,a AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-311 Unit Name Salem # 2 Date June 10,1987 Completed by Pell White, Telephone 609-935-6000 Extension 4451 Month May 1987 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)
(MWe-NET) 1 966 17 955 2
950 18 959 3
946 19 961 4
968 20 937 5
930 21 950 6
950 22 931 7
956 23 951 8
953 24 612 9
955 25 924 10 948 26 943 11 969 27 948 12 889 28 952 13 938 29 874 14 950 30 277 15 949 31 598 16 942 Pg. 8.1-7 R1 l
G706220023 870531 DR ADOCK 0500 1
\\
\\
\\
I
~
OPERATING DATA REPORT Docket No. 50-311 Date June 10,1987 Telephone 935-6000 Completed by Pell White Extension 4451 Operating Status
- 1. - Unit Name Salem No. 2 Notes 2.
Reporting Period May 1987 3.
Licensed Thermal Power (MWt) 3411 4.
Nameplate Rating (Gross MWe)
IT75 5.
Design Electrical Rating (Net MWe)
TIT 5 6.
Maximum Dependable Capacity (Gross MWe)llli 7.: Maximum Dependable Capacity (Net MWe) 1106 8.
If Changes Occur in Capacity' Ratings (items 3 through 7) since Last Report,.Give Reason N/A 9.
Fower Level to Which Restricted, if any (Net MWe)
NA
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 3623 49368
- 12. No. of Hrs. Reactor was Critical 744 33535 29293.4
- 13. Reactor Reserve Shutdown Hrs.
0 0
0
- 14. Hours Generator On-Line 744 3325.8 28264/2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2139360 10064477 36072949
- 17. Gross Elec. Energy Generated (MWH) 701580 3303800 28480940
- 18. Net Elec. Energy Generated (MWH) 669470 3157620 27005027
- 19. Unit Service Factor 100 91.8 57.3
- 20. Unit Availability Factor 100 91.8 57.3
- 21. Unit Capacity Factor (using MDC Net) 81.4 78.8 49.6
- 22. Unit Capacity Factor (using DER Net) 80.7 78.2 49.1
- 23. Unit Forced Outage Rate 0
8.2 32.6
- 24. Shutdowns scheduled over next 6 months (type, 3' ate and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 6/30/80 8/2/80 j
Initial Electricity 9/1/80 6/3/81 1
Commercial Operation 9/24/80 10/13/81 8-1-7.R2
7 1
e v
t 7
0 i
e n
is 8
0 t
c g
o ba 2
9 0
c n
n i
i e
. 1 6
e e
r di t
hmc o
r r
e nl ea xer N 0 5
ror w
ao ct El u 1
1 3
otu o
o iS ao 1
m 9
C c
CP sc v 5SS 3
e e 1
ne A
r rr l
n 9 5
dor t ded ee 0
a u 0 4
ni sn rme Smx s-aset
)
5 S J 6 4
att re art ru Gnatter 1
cn em yoa noA oraesoe6 eAe tu hfi of t i a D e n pl1
.oe en s
v rr csc isr itp heei0 Nm no u
e et tno tne bcefScRF a
oi a
r vs ias aaw iuro i
G tN hs C
P nn wrs tro hrP yLt) E e
pn II STa STP xt nr nRR kteee EsrotreEU citlt noinovLN onaex 4IftEfE(
(
DUDTE tn e5 A
F F
mfe n
R S
S aogn oe E
N N
.r ao pd N
A A
mcnti mo E
R R
aSout oC G
T T
r iOc C
cct u
S Siasd N
tuue O
dll anoR I
m4 oaamii r
T e
huuotvde C
te tnntneah U
sd B
X G
eaauorot D
yo E
X E
MMMACPLO E
SC R
31234 59 7
e R8 s
t E9 ntr m
W1 eno a
O cep x
PY ive E
A LER DM g
N n
A f
i og s
NH n
r n
n n
WT di o
i e
i ON otnt a
c a
DO htwc 5
5 5
l ni l
TM tuoa p
oL p
U ehDe x
i x
HT MS R
et t&
e SR s
c O
ee ig r
TP n
rT rn o
IE o
u ti r
NR s
A A
A lr sner U
a2 io eivEn e
a Rai i
R Fe rtla c
yT a al tngr rnp n
7 nanortox os 5
3 5
enitosie mel atit -
ir t 'u 2
3 2
n pt el anar e
ao 1
2 oinuurire t
rH suif gemeh i
u a q a e e pd pt h
D eEMRROAOO W
R-ABCDEFGH l
e 2
l p
F F
F e
y1 P
T 7
7 7
8 8
8 y
e 4
9 0
d b
t 2
2 3
e a
l d
D 5
5 5
du e
0 0
0 ed t
ce e
rh l
oc p
6 7
8 FS m
2 2
2 o
o 1
1 1
C N
0 0
0 1FS ltIi L
a 1
MAJOR PLANT MODIFICATIONS DOCKET NO.:
50-311 REPORT MONTH MAY 1987 UNIT NAME:
Salem 2 i
DATE:
June 12, 1987 q
COMPLETED BY:
L. Miller J
TELEPHONE:
609/339-4497
- DDR NO.
PRINCIPAL SYSTEM SUBJECT 2EC-2236 RHR System Modify pipe support baseplates in the RHR System.
Design Change Request
MAJOR PLANT MODIFICATIONS DOCKET NO: 50-311 REPORT MONTH - MAY 1986 UNIT NAME: Salem 2 DATE:
June 12,1987 COMPLETED BY:
L. Miller TELEPHONE:
(609)339-4497
- DCR SAFETY EVALUATION 10 CFR 50.59 2EC-2236 This design change involved work on sLfety related items but did not alter the function of these items.
This modified design satisfies NRC IE Bulletin 79-02 and ensures additional conservatism.
The pipe support base plates modified under this design change were originally designed to Seismic Class I criteria.
The modified pipe support base plates and connected structural shapes have also been designed to Seismic Class I criteria, but with an additional margin of safety.
The modifications resulting from this design change have no impact on the analysis performed in the UFSAR or to any basis of the Technical Specifications.
This modification has not changed any plant process or discharge and there is no change to the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
DCR - Design Change Request i
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO. 2 JUNE 1987 The unit began the period, limited by electrical system stability requirements, operating at eighty eight percent (88%) power, 1000 MWe gross.
The Unit continued to operate at that level until May 12, 1987, when power was further reduced to seventy one percent (71%), for system stability requirements during a thunderstorm.
The Unit was returned to eighty eight percent (88%) power the same day and continued to operate at that level until May 24, 1987, when power was reduced to thirty four percent (34%) due to blown fuses on the 2C 115 volt vital instrument inverter.
The inverter was repaired and power was returned to eighty eight percent (88%) on May 25, 1987.
The Unit operated at that level until May 29, 1987, when a load reduction to i
seventy percent (70%) was performed as a result of a transformer trip out at the New Freedom switching station.
On May 30, 1987, power was further reduced to thirty percent (30%) for installation of a Trip-A-Unit scheme on Unit 2 and re-energizing of the auxiliary power transformer.
On May 31, 1987, upon successful completion of energizing the auxiliary power transformer, a power ascension was commenced for the remainder of the period.
REFUELING INFORMATION DOCKET NO.:
50-311 ~
COMPLETED BY:
L.K.
Miller UNIT NAME:
Salem 2~
DATE:
June 12, 1987 TELEPHONE:
609/935-6000 EXTENSION:
4497 Month May 1987 1.
Refueling information has changed from last month:
YES NO X
j 2.
Scheduled date for next refueling:
April 9, 1988 3.
Scheduled date for restart following refueling:
June 8, 1988 4.
A)
Will Technical Specification changes or other license amendments be required?
YES NO X
B)
Has the reload fuel design been reviewed by the Station i
Operating Review Committee?
YES NO X
If no, when is it scheduled?
February, 1988 5.
Scheduled date (s) for submitting proposed licensing action:
February 1988 if required 6.
Important licensing considerations associated with refueling:
NONE 7.
Number of Fuel Assemblies:
A)
Incore 193 B)
In Spent: Fuel Storage 224 8.
Present licensed spe nt fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 9.
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
March 2003 8-1-7.R4
to,
O PSEG
- Pubhc Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08033 Salern Generating Station
' June 15, 1987 Director, Office'of Management U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC. 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET HO. 50-311 In' compliance with Section 6.9.1.6, Reporting Requirements for the Salem. Technical Specification, the original copy of the monthly i
operating reports for the month of May 1987 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns'and Power Reductions Major-Plant Modification Operating Summary Refueling Information Sincerely yours, M
4 J. M.
upko, Jr.
General Manager - Salem Operations RH:sl cc: