se O Public Service ~
- ==
P.o. Box 840 Denver, Co 80201-0840 RQ MMS JR April 29' 1987 Fort St Vrain EU5LER $EEdATIONS Unit No. 1 P-87160 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Attention: Mr. Jose A. Calvo Director, Project Directorate IV Docket No. 50-267
SUBJECT:
Submittal of Current Construction Status for Appendix R Modifications
REFERENCES:
- 1) PSC letter, Williams to Berkow, dated November 20, 1986 (P-86597)
- 2) NRC letter, Heitner to Williams, dated January 23, 1987 (G-87025)
- 3) PSC letter, Williams to Berkow, dated February 27, 1987 (P-87076)
- 4) NRC letter, Heitner to Williams, dated April 2, 1987 (G-87122)
- 5) NRC Letter, Miraglia to Williams, c!ated April 6. 1987 (G-87118)
Dear Mr. Calvo:
As we indicated in Reference 1, we would be updating you periodically as to the construction status of our Appendix R modifications.
The attached condensed " Schedule of Proposed Modifications" indicate the status of these modifications. As you had expressed some concern for certain construction items in Reference 2 (items 4.6, 4.9, and 4.11(a)), we would like to point out all construction is complete for Item 4.11(a) and that this correspondence is to inform you of the 8705080278 870429 I
k PDR ADOCK 05000267 F
P-87160 April 29,1987 1
commitment schedule change as requested in Reference 5.
The attached schedule also reflects the status of the modifications which were scheduled for completion prior to the EQ start-up.
We wish to point out that Item 4.5 on the attached table indicates that all construction is complete and that training on the detection system will be completed by May 15, 1987. PSC has not reduced its fire watch, which was identified as a compensatory measure, in Reference 3 and approved in Reference 4.
We want to assure the Staff that the health and safety of the public will not diminish, and that the fire watch will not be decreased until this training has been completed.
It should be noted that Public Service Company of Colorado has aggressively proceeded with the modifications and on a regular basis, informed the staff of their construction status.
In addition, in certain instances, we have completed our modifications significantly prior to our commitment date. We will continue this level of effort until our remaining Appendix R modifications are completed.
If ou have any questions, please contact Mr.
M. H. Holmes at (303 480-6960.
Very truly yours, R. O. Williams, Jr.
R0W/FT:pa Attachment r
F
Attachment to P-87160 SCHEDULE FOR PROPOSED MODIFICATIONS c
Jtem Description Status l
z' 4.1 Fire Doors Modification Complete-4.2 Penetration Seals
. [
Podification Complete s
.4.3 Fire Damper-Modification Complete 4.4 Emergency Lighting To be completed by 08/26/87 i
4.5 Fire Detection Mo'dification Complete.
j Trai.ning to be completed by 05/15/87 4.6 ACM Backfe$d i
Install by startup e..
7
?
following 4th refueli.ng
),
r 4.7 Ventilation Damper Back-up<
Modification Complete Bottle
]
i.
s 4.8 Portable Ventilation Fans Modification Complete r ',,
s i
3 4.9 Turbine Water Removal Pump Install by startup
)
following 4th refueling s,[-
t
,t 4.10 Cable Re-Routes (a)
Reactor Plant Exhaust Fan '. '
Modification Completed
/
03/06/87
[
h (b) '
BearingWaterMakeuh Modification Completed 01/30/87 (c)' ; Surge Tank Level Instrumentation Modification Completed i
1 12/22/86 f
t j
',j I
1 t
l 1
v
('
'i I
4
~
,y t
f 1
1
, l**
l.'
'?
g 3
-U--
a i
' Attachment to P-87160 o
Item Description Status 4.10(d)
Feedwater Flow Monitoring Modification Completed 01/07/87 (e)
Feedwater Flow Associated Cables Modification Completed 12/26/86 (f)
ACM Fuel Oil Transfer Pump Modification Completed 02/24/87 (g)
Helium Flow Instrument Cables Modification Complete (g.1) Helium Flow Instrument Fuses Modification Complete (h)
Main Steam Temperature Indication Modification' Completed 08/12/86 U)
Bearing Water Pumps Modification Completed 03/06/87 (j)
Emergency Water Booster Pumps Modification Completed 11/09/86 4.11 Valve Operability (a)
Accumulator / Actuator Modification Modification Completed 03/07/87 (b)
Valve Operator Back-up Bottles Modification Complete (c)
Local Control Valve Modification Complete (d)
Manual Bypass Modification Complete (e)
Access Ladders Modification Complete (f)
Valve Tagging Modification Complete 4.12 Service Water Return Pump Modification Complete