ML20215H631
| ML20215H631 | |
| Person / Time | |
|---|---|
| Site: | 07000754 |
| Issue date: | 06/12/1987 |
| From: | Nelson G, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19292H434 | List: |
| References | |
| 70-0754-87-02, 70-754-87-2, NUDOCS 8706240165 | |
| Download: ML20215H631 (1) | |
Text
]
h 1
~^
- IATETdAt TRUt$MITTED HErrwml CETAE 2.190 IHf 0!! MAIL 0g The information on this page is considered to be appropriate for public disclosure pursuant-to 10 CFR 2.790 U. S. NUCLEAR REGULATORY COMMISSION REGION V 0
Report No.. 70-754/87-02 (IE-V-804)
Docket'No.'70-754' License No. SNM-960
[
Safeguards Group:
V-Licensee:-General Electric Company P. 0. Box 460 Pleasanton, California 94556 Facility Name:.Vallecitos Nuclear Center Inspection at:
Pleasanton, California Inspection Conducted:
June 2-4, 1987
'D' ate of Last Material Control and Accounting Inspection:
January 12-13, 1984 Type of Inspection:
Routine Unannounced Material Control and Accounting Inspector:
d~ /I"8 7 '
4
'G B. Nelson, Chemist Date Signed
' Approved by: f)h O b de f 6,!/2h?
M. D. Schuster, Chief Date S'igned Safeguards Section
' Summary:
Inspection on June 2 through 4, 1987 (70-754/87-02)
Areas Inspected:
MC&A for licensees possessing less than or equal to one effective kilogram of SNM and Management meetings - entrance and exit interviews.
During the inspection, Inspection procedures 85200 and 30703 were used.
Results: Within the areas examined during this inspection, no violations or deviations were identified.
3AttRlR TResMSED EM NO 2J30 INFORMATIOR 8706240165 e70616 ADOCK 0700 4
{DR a