ML20215E578
| ML20215E578 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/02/1986 |
| From: | Johnson I COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 2205K, IEB-86-002, IEB-86-2, NUDOCS 8610150384 | |
| Download: ML20215E578 (2) | |
Text
Db N
[
Commonwealth Edison
.1
/ 72 West Adcms Street, Chicago, Illinois
\\V f Address Reply to: Post Office Box 767
\\v Chicago, Illinois 60690 - 0767 October 2, 1986 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Braidwood Station Units 1 and 2 Response to NRC I.E.Bulletin 86-02 NRC Docket Nos. 50-456 and 50-457 References (a): NRC I.E.Bulletin 86-02, J. M. Taylor to All OLs and Cps, dated July 18, 1986.
(b): Letter from I. M. Johnson to J. G. Keppler dated July 25, 1986.
Dear Mr. Keppler:
Reference (a) requested certain actions of licensees with Static-O-Ring Differential pressure Switches Model 102 or 103 which were installed as electrical equipment important to safety as defined in 10 CFR 50.49.
In our July 25, 1986 response to the bulletin (Reference (b)), it was indicated that a separate response would be supplied for Braidwood Station prior to its commencing operation pursuant to the provisions outlined in the bulletin.
Braidwood Station has completed their review of the bulletin and determined that none of the SOR differential pressure switches in question (Models 102 or 103) have been installed at the plant. Therefore, the bulletin is inapplicable and no further action is required.
To the best of my knowledge and belief the statements contained herein and in the attachment are true and correct.
In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees or consialtants. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
Ykf DCTb gY 8610150304 861002 PDR ADOCK 0500 6
Mr. J. G. Keppler October 2, 1986 Please address any question that you or your staff may have concerning our reponse to this office.
One signed original is being sent directly to the U.S. Nuclear Regulatory Commission Document Control Room in Washington for reproduction and distribution as required in the bulletin.
Respectfully, n
I. M. Joh Nuclear Licensing Administrator la cc:
U.S. NRC Document Control Desk Washington, D.C.
20555 Resident Inspector - Braidwood SUBSCRIBEDandSWOJR to befory)T his S -::- day of
/ /L t 4A
, 1986 i
OLTC NotarT Public
{
2205K