Forwards 870318 Joint Emergency Preparedness Exercise Plan Rept & 870327 Offsite Remedial Drill of State of Il Offsite Radiological Emergency Preparedness Plans for Plant
ML20215D421
Person / Time
Site: Braidwood  
Issue date: 06/15/1987
From: Krimm R
Federal Emergency Management Agency
To: Congel F
Office of Nuclear Reactor Regulation
Shared Package
ML20215D424 List:
References
NUDOCS 8706190008
Download: ML20215D421 (4)


Text

.

e a

r

[

4 Federal Emergency Management Agency (jf Washington, D.C. 20472 i

JUN I 51987 MEMORN4 DOM FOR: Frank J. Congel Director olvision of Radiation Protection and Ennrgency Preparedness

]

Office of Nuclear Reactor Regulation i

U. c.

aucle Mp tpry Commission FFOM:

a Kr Assistant Associate Director Office of Natural and Technological Hazards Program

SUBJECT:

Exercise Report of the March 18, 1987, Exercise and the May 27, 1987, Offsite Remedial Drill of the Illinois Offsite Radiological Emergency Preparedness Plans for the Braidwood Nuclear PcMer Station.

This is to transmit a copy of the Exercise Report of the March 18,1987, joint i

exercise of the offsite radiological ee rgency preparedness plans for the

{

Braidwcxxl Nuclear Power Station, located in Will County, near the Village of j

Braidwood, Il31nois. This was a joint exercise for the State of Illinois (partial participation); Grundy County (full) including the communities of Coal City, Mazon, Gardner, South Wilmington and Braceville; Will County (full) including the communities of Braidwood and Wilmington; Kankakee County (full) including the community of Essex; State of Indiana (ingestion); and, Ccmnon-wealth Edison Canpany. The participating counties and camnunities are impacted by the Braidwood plume exposure 10 mile Emergency Planning Zone (EPZ). The report dated June 10, 1987, was prepared by the Federal Emergency Management Agency (FEMA) Region V.

In the March 18, 1987, exercise there wer=. two deficiencies identified, both in Kankakee County. There were also several areas requiring corrective action (ARCA). W e remedy for the deficiencies was a tabletop exercise conducted on May 27, 1987, for Kankakee County and specific training for key management officials and EOC staff. We first deficiency was the County's failure to accurately record the protective action recommendation from the State which led to improper public instructions. The second was the delay in routing the the protective action message to the EOC with the result that the EBS masage was not ready within the 15-ininute requirement. A copy of this report was forwarded to the State of Illinois. On May 18, 1987, the State of Illinois responded with a schedule of corrective actions which was reviewed and approved by FEMA Region V as indicated in the attached memorandum dated June 10,1987.

Based on the results of the March 18, 1987, exercise activity, it is FEMA's view that there is reasonable assurance that offsite preparedness is adequate to protect the public health arri safety in the Braidwood 10-mile EPZ.

If you have any questions, please contact Mr. Robert S. Wilkerson at 646-2860.

Attachment Q61 gDOk O

56 ll As Stated F

PDR l

I

6 Federal Emergency Management Agency b Region V 300 South Wacker,24th Floor, Chicago,IL 60606 (312) 353-1500 June 10, 1987 MEMORANDUM FOR:

Assistant Associate Director Office of Natural and Technological Hazards A'ITENTION:

Ke Gree TH

  • /htfQtt tavev FROM:

Wallace J.

aaver, Chairm n Regional Ass 3 stance Conmittee

SUBJECT:

Braidwood Final Exercise Report Enclosed are copies of the schedules of corrective action from Illinois and Indiana for the exercise weaknesses identified during the March 18, 1987 Braidwood. REP Exercise.

The schedules of corrective action have been reviewed by this office and found to be adequate to correct the weaknesses identified during the exercise.

As you will note, Illinois' schedule of corrective action indicated that a remdial drill would be conducted on May 27, 1987 to correct the two deficiencies identified in Kankakee County during the March exercise.

This office evaluated that drill and found it satisfactory to correct the deficiencies as well as one of the two areas requiring corrective action identified for the County.

The schedule of corrective action is acceptable and adequate to correct the reminSer of the areas requiring corrective action identifie3 in tne exercise report.

Our evaluation of the remdial drill has been incorporated into the final exercise report along with both the Indiana and Illinois schedules of corrective action.

A copy of the final exercise report as well as our responses to the States are enclosed.

We recomiend that you transmit the final exercise report to NRC.

Enclosures

Ken Gceen Federal Emergency Management Agency j

I Region V 300 South Wacker,24th Floor, Chicago, IL 60606 (312) 353-1500 June 10, 1987

)

)

Mr. Charles D. Jones Director, IESDA 110 East Adams Street Springfield, Illinois 62706 1

Dear Mr. Jones:

FEMA Region V has reviewed your schedule of corrective actions for the weaknesses identified during the March 18, 1987 partial participation Braidwood Nuclear Power Station exercise.

That schedule of corrective action indicated that a renedial drill would be conducted on May 27, 1987 to correct the two deficiencies identified in Kankakee County during the March exercise.

This office evaluated that drill and found it satisfactory to correct the deficiencies as well as one of the two areas requiring corrective action identified for the County.

The schedule of corrective l

action is acceptable ando adequate to correct the renninder of the areas requiring corrective action identified in the exercise report.

Our evaluation of the remedial drill has been incorporated into the final exercise report along with both the Indiana and Illinois schedules of corrective action. A copy of the final exercise report is enclosed.

FEMA Region V will notify your office of the date FEMA HQ provides the Nuclear Regulatory Comission (NRC) with a copy of the final exercise report and their finding with respect to the two deficiencies. Please feel free to contact ne if you have any questions.

i I

Sincerel l

/I

(-

(nc -

av' v Wallace J.\\We ver, Chairann Regional Assistance Conmittee Enclosure

% Creen

@ Region V 300 South Wack Federal Emergency Management Agency i

60606 (312) 353-1500 June 10, 1987 Mr. William J. Patterson Director, Indiana Dept. of Civil Defense B-90 State Office Building i

100 North Senate Avenue Indianapolis, Indiana 46204

Dear Mr. Patterson:

FEMA Region V has reviewed your schedule of corrective actions for the weaknesses identified during the March 18, 1987 partial participation Braidwood Nuclear Power Station exercise. The schedule of corrective action is acceptable and adeglate to correct the areas requiring corrective action identified in the exercise report.

Our evaluation of the Illinois remadial drill has been incorporated into the final exercise report along with both the Indiana and Illinois schedules of corrective action. A copy of the final exercise report is enclosed.

FEMA Region V will notify your office of the date FEMA HQ provides the nuclear Regulatory Conmission (NRC) with a copy of the final exercise report and their finding with respect to the exercise. Please feel free to contact ma if you have any questions.

Sincerel 1