~ June 12, 1987.
t Project No. 669 Mr. Edwin E. Kintner, Chairman a
ALWR Utility Steering Convaittee -
l
'GPU Nuclear. Corporation.
One Upper Pond Road 1
Parsippany, New Jersey 07054
Dear Mr. Kintner:
SUBJECT:
REQUEST FOR' ADDITIONAL INFORMATION RELATIVE TO CHAPTER 2, ALWR q
REQUIREMENTS DOCUMENT j
In addition to the comnents and' questions sent to'you by letter dated May 27, J
1987, we have found'a need for more information relative to Chapter 2 of the H
ALWR Requirements Document. Accordingly..please respond also to the'seven questions in the enclosure'to this. letter.
Sincerely, 9MgW 148w444 Paul H. Leech, Project Manager Standardization and Non-Power.
Reactor Project' Directorate Division of Reactor Projects, III, IV, V and Special Projects Office of Nuclear. Reactor Regulation
]
Enclosure:
As stated cc w/ enclosure Daniel T. Noble, EPRI i
DISTRIBUTION w/o enclosure E6 E.'Hylton H. Berkow NRC PDR PDSNP READING P. Leech P
PDSN P
on-PLeech:bd He w
06/
87 06/}0/87 06/)'J/87
'l e706190227 070612 PDR PROJ PDR 669 J
)
i
. gf UNITED STATES
+
'{ f y
( j',g NUCLEAR REGULATORY COMMISSION 5
' ' e. '! j WASHINGTON, D. C. 20555
'+$.%+#.... #'
June 12, 1987 Project No. 669 Mr. Edwin E. Kintner, Chairman ALWR Utility Steering Committee GPU Nuclear Corporation One Upper Pond Road i
Parsippany, New Jersey 07054
Dear Mr. Kintner:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATIVE TO CHAPTER 2, ALWR REQUIREMENTS DOCUMENT In addition to the comments and questions sent to you by letter dated May 27, i
1987, we have found a need for more information relative to Chapter 2 of-the ALWR Requirements Document.
Accordingly, please respond also to the seven questions in the enclosure to this letter.
6 Sincerely, b
g Paul H. Leech, Project Manager Standardization and Non-Power j
Reactor Project Directorate a
Division of Reactor Projects, III, IV,
]
V and Special Projects Office of Nuclear Reactor Regulation I
(
Enclosure:
i As stated Y
cc w/ enclosure Daniel T. Noble, EPRI l
s N
Enclosure l' REQUEST FOR ADDITIONAL INFORMATION CHAPTER 2, ADVANCED LIGHT WATER REACTOR UTILITY REQUIREMENTS DOCUMENT (TAC NO. 63301)
Questions (1) Page 2-2 What is the " live loading" of valve packing developed by Sec. 2.2.8 AECL for use in CANDU plants? This type of valve packing is not commonly known and should be, therefore, more fully specified.
(2) Page 4-25 Why are the materials for the heater drain piping specified Sec. 4.3 H.5 to be carbon steel upstream of the drain control valve and corrosion / erosion resistant metal downstream from it?
(3) Page 4-25 What provision will be provided for replacement of the spent Sec. 4.3.J.1.b ion exchange resin in the demineralizer/ condensate polisher system without resin regeneration capability?
(4) Page 4-27 Provide the basis for specifying the minimum flow through Sec. 4.3.J.2.b the condensate polisher to be equal to one-third of the total rated condensate flow?
(5)Page5-4 In view of the proposed usage of hydrogen as a corrosion Sec. 5.2.B.4 controlling agent in BWR plants, should the quantities of this gas stored in the plant be larger than a three day supply? Also, guidance should be provided on how this highly combustible gas should be handled and stored at the plant site.
(6)Page5-4 What is the basis for specifying that the required gas Sec. 5.2.B.5 concentrations should be provided by the chemical addition system 90% of plant operating time?
(7)Page6-4 Is the purpose of the condensate makeup purification Sec. 6.3.a system to remove organic comp:unds, such as those which after their decomposition coulo prcciuce sulfides and chlorides, rather than to remote organic carbon as is stated?
4 i
Typos (1) Page IV Should be " Chemical Addition System" Table of Contents j
(2)Page4-26 Should be "... side stream arrangement...
Sec. 4.3.J.2.a (3) Page 5-3 Should be "... above 30% of ratings."
l Sec. 5.2.B.1 (4) Page 7-4 Should be " Morpholine".
j Sec.7.3 (Second paragraph)
I J
i I
c
\\
RECORD OF CORRESPONDENCE CONCURRENCE AND DISTRIBUTION
SUBJECT:
HQ/OGR Proposal for NRC Mini-Audits of SRPO Contractors FROM:
Jim Knight, RW-24 TO:
Robert Browning, NRC PC CODE: KS63 (MARIE ADAMS' IBM) j
)
ORIGINATOR: KARL SOMMER 6-1639 i
DISTRIBUTION QA FILE #K OCRWM CCRU, RW-13 (5)
OCRWM ARCHIVES (2) j ORIGINATOR'S CHRON: SOMMER OGR READING FILE S,L,& QA DIV CHRON S. Kale, RW-20 T.
Isaacs, RW-21 R. Stein, RW-23 J.
Bresee, RW-22 J. Daly, RW-22 C. Newton, RW-24 J. Knight, RW-24 M. E. Langston, RW-40 D. Siefken, Weston H. Steinberg, RW-33 L. Skoblar, Weston G.
Faust, Weston S. Echols, GC-11 R. Poe, EH-32 LL_ Kennedy, NRC L. Barrett, RW-33 J. Neff, SRPO J. Reese, SRPO CONCURRENCES:
kY$
C'/)!K
/
/
Y/ U /87 '
K. Somm W-24 C. Newton, RW-24
/ 16 / 7 7 J. Knight, RT-24 N b
i i
_ _ _ _ _ _ _ _ _ _ _ _ _