SgCa,rcghna Electric & Gas Company i
Den A.
f cougg29218 Nuctsar Operations SCE&G s ec-m May 5, 1987 Dr. J. Nelson Grace Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 87-004)
Dear Dr. Grace:
In support of the third refueling outage which began on March 6,
the following fire barriers were inoperable for greater than seven days.
1.
Fire Door CB-603 was opened on March 29, for
'B' Train testing.
On April 9, testing was completed and the door was closed.
2.
Several penetrations in service water pump house room 25-04 were opened on April 14, to allow Appendix 'R' modifications.
The modifications and the fire barrier repairs will be complete before start-up.
This Special Report is required by Technical Specifications Section 3.7.10
" Fire Rated Assemblies".
As directed in Action Statement (a) of Section 3.7.10, the following was performed.
1.
Testing of the fire detector operability.
2.
Fire watch patrols were established.
If you have any questions, please let us know.
ry trtly ygurs, I
a n
MGC/ DAN:bjh
/
c:
See Page 2 upwa =8gb s
v' Mr. J. Nelson Grace SPR 87-004 May 5, 1987 Page 2 c:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
E. C. Roberts J. G. Connelly, Jr.
W..A. Williams, Jr.
Group Managers
- 0. S. Bradham D. R. Moore W. R. Baehr W. T. Frady C. L. Ligon (NSRC)
R. M. Campbell K. E. Nodland R. A. Stough G. O. Percival R. L. Prevatte J. B. Knotts, Jr.
S. D. Hogge I&E Washington Document Management Branch INP0 Records Center ANI Library NPCF File
-