Responds to NRC Re Violations Noted in Insp Repts 50-373/87-03 & 50-374/87-04.Corrective Actions:Engineering Analysis Performed & Weed Thermocouple Immediately Had Environ Qualification Maint Performed
ML20215E927
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/02/1987
From: Turbak M
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
3133K, NUDOCS 8706220160
Download: ML20215E927 (3)


Text

o

% . r'N

. tu

,t

/c \ Commonwealth Edison t' One Fir:* NCional Plaza. ChicaDo, Illinois A 7 Address Reply to: Post Office Box 767 "U Chicago, Illinois 60690 0767 June 2, 1987 MrN.% Bert Dasits '

s Regional Admirif trator U.S., Nuclear Regulatory Commission RMjion'III 799 Roosevelt Road.

Glen Ellyn, IL 60137

Subject:

Lass 11e County Station Units 1 and 2  !

Response to Inspection Report Nos. 50-373/87003; 50-374/87004 NRC Docket Nos. 50-373 and 50-374 l Reference (a): J. J. Harrison letter to Cordell Reed dated May 14, 1987

).

J.

Dear Mr. Davis:

1 This letter is in retig,u =c che inspection conducted by Mr. A.

Gautam and other NRC representat 4 > on February 2-27, 1987, of activities at LaSalle County Station. Refeseece (a) ir.dicated that certain activities appeared to be in noncompliance with NRC requirements. The Commonwealth Edison Company response to the Severity Level IV Notice of Violation is i provided in the Attachment.

t i" If you have any further questions on this matter, please direct them to C. M. Allen of this office.

\ g Very truly yours, W.E. C 1 j

M. S. Turbak Operating Plant Licensing Director i f

Attachment cc: NRC Resident Inspector - LSCS 8706220160 G70602 PDR ADOCK 05000373: PDR G

3133K I

i

.lUN 5 197/

. o$ 0 l

. c, ATTACHMENT.

I NONCOMPLIANCE: IR 374/87004-03 (AIR 374-100-87-00403) 10 CPR 50.49 Paragraph (f) requires each item of electrical equipment l j

important to safety to be qualified by testing and/or analysis.

10 CFR 50.49 Paragraph (j) requires a record of the qualification I

. documentation of EQ equipment to be maintained in an auditable form to permit verification that the equipment is qualified for its application and meets its performance requirements during an accident. ,

Contrary to the above, the environmental qualification (EQ) Binder LS029

~

for WEED thermocouples did not include a justification for allowing a WEED thermocouple to be installed without EQ maintenance activities being implemented. During this review, the NRC inspectors identified one WEED thermocouple 2TE-CM058, whose housing had been opened for maintenance, but '

for which appropriate maintenance activities specified in the EQ binder had not been implemented. The licensee stated that their failure to perform the maintenance activities in the EQ binders did not affect the environmental qualification of the WEED thermocouple based on the testing of a PYCO thermocouple; however, the inspectors found no similarity analysis for the PYCO and WEED thermocouples in EQ binder LS029.

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED The Weed thermocouple immediately had its EQ maintenance performed (WR L65410) as stated by the EQ Binder.

An engineering analysis (CQD 034822) was performed which provided justification demonstrating the maintenance items omitted in the work request were not critical to the qualification of the instrument.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER NONCOMPLIANCE Maintenance history of all cr.vironmentally qualified Weed thermocouples was reviewed for missed EQ maintenance. It was determined that the thermocouple uncovered during the audit was the only one having maintenance performed on it without addressing the EQ maintenance items.

.3133K a

u ,

1.,

The stations work request procedure (LAP-1300-1) now requires a documented Technical Staff EQ review of work instructions prior to their performance in an EQ work package. This EQ review ensures all applicable 3Q requirements are addressed in the work package. This added review was not in affect at the time of the work package which omitted the EQ maintenance on the Weed instrument.

DATE OF FULL COMPLIANCE Pull compliance was achieved on March 6, 1987.

l 1

f 3133K l

l l

I l