 (Complete) 05/04/81C 5/81 (Complete) 1108752 B-14 CEA GUIDE TUBE IIEAR __ (($ l [C e: 2 1112348 B-16 EHERGEllCY PL AtillIllG AllD REVISf ollS 04/Ol/8tC u H08754 B-17 TECll SPEC SURVEILLA!!CE FOR llYDRAULIC SiluBBERS 10/28/81C Note 1 10/81 (Complete) __ (M 1110269 B-20 CollTAllt!!EllT LEAKAGE DUE TO SEAL DETERIORATI0tl 08/25/80C w p __ (j _ _ 0.,d ) fil0333 B-21 LOSS OF 125-V DC BUS VOLTAGE It!Til LOSS OF AfilfUllCIA 02/28/82C n-1108756 B-22 TECil SPEC SURVEILL AllCE REQUIREttEllTS FOR HECllAtlICAL 08/14/81C Note 1 8/81 (Complete) (Complete) [ ( k ) 07/28/8tC Note 1 7/81 1108734 B-23 DEGRADED GRID VOLTAGE a. 1110045 B-23 DEGRADED GRID VOLTAGE (* b T4 % 01/01/70C t' - - __ (J p a 1 H10156 B-24 VEllTIllG AllD PURGIllG C0!!TAlli!!EllTS IlllILE AT FULL Poll 08/25/80C [_ _ a. @ im -- ( M 1110157 B-24 VEllTIllo AllD PURGIllG CollTAlllllEllTS lillILE AT FULL Poll Ol/01/70C J NOO Nat.a 2 -- ( M 1142592 B-24 VEllTIllG AllD PURGIllG CollTAlllHEllTS IIIIILE AT FULL Poll 09/09/82C 9/84 (Complete) 1110231 B-26 IllADVERTAllT SAFETY IllJECTIOll DURIllG C00LD0llt! 12/28/79C 12/79 (Complete) I ua. 2_ 1149429 B-32 BLOCKED SI SIGtlAL DURIllG C00L Dolllt 02/23/83C N08665 B-39 PilR PRESSURE - TEllPERATURE LIMIT TECil SPECS lt/13/30C ";:: 2- -- ( M " iT-S SER S 01/09/84C "-:: 2 -- O ^ ^iTA^ ^- FIREPROTEC{IO TEEll SPgS (gigt,U 1149949 B-41 t til1094 B-41 FIRE PROTECTI0ll - FIllAL TECll SPECS (IllCLUDES SER S 05/04/83C Note 5 5/83 (Complete) 06/15/81C ?!2 : 2 M 1113126 8-42 Till FOLLDIl UP - ALL PL AllTS M sp[ e 06/15/81C ":-S M11694 B-42 Till FOLLoll UP - ALL PL AllTS 02/06/80C N.e 3 J.[To (

  • tli l77 3 B-43 PilR FEEDilATER LIllE CRACKS

__ g h {,_ g 05/25/82C he-.2 M43147 B-43 PilR FEEDilATER LIllE CRACKS 04/18/80C !!ote 6 4/80 (Complete) 1130708 B-44 LES50lls LEARilED IllPLEMEllT ATIOil 04/18/80C 4/80 (Complete) ( !!30709 B-44 LESS0tlS LEARilED IllPLEHEllTATInil { NSP PAGE 2 0F 14 1 e

R-12a1731-001 REGULATURY I fl F 0 R H A T I O Il TRACKIilC SYSTEH. ,'PAGE llo,e 384 FACILITY I H P L E 11 E il T A T I O II 03/31/86 PRAIRIE ISLAllD 1 (CollTIllUATIO!!) LIC ACT LICEllSEE I E _! & tjPA 8 TIJLE CDHPtElf IIAlln EAlf 1130/10 B-44 LESS0!!S LEARilED IllPLEMEllTATI0tt 04/18/80C 4/80 (Complete) H307tt B-44 L ESSullS LEARilED IllPL EllEllTATI0li 04/ts/80C 4/80 (Complete) 1130712 B-44 LESS0lls LEARilED IllPLEMEllTATinti 04/18/80C 4/80 (Complete) It30713 B-44 L ESSollS L EARilED IllPLEMEllTATI0li 04/18/80C 4/80 (Complete) 1130714 B-44 LESSollS LEARilED IllPLEHEllTATI0ft 04/18/80C 4/80 (Complete) I!30715 B-44 L ES50lls LEARilED IllPLEMEllTATIOff 04/18/80C 4/80 (Complete) 1130716 B-44 LESSolis LEARilED IllPLEllEllTATIoll - 04/18/80C 4/80 (Complete) 1130717 B-44 LES$0lls LEARllED IftPLEllEllTATI0li 04/IS/80C 4/80 (Complete) 1130718 B-44 LESS0!IS LEARilED It!PLEt1EllTATI0tl 04/18/80C 4/80 (Complete) 1130719 B-44 LESS0llS LEAR! LED IMPLEMEllTATInfl

  • 04/18/80C 4/80 (Complete) 1130720 B-44 LESS0!!S LEARilED IllPLEftEllTATI0tt 04/18/80C 4/80 (Complete)

!!30721 B-44 LES50lls LEARilED IllPLEHEllTATI0li 04/18/80C 4/80 -(Complete) til2932 B-45 llASil 1400 EVEllT V, "PRIllARY C00LAlli SYSTEM PRESSUR 04/20/8tC Note 1 4/81 (Complete) !!42116 B-46 AllALYSIS OF TURBillE DISC CRACKS (M } 04/01/8tC " :- ?_ -- d$l ( C. H12591 B-46 AtlALYSIS OF TURBillE DISC CRACKS 09/01/ SIC 10/81 (Complete) __ y/g ( 6 - g-h H12683 B-47 ECCS: CL AD SilELLIIIG AllD RUPTURE 07/30/80C "-:: 3 ^ H12966 B-48 ADEQUACY OF STATIO!! ELECTRIC DISTRIBUTIoll VOLTAGE 10/29/82C 10/82 (Complete) til 3038 B-49 PllR CollTROL ROD !!!SALIGilHEllT 07/28/8tC Note 1 7/81 (Complete) Htt374 B-52 REVIEli 0F SAFETY ASPECT OF IllADVERIElli SAFETY ACTI t0/23/80C iol80C M J

  • tt42898 B-59 ilASollRY llALL DESIGil 09/12/83C 9/83 (Complete)

H42500 B-60 EllVIR0!!!!EllT AL QUALIFICATI0!! 03/25/85C 11/85 (Complete) 1142699 B-61 LOSS OF !!O!! CL ASS IE ISC P0llER 07/28/82C "T-2 -- "7[$ 1 ( 1142770 B -6,2 ESF RESET C0!! TROL DESIGli DEFICIEllCY 04/30/81C Note 7 -- NSP PACE 3 OF.14 9

R-1208731-001 REGULAT0RY I il F 0 R H A T I C !! TRACKi!!0 $YSTEH PAGE ilo.: 385 03/31/85 FACILITY I tt P L E H E il T A T I O II PRAIRIE ISL AIID I (CollTIllUATIO!!) LIC ACT LICEllSEE JAC flo. UIJL1 TIILE COMPIEff. 11 Alt!1 IL(If. 1/82 (Complete) H43927 B-63 IllTERIH PROCEDURES FOR Sil0RT TERH BL ACKOUT Ot/22/82C 07/18/83C 7/83 (Complete) 1147150 B-66 !!ATURAL CIRCUL ATIDil C00L D0ll!! 10/82 (Complete) 1146353 B-69 IER 80-4 ftAltlSTEAll LillE BREAK llITil CutlTIllUED FEEDil 10/25/82C I (e~e7 t" OV 'g - ^^ 05/25/82C

1..

H46630 B-70 FATIGUE TRAllSIEllT LIMIT TS M49750 B-72 !!UREO 0737 TECil SPECS (GEllERIC LETTER 82-16) Ot/15/83C tiote 8 4/83 (Complete) 06/01/84C !! ate 9 8/85 (Complete) H52789 B-76 ITEM t.1 - POST TRIP REVIElls PROGRAH DESCRIPTI0tl 8 H52870 B-77 ITEtt 2.1 - EQUIrttEllT CLASSIFICATI0tl & VE!!DDR IllTER 06/01/84g r___ -- (p] !!52951 B-78 IT EttS 3.1.1 & 3.1.2 -POST HAltlTEllAIICE TEST PROCEDU 06/01/85C !!ote 10 5/85 (Complete) H53032 B-7 9 ITEtt 3.t.3 - POST HAIllTEllAllCE TESTIllG - CllA!!GES TO 06/01/84C tiote 11 10/85 (Complete) tt$3089 B-80 ITEtt 4.1 - REACTOR TRIP SYSTEll RELIABILITY - VEllDO 06/01/85C tiote 10 5/85 (Complete) !!53142 B-81 ITEtts 4.2.1 & 4.2.2 -PREVEllTATIVE HAltlT PROG FOR R 10/17/85C 10/85 (Complete) 06/01/84C 3/85 (Complete) 1153188 B-82 ITEtt 4.3 - AUT0!!ATIC ACTUATIott OF SilutlT TRIP ATTAC It53622 B-85 SALEtt Aills 1.2 DATA CAPABILITY 06/01/84% "" ^ ? ? - a[gg (p \\ H53705 B-86 SALEtt ATilS 2.2 5-R COMPO!!EllTS 06/08/84% Note 13 ttS 5788 B-87 SALEtt ATils 3.2.1 & 3.2.2 S-R COHPOtIEllTS 05/13/85C 5/85 (comple te) 06/01/84C 10/85 (Complete) 1153871 B-88 S AL E!! ATils 3.2.3 T.S. 5-R CollPOtIEllTS 1153929 B-89 SALEll Aills 4.2.3 & 4.2.4 LIFE CottrollEllTS 10/31/86 tiote 14 06/26/8SC 2 6/85 (Complete) H55370 B-90 SALEM AfilS 4.3 II AtlD Ball T.S. 05/13/85C 5/85 (C plete) !!54098 B-92 SALEtt ATIIS 4.5.1 DIVERSE TRIP FEATURES

  • S4015 B-93 SALEtt Afils 4.5.2 & 4.5.3 TEST ALTERllATIVES 06/01/8%

Note 14 tt a fl06486 C-01 Pi!R SEC0tIDARY llATER CIIE!!!STRY t10llITORIl10 REQUIREltE 03/28/78C m-fl07514 C-Ol PilR SEC0tIDARY llATER CllEttISTRY ttallITORIllG REQUIREME tt/13/8tc 11/81 (Complete) 09/15/8tC

'
: !5 (M q7 lim 1108748 C-06 PullP SUPPORT-L AttELL AR TEARIllG IISP PAGE 4 OF 14

R-1208731-001 REGULAT0RY I II F 0 R H A T I O II TRACKIIIG SYSTEH PAGE fle.e.386 FACILITY IHPLEHENTATIOll 03/3f/8,4 PRAIRIE ISLAIID I (C0!aTI!!UATI0ll) LIC ACT LICEllSEE JAC 180 []PA_1 TillE LO!111EIE iTATUS EAlf m 1108750 C-07 FUEL llAllDLIIIG ACCIDEllT IllSIDE C0!ITAIllitE!!T 02/02/82C 2/82 (Complete) --- (M 08/14/80C "^*" 'S 1107298 C-09 Pi!R AUX Fil PuttPS t108075 C-10 00llTROL OF IIEAVY L OADS OVER SPEllT FUEL POOL (PilASE 06/06/83C Note 17 6/83 (Complete) 1143657 C-14 AUXILIARY FEEDilATER SEISHIC QUALIFICATI0!I 06/16/83C 12/84 (Complete) !!52260 C-15 CollTROL OF llEAVY LOADS - PilASE II (FDLL0l!UP OF HPA 06/28/85C Note 18 6/85 (complete) " ee 2 3 % (qp ttS8080 C-16 UTILITY RESPollSES 10 STAFF REC 0!!!!EllDATI0lls C0!!CERif It07872 D-02 ECCS ZIRC CL AD 110 DEL ERROR-ColtPLIAllCE IIITil 10 CFR-04/20/79C { 1107854 D-03 PRESSURIZER llEATUP RATE ERROR 11/Ol/78C Note 1 11/78 (Complete) 1108351 D-05 PL AllT UPI 110 DEL PROBLE!! p pl/;p mens-c7 u 7108731 D-10 ASYtt!!ETRIC LOCA LOADS , g2}gg { t ha " '" u.m 9 02/22/30C

n gp {Q}

tt08995 D-11 FISSIO!I GAS RELEASE fil2273 D-15 IIIGli EllERGY LI!!E BREAK 8 CollSEQUENTIAL SYSTEH FAIL 12/01/80C

_ 7 j

!!43033 D-17 DEFIllITI0!l 0F DPERABLE 07/28/8tC Note 1 7/81 (Complete) H55892 D-19 DIESEL GEllERATOR RELIABILITY TECll SPECS (GL 84-15) 09/06/85C gg (' _ ;1__ 4 l f ig ( M10727 E-03 CORE RELOADS REQUIRIllG PRIOR llRC APPROVAL 04/27/79C tt44050 F-01 I.A.1.1 SilIFT TEClllllCAL ADVISOR 07/06/82C 1/80 (Complete) 1144119 F-02 !.A.1.3 SilIFT ItA!!!Ill!G 04/06/83C 4/83 (Complete) 1144190 F-03 I.A.2.1 UPGRADIllG OF R0 AllD SRO TRAltlING 12/14/82C 12/82(Complete) 1144261 F-04 I.C.I.2/3. A E!!ERGEllCY OPERATIllG PROCEDURES GEllERIC 06/07/84C 6/84 (Complete)

  • 44331 F-05 I.C.1.2/3.5 PROCEDURES GEllERATI0li PACKAGES (!!UREG

-03/01/86 Note 19 -- tl e)/fo/$]L 1/82 (Complete) 01/04/82 1147244 F-06 I.C.5 FEEDBACK OF DPERATIIIG EXPERIEllCE 1147316 F-07 I.C.6 CORRECT PERFORilAllCE OF OPERATI!!G ACTIVITI of/04/82C 1/82 (Complete) 1151192 F-08 I.D.1.1 DETAILED C0!! TROL ROO!! DESIGil REVIEll PROGRA 10/10/846 3__Va6Cc M ) u i NSP PACE 5 OF 14 O

0-1208731-001 REOOLATORY IOF0RHATI@Q TRACKIOO 5YSTEH PAGE No.:.347 FACILITY IHPLEHENTATION 03/31/06 PRAIRIE ISLAllB t (CollTINUATIoll) LIC ACT LICEllSEE TAC !!L ltPA I TITLE CDPtPLElf IIMlli R&lE H51272 F-09 I.D.2 SAFETY PARAllETER DISPLAY SYSTEtt 07/15/85C Note 21 12/86 (Projected) 9/83 (Complete) H44398 F-to II.S.1 RCS HIGli POIllT VEllTS 09/19/83C 10/83 (Complete) H47767 F-11 II.B.2 PLAlli SHIELDING 10/12/83C j M44469 F-12 II.B.3 POST ACCIDElli SAMPLIIIG 11/23/83C Note 22 11/83 (Complete) 12/82 (Complete) 1144540 F-13 II.B.4 TRAINIllG FOR HITIGATIllG CORE DAMAGE 12/14/82C If5[d7 Note 23 ata'*L M44510 F-14 II.D.1 RV AIID SV TRAINIIIG t144647 F-15 II.E.1.1 Afil SYSTEft EVALUATI0li 03r22/82C Note 24 3/82 (Complete) i H42541 F-16 II.E.1.2.1 AFil SYSTEH INITI ATION 03/22/82C 3/82 (Complete) H44726 F-17 II.E.1.2.2 AFil SYSTEtt FL0ll IllDICATIoll 03/22/82C 3/82 (Complete) M44808 F-18 II.E.4.1 DEDICATED llVDROGEN PENETRATIDH 06/01/82C 6/82 (Complete) 1144879 F-19 II.E.4.2 CollTAlllHEllT ISOL ATION DEPENDABILITY 09/e9/82C 9/82 (Complete) H44950 F-20 II.F.1.1 N00LE GAS HollITOR 11/09/81C 4/82 (Complete) H45021 F-21 II.F.1.2 10DIllE/PARTICUL ATE SAMPLIllO I1/09/8iC 9/82 (Complete) 2/82 (Complete) H45092 F-22 II.F.1.3 C0llTAlllllEllT HIGli RAIIGE MONITOR , Ol/28/82C 04/21/83C 1/82 (Complete) H47628 F-23 II.F.1.4 ColliAlllHElli PRESSURE IllSTRUMENT M47699 F-24 II.F.1.5 CONTAlllHENT llATER LEVEL IllSTRUMEllT 84/21/83C 12/81 (Complete) H47770 F-25 II.F.1.6 CONTAIllllEllT llYDR0 Gell HONITOR 84/21/83C 12/81 (com Icte) 1145162 F-26 II.F.2 INSTRUMEllTS FOR DETECTI0li Oil IIIADEQUATE

  1. "///h N
  • bM N

6-'- 6/84 (Comhlete) j M46899 F-30 II.K.2.13 TilERilAL-HECllAlllCAL REPORT 06/06/84C 'll47813 F-33 II.K.2.17 PDTEllTI AL FOR VOIDIllG IN RCS 12/30/A3C 12/83 (Complete) M45244 F-36 II.K.3.1 AUID PORV ISOLATI0ll 09/16/83C 9/83 (Complete) j 9/83 (Complete) H45290 F-37 II.K.3.2 REPORT Dil PORV FAILURES 09/16/83C H45372 F-38 II.K.3.3 REPORTIllG SV AIID RV FAILURES Ai!D CllALLE 03/05/82C 3/82 (Complete) l ~ j IISP PACE 6 OF 14

R-1258731-001 REGULAT0RY IOFGRHATIOO TRACKICC SYSTEH PAGE No.: ' 388 ~ 83/31/86 FACILITY IHPLEHEffTATION PRAIRIE ISLAllD 1 (CotiTIllUATIDH) LIC ACT LICENSEE fallf1Hg iTATus RAIE IAC fin. HPA 3 TITIE g (c.,,sa *= "c ^ y 42/08/83C P145407 F-39 II.K.3.5 AUTO TRIP OF RCPS If/30/81C 11/81 (Complete) M45456 F-40 II.K.3.9 PID CollTROLLER 11/81 (Complete) 1t/30/8tC 1145486 F-41 II.K.3.t0 AllTICIPAIORY TRIP HDDIFICATIolls 1t/30/8tC 11/81 (Complete) It45516 F-42 II.K.3.12 ANTICIPATORY TRIP 0!I TURRIllE TRIP 08/tI/83C 8/83 (Complete) H45658 F-47 II.K.3.17 ECCS OUTAGES 06/t7/82C 6/82 (Complete) H48428 F-53 II.K.3.25 Poller ON PUNP SEALS 06/06/85C 6/85 (Complete) M45855 F-57 II.K.3.30 58 LOCA HETil0DS 01/15/87 Note 27 4/86 (Complete) 1148194 F-58 II.K.3.38 C0f!PLI AllCE HITil t o CFR 50.46 Note 28 12/83 (Complete H45974 F-63 III.A.1.2 TECittlICAL SUPPORT CEllTER y/p/ffc.tae5tT88 -12/83 (Complete) 884 M H45045 F-64 III.A.1.2 OPERAII0tlAL SUPPORT CEllTER Note 28 12/83 (Complete) f!46117 F-65 III.A.1.2 EHERGEllCY OPERATIO!!S FACILITY y /ffrtc 88dd1908 07/30/82C ] ( H46t&9 F-66 III.A.I.2 HUCLEAR DATA tillK 85/13/83C 5/83 (Complete) ENERGEllCY PLAft UPGRADE 10 MEET RULE M46261 F-67 III.A.2.1 12/83 (Complete) H46335 F-68 III.A.2.2 PfETEOR010GICAL DATA UPGRADE gg(der $tratr 03/02/82C 3/82 (Complete) !!46404 F-69 III.D.3.3 IMPLANT RADIATIort HollITORING 2/84 (Complete) 04/09/82C 1146473 F-7 0 III.D.3.4 COtIIROL R00!! IIABITABILITY 447 tere 8 Note 29 I.D.1.2 DETAILED CollTROL R00H REVIEll (FDLLO!!UP TO o;/s)~/f& H56154 F-71 4 M Msse Note 19 REACTOR C00LAllT Puf1P TRIP (D660 - II.K.3.5) M/1//rG m H49663 G-01 NSP PACE 7 0F 14 l l

REGULAT0RY I la F 0 R H A T I Q 13 TRACKIIIO 5YSTEH PAGE :10.8 349 03/31/86 R-1218731-001 FACILITY I H P L E 11 E 11 T A T I O N FACILITYs PRAIRIE ISL AllD 2 PROJECT HAllAGERs D. DIIAllll! LTCENSED POtIERs 1650 Mitt BRAllCH CllIEFs G. LEAR PL AtIT LOCATI0llt 28 ft! SE OF hit!!!EAPOLIS, itIttti DEstGli Poller: 0530 1111E LIC. ASSIST Allis P. Shf1TTLEl10RTil DOCKET lluttBER: 050-00306 IISSS VEllDOR: IIEST ,i ARCH / E NGIllE EH s IPI IE IHSPECTOR: C. FEIERABEllD LICENSEE LIC ACT [ Mil 1 Elf 11 AIM Mif ttf gQ(C IAC_Ilh HPA I TLILE _2-t 03/31/8tC H08309 A-01 to CFR 50.55 A(G) - ISI 10/21/82C Note 1 1/83 (Cosaplete) H08152 A-02 APPEllDIX I - AL ARA 3/79 (Cossplete) 03/14/79C SECURITY REVIEllS-It0DIFIED AttENDHEHT PL AtlS 2/83 (Complete) It08758 A-03 02/23/83C APPEllDIX J - CollTAtt!!!E!!T LEAK TESTING 12/81 (Complete) H08729 A-04 12/01/8tC [CCS EVALUATI0ll-GEllERIC PER 50.46 COMPLIAllCE {(g kh It08746 A-08 05/19/80C PRES $URE VESSEL BELTLIllE HATERIAL SURVEILLAllCE 02/25/8tC Note 1 2/81 (Complete) liti370 A-09 H10399 A-10 CollTIrlGEllCY PL AHHING 02/25/8tC Note 1 2/81 (Complete) gk%8(d k lit 0403 A-11 GUARD TRAllt!!!G PL Alls --t 04/12/82C til 0401 A-12 VITAL AREA ANALYSIS 01/04/83C Note 1 1/83 (Complete) !!!!223 A-14 10CFR 50.55 A(G) - INSERVICE TESTItIG 12/83 (Complete)

  1. 147400 A-16 QUALIFICATIOllS OF EXAMINATIDH, INSPECTIDH, TESTING 08/12/82C 6/87 (Projected) 10/18/85C IllSTRUMEllTATIOli 10 FOLL0ll Tile COURSE OF AN ACCIDE!!

06/25/85C Note 1 6/85 (Complete) H51123 A-17 TECII SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 3/88 (Projected) H55732 A-18 N//S / t o CFR 50.62 OPERATIllG REACTOR REVIEllS Note 3 1/86 (complete) H59131 A-20 to CFR 50.61, PRESSURIZED TilERNAL Sil0CK RULE 09/16/79C Note 4 6/85 '(Complete) 3 H59975 A-21 t108730 B-02 FIRE PROTECTIDH uf. o L _ tl 80 (fteApl*kj 1t/26/80C 'H08395 B-03 Pi!R tt0DERATOR DILUTIDH 08/03/79C Note 1 8/79 (Complete) REACTOR VESSEL OVERPRES$URE PROTECTI0tl t108338 B-04 09/I3/79C SIEAtt GENERATOR IEEDllATER FL0ll It! STABILITY It07829 B-07 05/04/8tc It08753 B-14 CEA GUIDE TURE IIEAR NSP PACE 8 OF 14 O

~. REGULATDRY I 18 F 0 R H A T I O II TRACKIIIO SYSTEH PAGE 110.s.398 83/31/86 R-1208731-001 I H P L E H E !! T A T I O 11 FACILITY (CollT!!!UATI0ta) PRAIRIE ISLAllD 2 lICEllSEE LIC ACT jlil AI(11 FAIC Q)[UlfJg 6% ((cadph TIIIE ^ IAC iJO UfA_1 04/01/81C u EttERGEllCY PL AltllIllG At:D REVISIO!!S tiote 1 10/81 (Complete) H12349 B-16 hok etMild L 10/28/8tC TECit SPEC SURVEILLAllCE FOR llYDRAULIC SIIUBBERS 2 t108755 B-17 10/02/80C CollTAllt!!EllT LEAKAGE DUE TO SEAL DETERIORATIoll ROI ts Ph(Cas "M 1 fil 0270 3-20 02/28/82C LOSS OF 125-V DC BUS VOLTAGE IIITII LOSS OF AttflullCI A !!ote 1 8/81 (Complete) tit 0334 B-21 08/l4/8tC TECll SPEC SURVEILL A!!CE REQUIREllEllTS FOR HECilA!!! CAL tiote 1 7/81 (Complete) i 11087 57 B-22 Agt.09plf ced k 07/28/8tc tt08735 B-23 DEGRADED GRID VOLTAGE 2-- 01/01/70C Ak TP tlic044 B-23 DEGRADED GRID VOLTAGE _2-03/05/8tc VEllTIllG AtID PURGillG CollTAttiftE!!TS lillILE AT FULL Poll 9/84 (Ccaplet e) H11330 B-24 09/09/82C VEllTIllG AllD PURGIllG C0tlTAIIINEllTS ltil!LE AT FULL Poll __ gdytt (c,owIk 1142622 B-24 St: 2 12/28/79C k IllADVERTA!IT SAFETY IllJECTInti DURIIIG C00LDolit! nok 9f ' 1180232 B-26 02/23/83C -T BLOCKED $1 SIGilAL DURIllG C00LDoliti __ h Opglitd!t H49430 B-32 ft/13/80C m Pi!R PRESSURE - TEllPERATURE. LIMIT TECll SPECS -- ROY YF! H08680 B-39 Ot/09/84C e FIRE PROTECTI0tl - FIf!AL TECil SPECS (IllCLUDES SER S 05/04/83C Note 5 5/83 (Complete) fl49950 B-41 FIRE PROTECTIDil - FIllAL TECil SPECS (IllCLUDES $[R S g g \\ts k Hit 095 B-41 06/15/81C y u Aat-incelttokki - Hl3127 B-42 Till FOLLoll UP - ALL PL AllTS 06/15/81C

r. : 3 Htt695 B-42 THI FOLL0ll UP - ALL PL AtlTS

__ d g ((og e fg \\ l n,,o 3 02/06/80C Hit 774 B-43 Pl!R FEEDilATER LIllE CRACKS _ hd Coyld 05/25/82C n,,_ 7_ H43148 B-43 PilR FEEDl!ATER LIllE CRACKS 04/18/80C IIore 6 4/80 (Complete) LE550fl5 LEAR 11ED IttPLEttEllTATIO!! H30722 B-44 04/18/80C 4/80 (ComplAte LE550tl5 LEARilED It!PLEllEllTATID:t 04/18/80C 4/80 (Complete) 'll30723 B-44 LE550!!S LEAR! LED IllPLEftEll! ATI0li H30724 B-44 04/18/80C ggg LE550lls LEARt!ED IttPLEttEllTATIoli ft30725 B-44 04/18/80C L ESSotIS LEARilED IllPLEllEllTATIoli !!30726 B-44 ilSP PAGE 9 0F 14 e

R-1208731-003 REOOLATQRY I II F 0 R H A T I O II TRACKIOO 5YSTEH PAGE 110.8 391 83/31/86 FACILITY IHPLEHENTATION PRAIRIE ISLAllD 2 (C0!! tit!UAT!0til LTC ACT LICEllSEE JAC lin ItPA 9 TTT1E EtEllIf IIAllli EAlf m 04/18/80C 4/80 (Complete) H30727 B-44 LESSolis LEARilED IttPLEHEllTATI0li 04/18/80C 4/80 (Complete) H30728 B-44 L ESS0t!S LEARilED IllPL EllEllTATIO!I 04/18/80C 4/80 (Complete) t130729 B-44 LESS0!IS LEARIIED IltPLEHEllTATI0tl 04/18/80C 4/80 (Complete) H30730 B-44 LES50lls LEARilED IMPLEMEllTATI0li 04/18/80C 4/80 (Complete). 1130731 8-44 LESSot!S LEARilED IttPLEllEllTATI0li 04/18/80C 4/80 (Compleic) !!30732 B-44 LESSolis LEARilED IttPLEllEllTATI0tt 04/18/80C 4/80 (Complete) !!30733 8-44 LE550!IS LEARilED IrlPLEMEllTATIoll 04/18/80C 4/80 (Complete). !!30734 B-44 LE550 TIS LEARilED It!PLEllEllTATIoll 04/18/80C 4/80 (Complete) F130735 B-44 LESSollS LEARilED IttPLEtlEllTATIoll 04/20/8tC tinte 1 4/81 (Complete) H12933 5-45 IIASil 1400 EVEllT V, "PRIllARY C00L AtIT SYSTEli PRESSUR 04/01/8tC pro __ g p o !!42117 B-46 AllALYSIS OF TURRIIIE DISC CRACKS 09/Ol/8tC 10/81 (Complete) Hl2592 B-46 AIIALYSIS OF TURBIllE DISC CRACKS 10/02/80C m __ go / g g lg H12584 B-47 ECCSs CL AD SIIELLIIIG AIID RUPTURE ADEQUACY OF STATI0ll ELECTRIC DISTRIBUTIori VOLTAGE 10/29/82C 10/82 (Complete) til2967 B-48 __ gg/go [plete) ak _7/81 (Com 07/28/8tc Note 1 til 3039 B-49 PilR CollTROL ROD HISALIGiltlEtIT go REVIEli 0F SAFETY ASPECT OF IIIADVERTEtIT SAFETY ACT! 10/23/30C _7 Hil875 B-52 9/83 (Complete) - 09/12/83C 1142899 B-59 HAsollRY llALL DESIGli 11/85 (Complete) 03/25/85C H42501 B-60 EllVIRotINEtITAL QUALIFICATI0ll " 07/28/82C Note 2 -- //ti k [ h h ~ H42700 B-61 LOSS OF flott CL ASS IE 18C Poller 04/30/8tc Note 7

  • 42771 E-62 ESF RESET CollTROL DESIGil DEFICIEllCY t!

1/82 (Complete) 01/22/82C H43928 B-63 IllTERIH PROCEDt'RES FOR Sil0RT TERH BLACKOUT 07/18/83C 7/83 (Complete) H47151 B-66 IIATURAL CIRCUL ATIoll C00LD0lIII IER 80-4 Halt lSTEAtt LIllE BREAK 111T11 CollTIllUED FEEDil 10/25/82C 10/82 (Complete) H45854 B-69 HSP PACE 10 0F 14 9

~. ~ R-1208731-001 R E G U L A T O-R Y I 11 F 0 R H A T I O 11 TRACKIIIO SY$TEH PAGE Ilo.s 392 03/31/86 FACILITY I il P L E H E N T A T I O fl PRAIRIE ISL AtID 2 (CollTI!!UATI0 fit LIC ACT LICEIISEE I AC 110 ttEA_1 TillE CottPIELE $IAlt!1 E&If 05/25/82C ?^*^ -- pa;Y appIttdk H46631 5-70 FATIGUE TRAtlSIEllT LIMIT TS H49751 B-72 IIUREO 0737 TECll SPECS (GEllERIC LETTER 82-16) 01/15/83C Note 8 4/83 (Complete) t152790 B-7 6 ITEM 1.1 - POST TRIP REVIElis PROGRAH DESCRIPTIO!! a 06/01/84C Note 9 8/85 (Complete) !!52871 B-77 ITEtt 2.1 - EQUIPt1Elli CL ASSIFICATInff a VEtIDOR IllTER 06/al/84f 2 opg W H52952 B-78 IT Ef ts 3.1.1 & 3.1.2 -POST ttA!!!TEtIAllCE TEST PROCEDU 06/01/85C tiote 10 5/85 (Complete) 1153033 B-79 ITEtt 3.1.3 - POST ttAttlTEllA!!CE TESTIt!G - CllAllGES 10 06/01/84C Note 11 10/85 (Complete) 1853090 B-80 ITEM 4.1 - REACTOR TRIP SYSTEtt RELI ABILITY - VEllDO 06/01/85C tiote 10 5/85 (complete) t15314 3 B-81 IT EttS 4.2.1 8 4.2.2 -PREVEllTATIVE Mall 1T PROG FOR R 10/17/85C 10/85 (Complete) 1153189 B-82 ITEM 4.3 - AUT0!!ATIC ACTUATIO!I 0F S11UllT TRIP ATTAC 06/01/84C 10/85 (Complete) fl53623 B-85 SALEtt ATilS l.2 DATA CAPABILITY 12/31/85 ?"^" A.fl59 Pr*1ffNE 06/01/84C Note 13 1153706 B-86 SALEM Aills 2.2 5-R C0!!PollEllTS H53789 B-87 SALEH ATIIS 3.2.1 1 3.2.2 5-R COMPOIIEllTS 05/13/85C 5/85 (Complete) !!53872 B-88 SALEM ATils 3.2.3 T.S. 5-R Col!ParlEllTS 06/Ol/84C 10/85 (Complete)

  1. 153930 B-89 SAL Ett AllIS 4.2.3 & 4.2.4 LIFE COMPo!!EllTS 10/31/86 Note 14 06/26/85C t

6/85 (Complete) 1155371 B-90 SALEH ATIIS 4.3 II AtID B8ll T.S. 5/85 (Complete) 1154099 B-92 SALEM ATIIS 4.5.1 DIVERSE TRIP FEATURES 05/13/85C 1154016 5-93 SALEll Afils 4.5.2 3 4.5.3 TEST ALTERilATIVES 06/01/84C tiote 14 ggg ?

/C;

' c _,-_ ' -_ a !!03733 C-03 Pl!R SEC0!!DARY llATER CilEHISTRY H0!!!TORIllG REQUIREME I1/13/81C s 09/15/8tC Note 15 t108749 C-06 PUttP SUPPORT-LAf1ELLAR TEARIt!6 l108751 C-07 FUEI IIAllDLIIIG ACCIDEtIT IIISIDE C0tl TAIT!!!EllT 02/02/82C 2/82 (Complete) M app \\ltah 03/05/81C 1108747 C-09 Pl!R AUX Fil PU!!PS t108076 C-10 CarlIROL OF llEAVY LDADS OVER SPElli FUEL POOL (PilASE 06/16/83C !!ote 17 6/83 (Complete) 06/16/83C 12/84 (Complete) 1143658 C-14 AUXILI ARY FEECllATER SEISillC QUALIFICATI0tl !!SP PACE 11 OF 14

) R-1208738-003 REOULAT0RY I II F 0 R H A T I O Il TRACKIIIO 5YSTEH PAGE Ilo.:.333 03/31/86 FACILITY I H P L E H E il T A T I O II P:AIRIE ISL AllD 2 (CollTIllUATIOrl) LIC ACT LICEllSEE IAC 1!L !!EA_1 TIILE [1}1101LIg XIA11L$ I!Alf H52261 C-15 CutlTROL OF llEAVY LDADS - PalASE II (FDLLDIlUP OF HPA 06/28/85C Note 18 6/85 (complete) j[$ Cdl bans pItk "_n!_ H58081 C-16 UTILITY RESPo!!SES TO STAFF REC 0!!MEllDATIO!45 C0!ICERil tt07873 D-02 ECCS ZIRC CL AD HDDEL ERROR-C0!!PLI A!!CE IIITil t o CFR-04/20/79C Note 2 - 4/7% h o gIJ ft/01/78C Note 1 11/78 (Complete) tt07855 D-03 PRESSURIZER llEATUP RATE ERROR 110847I D-05 PLAtIT UPI I!ODEL PROBLEM f2/,J//f' 09/15/86 gu - e p(6 H08732 D-10 ASYttMETRIC LOCA LDADS g jf/gg -42*2573F y;_ g/g prept 02/22/80C um

  • 4 /80 80*4fb H08996 D-11 FISSIO!! GAS RELEASE Ask" 4 f 84" il Hl2274 D-15 llIGli EIIERGY LIllE BREAK 8 C0!!SEQUEllTI AL SYSTEM FAIL 12/Ol/80C u..-

"^ 9 --- T /Df hoef 4bi cNWY \\ 09/06/85C t155893 D-19 DIESEL GEllERATOR RELIA 81LITY TECll SPECS (GL 84-15) 04/20/79C " _c : 2 1110904 E-03 CORE RELOADS REQUIRIllG PRIOR llRC APPROVAL 07/06/82C 1/80 (Complete) 1144051 F-01 1.A.1.1 SilIFT TECil!!! CAL ADVISOR 04/06/83C 4/83 (Complete) H44120 F-02 I.A.1.3 SilIFT HAtitlIllG H44191 F-03 I.A.2.1 UPGRADIllG OF RO AllD SRO TRAltlIllG 12/14/82C 12/82 (Complete) H44262 F-04 I.C.1.2/3. A EllERGEllCY OPERATIllG PROCEDURES GEllERIC 06/07/84C 6/84 (Complete) tiote 19 tt44132 F-05 I.C.1.2/3.8 PROCEDURES GEtIERATIO!! PACKAGES (IIUREG ~ 7147245 F-06 I.C.5 FEEDBACK OF OPERATIt!G EXPERIEllCE 01/04/82C 1/82 (Complete) t147317 F-07 I.C.6 CORRECT PERFORilAllCE OF OPERATIllG ACTINITI 01/G4/82C 1/82 (Complete) u -- on - 10/5 A-[fo" f f h I H51193 F-08 I.D.1.1 DETAILED COIITROL RODN DESIGli REVIEll PROGRA 10/10/84C 115:273 F-09 I.D 2 SAFEIY PARAMETER DISPLAY SYSTEN 07/15/85C !!ote 21 12/86 '(ProjectM) 09/19/83C 9/83 (Complete)

  • 44399 F-10 II.B t RCS IIIGli POIllT VEllTS tI 10/12/83C 10/83 (Complete) 1147968 F-11 II.B.2 PL AllT SilIELDIllG 11/23/83C Note 22 11/83 (Complete)

!!44470 F-12 11.8.3 POST ACCIDEtIT SAtlPLIrlG 1144541 F-13 II.B.4 TRAltlIIIG FOR llITIGATIIIG CORE DAMAGE 12/14/82C 12/82 (Complete) NSP PACE 12 OF'14 e e

) R-1208731-Ost REGuLAT0RY I II F 0 R H A T I O O TRACKIOO $YSTEH PAGE NO.s.394 83/31/86 FACILITY I 11 P L E H E N T A T I O N PRAIRIE ISLAllD 2 (COIITIt!UATI0ll) LIC ACT LICENSEE f_0t!Elglg }MI,U!)

MIf, 0

T AC liff. ftP A 6 TTTLE S.L4&8.ae6+glyfg"y Hote 23 H44611 F-14 II.D.1 RV AllD SV TRAllIIIIG H4'648 F-15 II.E.1.1 AFII SYSTEll EVALUATION 03/22/82C llote 24 3/82 (Complete) I!44688 F-16 II.E.1.2.1 Afil SYSTEM IllITI ATIDit 03/22/82C 3/82 (Complete) t!44727 F-17 II.E.1.2.2 Afil SYSTEll FLD!l IIIDICATIO!I 03/22/82C 3/82 (Complete) 7144809 F-18 II.E.4.1 DEDICATED liYDROGE!! PEllETRATIDH 86/01/82C 6/82 (Complete) H44880 F-19 II.E.4.2 CollTA!!INEllT ISOL ATION DEPEllD481LITY '09/09/82C 9/82 (Complete) H44951 F-20 II.F.1.1 Il08LE GAS HollITOR 11/89/81C 4/82 (Complete) !!45022 F-21 II.F.1.2 10DIllE/PARTICUL ATE SAMPLING 11/89/8tC 9/82 (Complete) H45093 F-22 II.F.1.3 CDitT AlllHElli ilIGli RAllGE HCli1 TOR 81/28/82C 2/82 (Complete) 1147629 F-23 II.F.1.4 CollTAllll1ENT PRESSURE IllSTRUMEllT 84/18/83C-1/82 (Complete) H47700 F-24 II.F.1.5 CollTAllillEllT llATER LEVEL IllSTRUME!IT C4/18/83C 12/81 (Complete) H47771 F-25 II.F.1.6 CollTAlllHEllT IIYDROGEN HONITOR 94/18/83C 12/81 (Complete) H45163 F-26 II.F.2 IllSTRUMElliS FOR DETECTIoll O!! INADEQUATE 87[/I[fl ghggo,,g,Ms) u. t145900 F-38 II.K.2.13 THERHAL-HECllAll! CAL REPORT 06/06/84C 6/84 (Complete) 1147814 F-33 II.K.2.17 PoiEllTIAL FOR VOIDING Ill RCS 12/30/83C 12/82 (Complete) H45245 F-36 II.K.3.1 AUTO PORV ISOLATI0ll 09/16/83C 9/83 (Complete) H45291 F-37 II.K.3.2 REPORT Dil PORV FAILURES 89/16/83C 9/83 (Complete) H45373 F-38 II.K.3.5 REPORTIllG SV AllD RV FAILURES A!ID CIIALLE 03/02/82C 3/82 (Complete)! __ q)g'& hoawf aN H45408 F-39 II.K.3.5 AUTO TRIP OF RCPS 02/08/83C y

  • 45457 F-40 II.K.3.9 FID CollTROLLER 11/30/8tC 11/81 (Complete) t1 1145487 F-41 II.K.3.10 AllTICIPATORY TRIP H0DIFICATIO!!S 11/30/81C 11/81 (Complete)

!!45517 F-42 II.K.3.12 All'TICIPATORY TRIP O!! TURBINE TRIP ll/30/8tC 11/81 (Complete) H45559 F-47 II.K.3.17 ECCS DUTAGES 08/11/83C 8/83 (Cccplete) !!sP PACE 13 OF 14 9

R-1208731-001 RECOLATCRY INF0RHATIOG TRACKICC 5Y5TEH PAGE No.:.39! FACILITY IilPLEHENTATION 83/31/8f PRAIRIE ISL AllD 2 (C0!aIIIIUAT Inll) LIC ACT LICENSEE IAC n'. ItPA e TLIlE QOllElflg 11AllL1 Mlf H48429 F-53 II.K.3.25 PctlER O!! PullP SEALS 06/17/82C 6/82 (Complete) M45856 F-57 II.K.3.30 53 LOCA ItEill0Ds 06/DC/85C 6/85 (Complete) H48195 F-58 II.K.3.31 C0!!PLI AllCE IIIlli IS CFR 50.46 01/15/87 Note 27 4/86 (Complete)

  • 4 for /Y66 -

toMired Note 28 12/83 (Complete) H45975 F-63 III.A.t.2 TECit!!! CAL SUPPORT CENTER asyf 9 / yg C s e 12/83 (Complete) H46046 F-64 III.A.1.2 OPERATI0llAL SUPPORT CENTER gg (, H46fts F-65 III.A.I.2 EHLRGE!!CY OPERATIONS FACILITY ea 44.*a6 12/83 (Complete).h // 5 1 (( W *I b H46190 F-66 III.A.I.2 NUCLEAR DATA LIllK 07/38/82C - 7 M46262 F-67 III.A.2.1 ENERGEllCY PL All UPGRADE TO MEET RULE 05/l [ f (, 5/83 (Complete) H46334 F-68 III.A.2.2 HETEOROLOGICAL DATA UPGRADE 4 im 12/83 (Complete) H46405 F-69 III.D.3.3 IMPLANT RADIATI0!l HONITORING 03/82/82C 3/82 (Complete) M46474 F-70 III.D.3.4 CollTROL ROOH llARITABILITY 84/09/82C 2/84 (Complete) H56155 F-71 I.D t.2 DETAILED COIITROL ROOH REVIEll (FDLlollUP To e6eser8 F 'te 29 o a //.r-/f's H49664 G-01 REACTOR C00LAlli PUHP TRIP (D660 - II.K.3.5)

  • SM4 tete
  • N t' l9

~ p(o/ t/ / f $ ..i \\ 1 9 NSP PACE 14 0F 14 J}}