ML20215E479

From kanterella
Jump to navigation Jump to search
Forwards Revised Maps for Environ Group Procedure 2. Instructions for Updating Procedure stated.W/3 Oversize Drawings
ML20215E479
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/08/1987
From: Englert C
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20215E481 List:
References
NUDOCS 8706190384
Download: ML20215E479 (4)


Text

.

.X206-

- iDUCUMENT 'CDNT ROLi DESK

'U.Sa'AUCLEAR REGULATURY COMM.

.4 r .

, June'8, 1987 UASHIhGTON ac 20S55.

J m

e Please find enclosed the revised maps for Environmental Group '

. Procedure 2. Update the procedure in your EG manual by completing the following:

1. Remove the LaSalle onsite map dated 5-3-85 and insert the j 1

revised map dated 1-27-87.

']

2. Remove the Zion offsite map dated 10/84 and insert the revised '!

l 3; map' dated 4-15-87. '

Note: The IDNS map is twosided, therefore, the 10/84 offsite  ;

map is being replaced with two maps.  :

'3. Please. sign and date this control sheet and return to:

Commonwealth Edison Company 72 West Adams Street - Room 1248 i c/o Christine Englert j Chicago, IL 60603 Christine Englert Document Control Desk Emergency Planning j Extension 8630 l 1

l

'i

.{

Signature: ,

Date:

'J cn 61 3 '

k hh , ft

~

F

' I

$ l 6867E/33

OVERSIZE  !

DOCUMENT PAGE PULLED SEE APERTURE CARDS 1 NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS 1

' APERTURE _ CARD /HARD COPY AVAILABLE FROM RECORD SERVICES BRANCH,TIDC FTS 492 = 8989 1