ML20215J050

From kanterella
Jump to navigation Jump to search
Forwards Review of Dynamic Qualification of safety-related Electrical & Mechanical Equipment, Beaver Valley Unit 2 Sqrt Rept
ML20215J050
Person / Time
Site: Beaver Valley
Issue date: 02/04/1987
From: Obenchain C
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML20215J054 List:
References
CON-FIN-A-6415 OBEN-13-87, NUDOCS 8705070201
Download: ML20215J050 (2)


Text

_ _ _ _ _ _ _ _ - ._ - _ _ - _ _ _ .

.a h *

  • f0A.

/NEA idaho National Engineering Laboratory February 4, 1987 Mr. Mayo Carrington, Project Manager Technical Assistance Management Branch Planning & Program Analysis Staff Office of Nuclear Reactor Regulation Bethesda, MD 20814 REVIEW 0F DYNAMIC QUALIFICATION OF SAFETY RELATED ELECTRICAL AND MECHANICAL EQUIPMENT FOR BEAVER VALLEY ELECTRIC GENERATING PLANT, UNIT 2--SQRT REPORT (A6415) - Oben-13-87

Reference:

G. E. Marx ltr to S. B. Milam, Marx-56-84, Transmittal of NRC Form 189 for Equipment Qualification Case Reviews (A6415),

-}

February 10, 1984

Dear Mr. Carrington:

EG&G Idaho personnel assist the Engineering Brancn (EB) of the NRC in the review of applicants' programs for qualification of safety related electrical and mechanical equipment for seismic and dynamic loads. The review consists of: (1) a determination of the acceptability of the procedures used, standard followed, and completeness of the program in general, and (2) an audit of selected equipment items to develop the basis for the staff judgment on the completeness and adequacy of the implementation of the entire seismic and dynamic qualification program.

This is done by a seismic qualification review team (SQRT). The SQRT consists of engineers from EB and the Idaho National Engineering Laboratory (INEL).

During the week of September 30 through October 3, 1986, EG&G Idaho per-sonnel (J. N. Singh, G. L. Thinnes and B. L. Harris) assisted the NRC in the SQRT audit of a sample of selected equipment for the Beaver Valley Electric Generating Plant, Unit 2. The audit, which was performed at the plant site, consisted of field inspection of equipment, review of the qualification reports, resolution of issues, and identification of action items encountered during the review.

h EGnG,u . .... p.o. Box 162S Idaho Falls, ID 83415 8705070201 870204 PDR ADOCK 05000412 A PDR

. l' .

M. Carrington February 4, 1987 Oben-13-87 Page 2

] The enclosed report contains results of the SQRT review. This report is completed as a part of Subtask d, Project 1 of FIN No. A6415.

Very truly yours, N

C. F. Obenchain, Manager NRR and I&E Support jr

Enclosure:

As Stated

) cc: G. Bagchi, NRC/EB S. Hou, NRC/EB G. L. Jones, DOE-ID J. O. Zane, EG&G Idaho (w/o Enclosure) l

_ . - - - _ _ _ ---]