e ' .

E STxrn or NnW JEnsur DOARD OF PUBLic UTILITIES BARBARA A. CURRAN 8800 RAYMOND BLVD.

PRE SIDE N r NcwARK, N.J. o7:o2 201-648-2027 August 22, 1986 Lando W. Zech Jr., Chairman U.S. Nuclear Regulatory Commission 1717 H. Street Northwest Washington, D.C. 20555

Dear Chairman Zech:

The New Jersey Board of Public Utilities was notified of an unusal event that was declared at the Hope Creek facility on August 8, 1986, that resulted in a shutdown of the plant due to an error found in a safety pressure relief sensing system. It is our understanding that during preliminary tests, technicians discovered that pressue relief sensing lines, which are part of the plant's safety system designed to sense and release high pressure within the containment b:lilding, were installed incorrectly. Apparently, the lines were reversed in accordance with the original design print that a draftsman had incorrectly drawn and the error in the design print was not discovered until after the facility was constructed and power ascension tests initiated.

The New Jersey Board of Public Utilities is concerned that there may exist additional undiscovered problems similar to the above that involve other critical areas of the plant; and this Board is concerned that the discovery of similar conditions after the plant has been declared commercial and included in the utility's rate base may lead to extended outages where the plant cannot provide power.

We recognize that the responsibility for the proper construction of the plant so that it meets established safety standards lies with the NRC and in that regard, we would appreciate being advised of those actions being taken by the Nuclear Regulatory Commission to insure that other similar conditions do not exist.

/

S cerely you ,

r, r-Barbara A. Curran President BC/MV/vc/ electric 8610280314 861021 PDR ADOCK 050003S4 PDR S

r a b . *

  1. 'o UNITED STATES f F ,,g NUCLEAR REGULATORY COMMISSION g -t WASHINGTON, D. C. 20555

\...../

EDO PRINCIPAL CORRESPONDENCE CONTROL ,

FROM: DUE: ^^ ' ;~ < 60 EDO CONTROL: 002118 BARBARA A. CURRAN

/p-J- 7[ DOC DT: 08/22/86 FINAL REPLY:

BOARD OF PUBLIC UTILITIES STATE OF NEW JERSEY TO:

CHAIRMAN ZECH FOR SIGNATURE OF: ** GREEN ** SECY NO: 86-0977 EXECUTIVE DIRECTOR DESC: ROUTING:

SHUTDOWN OF HOPE CREEK FACILITY ON 8/8 DUE TO STELLO ERROR IN SAFETY PRESSURE RELIEF SENSING SYSTEM - ROE REQUEST BEING ADVISED OF ACTION BEING TAKEN BY NRC REHM TO INSURE SIMILAR CONDITIONS DO NOT EXIST SNIEZEK TAYLOR DATE: 09/12/86 GCUNNINGHAM ASSIGNED TO: M CONTACT: BENTett- KERR, SP

(( MURL.EY SPECIAL INSTRUCTIONS OR REMARKS:

Scotch' 7664 " Post 4t" Routing Request Pad ROUTING - REQUEST Please a ,.

f f A e READ To HANDLE APPROVE and FORWARD RETURN KEEP OR DISCARD REVIEW WITH ME Date From p -[

/ fi

l . > I **

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUHBER: CRC-86-0977 LOGGING DATE: Sep 12 86 ACTION OFFICE: EDO AUTHOR: B.A. Curran AFFILIATION: NJ (NEW JERSEY)

LETTER DATE: Aug 22 86 FILE CODE: ID&R-5 Hope Creek

SUBJECT:

Safety standards for the Hope Creek facility ACTION: Signature of EDO DISTRIBUTION: RF, Cmrs, OGC, SECY, OPA SPECIAL HANDLING: None NOTES:

DATE DUE: Sep 26 86 SIGNATURE: . DATE SIGNED:

AFFILIATION:

Rec'd Off. EDO Date 9/IT Tb Time 8]I_.