ML20215H792
| ML20215H792 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/09/1986 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-1106, NUDOCS 8610240151 | |
| Download: ML20215H792 (1) | |
Text
Georgia Fbwer Company Fost Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554 9961, Ext. 3360 404 724-8114. Ext. 3360 k
L UG0CI14 Pll23 Georgia Power
- o. o. ro.i.,
Q';;,';'c",'
me sourtm eiecinc system October 9,1986 United States Nuclear Regulatory Commission Region II File: X78G03-M128 Suite.2900 Log:
GN-1106 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
Vogtle Electric Generating Plant-Units 1 and 2; 50-424, 50-425; Emergency Diesel Building Ventilation System Attention:
Mr. J. Nelson Grace On September 12, 1986, Mr.
R.
E.
Folker, Vogtle Project Quality Assurance Engineer, informed Mr.
E.
F.
Christnot of the USNRC Region II of a potentially reportable condition concerning -the ' emergency diesel building ventilation system.
Operational Deficiency Report (0DR)
T-1-86-1037 identified that the system was_ not delivering the design air flow.
Georgia Power Company is currently evaluating this condition and expects to inform the NRC of the evaluation results by October 31, 1986.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Yours truly, O
i D. O. Foster REF/DOF/tdm xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 H. G. Baker R. A. Thomas L. T. Gucwa J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head P. R. Bemis G. A. McCarley
.R. E. Conway J. A. Bailey R. W. McManus J. T. Beckham
- 0. Batum D. S. Read R. H. Pinson G. Bockhold Sr. Resident (NRC)
P. D. Rice C. E. Belflower C. C. Garrett (0PC)
B. M. Guthrie J. F. D'Amico J. E. Joiner (TSLA)
D. E. Dutton E. D. Groover D. Feig (GANE) 8610240151 861009 PDR ADOCK 05000424 S
PDR iO 2 e< A i o