ML20215G271

From kanterella
Jump to navigation Jump to search
Forwards Listings of Nonroutine Correspondence Between Util & NRC-NRR for Which Written Responses Required
ML20215G271
Person / Time
Site: Vogtle  
Issue date: 06/17/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.01, TASK-3.D.1.1, TASK-TM GL-83-28, IEB-80-06, IEB-80-6, SL-2684, NUDOCS 8706230190
Download: ML20215G271 (6)


Text

1.:

Georgia Pbwer Company

' 333 Piedmont Avenue

- Atlanta, Georgia 30308 To'ephone 404 526f2526 -

Malling Address:-

~

Post Office Box 4545 Atlanta, Georgia 30302 h-Georgia Power L T. Gucwe the southem ektlic system Manager Nuclear Safety 3

' and Licensing.

I SL-2684' 0239m X7GJ17-V200 June 17, 1987 i

U. S. Nuclear Regulatory Commission i

ATTN: Do l

Hashingto,cument Control Desk n, D.C.

20555

' PLANT V0GTLE - UNITS 1, 2 NRC.00CKETS.50-424, 50-425 OPERATING LICENSE NPF-68,. CONSTRUCTION PERMIT CPPR-109 OUTSTANDING SUBMITTALS LIST

. Gentl emen.:

Enclosed for your ir. formation and use are listings of non-routine correspondence between Georgia Power Company (GPC) and NRC-NRR for which written responses are required. lists those items awaiting GPC response while Enclosure-2 lists items awaiting NRC. response.

Please contact this office if you have any questions.

Sincerely, cW &-

L. T. Gucwa JH/1m Enclosures 1.

Correspondence Awaiting GPC Response 2.

Correspondence Awaiting NRC Response c:

(see next page) 8706230190Bh424 PDR ADOCK O PDR P

N> \\lyt

i 4

i Georgia Penver sr.g j

1 U. S. Nuclear Regulatory Commission l

June 17, 1987 l

Page Two l

l c(w): Georaia Power Comoany Mr. R. E. Conway Mr. J. P. O'Reilly j

Mr. G. Bockhold, Jr.

Mr. J. F. D'Amico l

Mr. C. H. Hayes

'l GO-NORMS Southern Company Services l

Mr. R. A. Thomas

~

Mr. J. A. Bailey Shaw. Pittman. PottL.& Trowbridge Mr. B. H. Churchill, Attorney-at-Law Troutman. Sanders, Lockerman & Athmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle Egargians Against Nuclear Enerav Mr. D. Feig Ms. C. Stangler 0239m unns

Georgia Power d ENCLOSURE 1 PLANT V0GTLE - UNITS 1, 2-NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AHAITING GPC RESPONSE IJfB SUBJECT UNIT (S)

REFERENCE

,1 NUREG-0737 Item III.D.1.1, 2

.SSER 3, Page 11-2 Report of. leakage outside containment 2

- Loose Parts Monitoring 1,2 SSER'6, Page 4-1; SSER 5,

. System baseline. report Page 4-1; SER, Page 4-32 3-Verification of test-2

' SSER 5, Confirmatory results~of electrical Item 30, Page 8-3 distribution system

'4 Main control board 2

SSER-4, Page 9-12 separation 5

Implementation of Unit 2 2

SSER 4, Confirmatory seismic separation program Item 54, Page 3-6 6

Incorporation of generic and 2

SSER 5, Confirmatory plant-specific recommendations Item 36 Page 9 for TDI diesel generators 7

Inorganic zinc coating of 1,2 License Condition (8);

diesel fuel oil tanks SSER 4, Page 9-22 8

Alternate Radwaste Facility 1

License Condition (9);

SSER 3, Open Item 20, Page 11-1; SSER 4, Page 11-1 9

Generic Letter 83-28:

Salem 1,2 SSER 4, Open Item 5, Page ATHS Items 2.2.1, 2.2.2, 4.2.3, 15-3; SSER 5, Page 15-1 4.2.4, 4.5.3 10 IE Bulletin 80-06 2

SSER 5, Confirmatory Item 25, Page 7-1 0239m-El-1 06/17/87 SL-2684 700775

k Georgia Power n ENCLOSURE 1 (Continued)

CORRESPONDENCE AHAITING GPC RESPONSE ITEM SUBJECT UNIT (S)

REFERENCE 1

11 Battery room spray protection 2

SSER 5, Page 8-2 12 Spent fuel pool configuration 2

SSER 4, Page 9-1 13 Control Room Design Review 1,2 License Condition (7)c; (CRDR) additional surveys and SSER 5, Page 18-4 and evaluations Appendix T 14 Steam Generator Tube Rupture 1,2 License Condition (5);

SSER 3, Confirmatory Items 48 and 49, Page 15-11 15 NUREG-0737 Item II.F.2, 2

License Condition (7)a; Reactor Vessel Level Indication SSER 4, Page 4-2 System (RVLIS) report 16 Groundwater reports-per 1,2 SSER 2, Confirmatory program Item 5, Page 2-3 17 Settlement reports-per 1,2 SSER 4, Confirmatory program Item 7, Page 2-3 18 FSAR revisions 1,2 GN-1228 (12/10/86);

GN-1257 (12/22/86);

GN-1254 (12/22/86);

GN-1336 (1/15/87);

SL-2183 (3/23/87)

SL-2155 (4/2/87)

SL-2444 (5/21/87)

SL-2581 (6/5/87) 19 ATHS Mitigating Systems 1,2 10 CFR 50.62(c)(6)

Actuation Circuitry (AMSAC)

Plant-Specific Report 20 Bypass and Inoperable 2

SSER 5, Confirmatory Status Panel Item 27, Page 7-3; SSER 4, Page 7-2; SER, Page 7-33 0239m El-2 06/17/87 SL-2684 700775

y

Georgia Power A h

ENCLOSURE I (Continued)

' CORRESPONDENCE' AWAITING GPC RESPONSE-IIEB

. SUBJECT UNIT (S)

REFERENCE 21 Test of Engineered.

2-SSER 4 Confirmatory Safeguards P-4 Interlock Item 24, Page 7-1 22 Override of Isolation 2'

SSER 4, Confirmatory Signals Item 26, Page 7-1 23 NUREG-0737 Item II.K.3.1, 2

SSER 5, Confirmatory.

PORV Isolation Item 28,'Page 7-3 24 Intraplant Communication

'1,2 SSER 3, Page.9-3 System Test 25 SPDS Supplemental Report' 1,2 License Condition (7)b; SSER 6, Page 18-3 and Appendix V-26 Seismic Equipment Qualification 2

SSER 4, Open Item 1 and' Confirmatory Item 52, Page 3-10 27 Environmental Equipment 2

SSER 5, Open Item 1 Qualification Page 3-12 28 Pre-Service Inspection Program 2

SSER 4, Open Item 2, Pages 5-1, 6-4

.29.

Pump and Valve In-Service Test 2

SSER 6, Confirmatory Program Item 13, Page 3-1 SSER 4, Page 5-1, 6-4 31 Off-Site Medical Services 2

NRC Letter to GPC Dated June 4, 1987 0239m El-3 06/17/87 SL-2684 1

l 700776

~

Georgia Power b ENCLOSURE 2 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AWAITING NRC RESPONSE llEM SUBJECT UNIT (S)

REFERENCE 1

Generic Letter 83-28:

Salem 1,2 GN-1329 (1/15/87)

ATHS Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.5.1 2

Proposed Tech Spec Change -

1 SL-2136 (3/30/87)

Shutdown Margin 3

Electrical Penetration Filter 2

GN-1374 (6/1/87) and Exhaust System 4

Pipe Break Criteria For 2

GN-1375 (6/1/87)

Flooding Analysis 0239m E2-1 06/17/87 SL-2684 700775