Forwards Exercise Rept,Lasalle Nuclear Power Station, Joint Exercise, Conducted on 860408.No Deficiencies Noted. Four Areas Requiring Corrective Actions Observed.State of Il Schedule for Corrective Actions Also Encl
ML20215K305
Person / Time
Site: LaSalle  
Issue date: 10/15/1986
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20215K307 List:
References
NUDOCS 8610280104
Download: ML20215K305 (6)


Text

.-

.o %

[

\\ Federal Emergency Management Agency Washington, D.C. 20472 e

o GCTI5 L MEMORANDUM FOR: Edward L. Jordan

Director, Division of Onergency Preparedness and Engineering Response Office of Inspection and Enforcenent U.S. Nuclear Regulatory Co:inission m N/[~,

FRCM:

ar 77. KrTmm Assistant Associate Director Office of Natural and Technological Hazards Prograns

SUBJECT:

Exercise Report of the April 8, 1986, Exercise of the Offsite Radiological Dnergency Preparedness Plans for the LaSalle NJclear Power Station.

Wis is to transmit a copy of the Exercise Report of the April 8,1986, joint exercise of the offsite radiological energency preparedness plans for the LaSalle Nuclear Power Station, near the Village of Seneca, in LaSalle County, Illinois. Wis was a joint exercise for the State of Illinois (full participation), LaSalle County (full), Grundy County (limited participation), Seneca (limited), Marseilles (limited), Grand Ridge (limited), Ranson (limited) and Coninonwealth Edison Company (full).

The 10-mile Dnergency Planning Zone (EPZ) primarily impacts LaSalle County and to a lesser extent, Grundy County. W e report, dated July 17, 1986, was prepared by the Federal Dnergency Manajenent Agency (FEMA) Region V.

In the April 8,1986, exercise there were no Daficiencies identified, but there were 4 areas observed requiring corrective actions. 'Ihe State of Illinois has received a copy of the exercise report and has responded to FEMA Region V with the attached schedule for corrective actions for the State of Illinois and LaSalle County. We proposed schedule of corrective actions, transmitted to this office by FEMA Region V on Septenber 29, 1986, is satisfactory to correct the weaknesses identified in the exercise.

If you have any questions, please contact Mr. Robert S. Wilkerson, mief, Technological Hazards Division, at 646-28 61.

Atta:hnents As Stated 0280104 061015 F

ADOCK 05000373 f

PDR

4 Federal Emergency Management Agency l

( Region V 300 South Wacker. 24th Floor. Chicago, IL 60606 (312) 353-1500 0

0 September 29, 1986 MEMORANDUM FOR:

Assistanct Associate Director Office of Natural and Technological Hazards ATTENTION:

Ken Green, SL-NT-TH FROM:

Wallace J. Weaver, Chief tv Technological Hazards Branch

SUBJECT:

LaSalle Nuclear Power Station REP Joint Exercise - Schedule of Corrective Actions A copy of the State of Illinois schedule of corrective actions for the weak-nesses identified during the April 8, 1986 LaSalle Nuclear Power Station REP joint exercise is enclosed. We have reviewed the proposed actions and find them acceptable to correct the exercise weaknesses identified. A copy.of our letter to the State of Illinois is included.

To date no comments have been received which have resulted in any changes to the draft exercise report previously provided to you. Therefore we recommend that you attach the schedule of corrective actions to the draft report, remove the draft designation from the exercise report cover and transmit the document to the NRC as the final exercise report.

As noted in our letter to the State of Illinois, we will notify the State of your action with respect to the 44 CFR 350 approval, the final exercise report and the schedule of corrective actions.

Enclosures

HR Federal Emergency Management Agency

?

Region V 300 South Wacker,24th Floor, Chicago,IL 60606 (312) 353-1500 o

September 29, 1986 Mr. Charles D. Jones Director, Illinois Emergency Services and Disaster Agency 110 East Adams Street Springfield, Illinois 62706

Dear Mr. Jones:

We have reviewed the schedule of corrective actions for the weaknesses identified during the April 8,1986 LaSalle Nuclear Power Station REP joint exercise. The proposed corrective actions are satisfactory.to correct the weaknesses identified for both the State of Illinois and LaSalle County during the exercise.

A copy of your schedule of corrective actions is being sent to FEMA HQ for trans-mittal to the NRC along with the final exercise report. To date no changes have been made to the draft exercise report which was previously provided to you.

We will inform you of the action FEMA HQ takes with respect to the LaSalle 350 approval, the final exercise report and the schedule of corrective actions at such time as it becomes available to us.

Sincerely n,

' $/ hic O MU

\\

Wallace J. Weaver, Chief Technologic'al Hazards Branch cc: 1DNS Mazon

c sa v

Illinois Emergency Services and Disaster Agency 110 East Adams Street, Springfield, Illinois 62706 August 14, 1986 Mr. Wallace Weaver Chief, Technological Hazards Branch Region V, Federal Emergency Management Agency 300 S. Wacker Drive Chicago, IL 60606

Dear Mr. Weaver:

This letter is in response to your letter of July 18, 1986 and the accompanying Report of the LaSalle County Nuclear Power Station exercise conducted April 8, 1986.

Attached is our Proposed Corrective Action Response which indicates the schedule for correcting the areas requiring corrective action, as you requested in your letter.

Sincerely, Jana S. Fairow Radiological Emergency Preparedness Supervisor JSF/jk cc:

Steve Dunas i

.l

_. -. =___-

i LASALLE NUCLEAR POWER STATION Summary Listing of Exercise Findings

2. Areas Requiring Corrective Action April 8, 1986 Illinois State Corrective Action Scheduled Actual NUREG Narrative Statement Date Date Proposed Item of Weakness f

ma e 1

e9 an the ca es de ned ei on.

Po ems th t i

be addressed during the revision during previous exercises, process.

J.11 Field smaple results were of levels that Future scenarios will use a source Future term sufficient to allow demonstra-exercises l

did not require the implementation of tion of ingestion pathway protective ingestion pathway protective actions.

actions.

b 9

e

---.r--

w

=--e

LASALLE NUCLEAR POWER STATION Summary Listing of Exercise Findings i

2. Areas Requiring Corrective Action April 8, 1986 Illinois LaSnlle County Corrective Action Scheduled Actual NUREG Narrative Statement Date Date Item of Weakness Proposed H.4 The prepositioning of equipment in the EOC Because EOC equipment is stored in the 01/01/87 in anticipation of the exercise precluded LaSalle County ESDA office, which is the demonstration of EOC activation.

some distance away from th E0C, the LaSalle County ESDA Coordinator found l

it necessary to transfer the equipment l

to the E0C prior to the start of the exercise. To correct this problem, LaSalle County ESDA plans to purchase storage cabinets in which to store EOC l

equipment. These cabinets will be located in the E0C area.

i G.4.b EBS messages should be supplied to the During the next training sessions for During the JPIC so they can be incorporated into LaSalle County, the need to supply next LaSalle the new releases.

EBS messages to the JPIC will be County training I

emphasized. During the next offsite sessions and exercise at LaSalle Station, LaSalle during the County will supply EBS messages to next offsite the JPIC.

exercise at l

LaSalle Station l

l l

.