ML20215G918

From kanterella
Jump to navigation Jump to search
Lists Addl Info Required to Complete Review of 851223 Application for License Authorizing Use of Texas Nuclear Gauges,Including Sketch of Where Gauge to Be Mounted.Info Requested within 30 Days
ML20215G918
Person / Time
Issue date: 03/07/1986
From: Vacherlon P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bierle A
KERLEY INDUSTRIES, INC.
Shared Package
ML20215G863 List:
References
80409, NUDOCS 8704170327
Download: ML20215G918 (2)


Text

r MAR 0 71986 Kerley Industries, Inc.

ATTN:

A. D. Bierle Manager of Engineering P.O. Box 221 Otter Lake, MI 48464 Gentlemen:

We have reviewed your application dated December 23, 1985, requesting a new license authorizing the use of Texas Nuclear Gauges. We find that we will need additional information as follows:

1.

Please submit a description of how you will be using the gauges.

2.

Submit a simple sketch of where the gauge is to be mounted.

Please include a notation of where the operator will be located when the shutter is open and the gauge is operating.

3.

Please expand your emergency procedures to include your method for isolating the gauge to prevent persons from becoming exposed in the event the shutter mechanism is damaged and the source is exposed.

4.

Submit a description of the duties and responsibilities of your Radiation Protection Officer. The typical duties of a Radiation Protection Officer would be:

a.

To ensure that the use of radioactive material is by or under the direct supervision of individuals specifically listed on your license.

b.

To ensure that all users (where appropriate) wear personnel monitoring equipment when using radioactive materials.

c.

To ensure that radioactive materials are properly secured against unauthorized removal at all times when not in use.

d.

To perform routine inspections of all laboratories using or storing l

radioactive materials.

e.

To ensure that the terms and conditions of your license are met, and that all required records are maintained.

l f.

To immediately halt any activity judged to be a threat to health, safety, the environment or a violation of the conditions of your license or the regulations.

i i

l l

8704170327 w Sf,/001 REG 3 LIC30 PDR

-)

f e.

Kerley Industries, Inc.

2 We will continue our review of your application upon receipt of this information.

Please reply in duplicate, within 30 days, and refer to Control Number 80409.

Sincerely, Original Signed By Patricia M. Vacherlon Materials Licensing Section i

k i

l I

RIII Vacherlon/cm 3/ /86 J