ML20215G259

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation & SALP Input Re Util 870119 & 27 Requests for Tech Spec Revs Concerning Control Room High Efficiency Air Filter Sys.Requests Acceptable
ML20215G259
Person / Time
Site: Pilgrim
Issue date: 03/17/1987
From: Hulman L
Office of Nuclear Reactor Regulation
To: Donohew J
Office of Nuclear Reactor Regulation
Shared Package
ML20215G262 List:
References
TAC-64475, NUDOCS 8703230085
Download: ML20215G259 (1)


Text

,

$- # #*,,- UNITED STATES

..,. [ g. NUCLEAR REGULATORY COMMISSION 4

L l WASHINGTON, D. C. 20555 s

,,,.. MAR 171987

! Docket Number: 50-293

$ MEMORANDUM FOR: Jack Donohew, Acting Director-BWR Project Directorate No. I Divisfon of BWR Licensing FROM: L. G. Hulman, Chief 4

Plant Systems Branch Division of BWR Licensing i

SUBJECT:

SAFETY EVALUATION OF PROPOSED TECHNICAL SPECIFICATION

! FOR PILGRIM NUCLEAR POWER STATION (TAC N0. 64475) l .

The Plant Systems Branch of D8L has completed its review and evaluation of the proposed Pilgrim Technical Specification changes. The changes were requested under exigent circumstances, in Boston Edison Company letters dated January 19

, and 27, 1987.

The request involves the Pilgrim Technical Specification.Section 4.7.8.2.a.

regarding the Pilgrim' Control Room High Efficiency Air Filter System '

4 (CRHEAF). Specifically, the request proposes (1) to increase the pressure

! drop across the CRHEAF filter unit from 3 to 6 inches of water, and (2) to add ,

j a 10% tolerance to the specified air flow rate through the filter unit.

! We find the ifcensee's request to be acceptable. Our safety evaluation and "

SALP input are enclosed. t

+

~f

k. }. Hulman, Chief i Plant Systems Branch Division of 8WR Licensing I -

l Enclosures I As stated 4

l cc w/ enclosures:  ;

) W. Houston '

1 T. Quay j J. Calvo 4

R. Bosnak i C. Schulten

4. Auluck 4 '

l l

Contact:

J. Lee, x28191

, _ . . _,- _ -,._ . _ _ _ ._._,_._._,_ _._.~._ _.__ _ - . . - . , _ _ , _ , . _ . _ _ _