ML20215C530

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for June 1986
ML20215C530
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 06/30/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20215C341 List:
References
NUDOCS 8610100323
Download: ML20215C530 (1)


Text

_

o.

REVISED COPY OF JUNE REPORT OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 7/15/86 COMPLETED BY N. W. GRANT TELEPHONE 305/552/3675 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD:

JUNE 1986

3. LICENSED THERMAL POWER (MWT): _________ __ 2700
4. NAMEPLATE RATING (GROSS MWE):

_ 830 850

5. DESIGN ELECTRICAL RATING (NET MWE):
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

827

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEP'S NUMBER 3 THROUGH 7)-

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) __
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 4343 83495.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 413.5 4023.3 60179.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0

-0.0%

205.3

14. HOURS GENERATOR ON-LINE 406.9 3991.0 59793.9
15. UNIT RESERVE SHUTDOWN HOURS _________,_

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1081761 10695146 151587413 359090 3585010 49641515
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

337894 3404324 44838116

18. NET ELECTRICAL ENERGY GENERATED (MWH) __

56.5 91.9 71.6

19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR __

56.5 91.9 71.7

21. CAPACITY FACTOR (USING MDC NET) 56.7 94.8 70.3 l
22. CAPACITY FACTOR (USING DER NET) ____

56.5 94.4 68.8 l

23. UNIT FORCED OUTAGE RATE 0

0 4.2 l

24. SHUTDOWNS SCMDULED OVER NEXT 4 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l l

l h0IhCK05000335 23 860814 r

R PDR

. = -. _

..-.._m,

. - - -,,