ML20215L427

From kanterella
Jump to navigation Jump to search
Forwards Callaway Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Facility Alert & Notification Sys Meets Requirements of NUREG-0654/FEMA-REP-1,Rev 1.W/o Encl
ML20215L427
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/18/1987
From: Mcloughlin D
Federal Emergency Management Agency
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20215L402 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8706260046
Download: ML20215L427 (1)


Text

C': r I

)

Murley i

" ' letter only: Stello {

[ Federal Emergency Management Agency UN Washington, D.Ci 20472 ay t '

W I 8195T I q

f cler.1TY EUIIU'S Mr. Victor Stello,- Jr.

, IS L t.--%

Yf k

  1. j

" Executive Director for Operations- ' "H-

[p~m[,d i U.S. Nuclear Regulatory Commission #

t Washington, D.C. -20555 GT

' 09"~-

fIM., h2

Dear Mr.' Stello:

The Federal Emergency Management Agency (FEMA) has conpleted an analysis of the in Callaway County, Missouri.. puwt alert and notification system for the callaway Nuc 2is review has been conpleted pursuant to FEMA Rule 44 CFR 350; selected evaluative criteria and Appendix 3.in~ NUREG-0654/ FEMA - .

REP-1, Revision 1; and FEMA-43, 'the. " Standard Guide for the Evaluation of Alert

and Notification Systems for Nuclear Power Plants" (now published as FEMA-REP-10).

Se enclosed report which is entitled "Callaway Nuclear Power Plant Site-Specific -

'Offsite Radiological Emergency Preparedness Alert and Notification System Quality ' i Assurance. Verification" sumarizes the engineering design review; incorporates -  ;

the results of the telephone survey of the public conducted immediately following .I the activation of the alert and notification system on May 7,1985; and confirms

'the adequacy Revision 1,'andof the applicable evaluative criteria'from NUREG-0654/ FEMA-REP-1, FEMA-43..

Based on the engineering design' review and thG results of the telephone survey, FEMA has determined that the alert and notification system installed around the .

Revision 1,Nuclear Callaway PcWer Plant satisfies the requirements of NUREG-0654/ FEMA-REP-1, and FEMA-43. .

Therefore,-there is now reasonable assurance that the  !

system is adequate.to prt:mptly. alert and notify the public in the event of 'a' radiological emergency at the site.

Se caveat on the alert and notification

  • system contained

-is now removed. in the 44 CFR 350 approval for Missouri dated July 9, 1985,  !

Se Honorable John Ashcroft, Governor of Missouri, has been advised of this approval.

5 Sincerely,

{- Ii l

Dave McIoug lin 1 i

i Deputy Associate Director State and Iocal Programs and Support Enclosure <

I

(. 3/

%62%h F

hO MAY 2 81987