ML20215E479

From kanterella
Jump to navigation Jump to search
Forwards Revised Maps for Environ Group Procedure 2. Instructions for Updating Procedure stated.W/3 Oversize Drawings
ML20215E479
Person / Time
Site: LaSalle  
Issue date: 06/08/1987
From: Englert C
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20215E481 List:
References
NUDOCS 8706190384
Download: ML20215E479 (4)


Text

.

.X206-

- iDUCUMENT 'CDNT ROLi DESK

'U.Sa'AUCLEAR REGULATURY COMM.

.4 r

June'8, 1987 UASHIhGTON ac 20S55.

J m

e Please find enclosed the revised maps for Environmental Group

. Procedure 2.

Update the procedure in your EG manual by completing the following:

1.

Remove the LaSalle onsite map dated 5-3-85 and insert the j

revised map dated 1-27-87.

']

2.

Remove the Zion offsite map dated 10/84 and insert the revised l

3; map' dated 4-15-87.

Note: The IDNS map is twosided, therefore, the 10/84 offsite map is being replaced with two maps.

'3.

Please. sign and date this control sheet and return to:

Commonwealth Edison Company 72 West Adams Street - Room 1248 i

c/o Christine Englert j

Chicago, IL 60603 Christine Englert Document Control Desk Emergency Planning j

Extension 8630 l

'i

.{

Signature:

Date:

'J cn k hh

, ft 61 3

~

F I

$ l 6867E/33

OVERSIZE DOCUMENT PAGE PULLED SEE APERTURE CARDS 1

NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS

' APERTURE _ CARD /HARD COPY AVAILABLE FROM RECORD SERVICES BRANCH,TIDC FTS 492 = 8989

--