ML20215C530

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for June 1986
ML20215C530
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 06/30/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20215C341 List:
References
NUDOCS 8610100323
Download: ML20215C530 (1)


Text

_ _

o.

REVISED COPY OF JUNE REPORT OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 7/15/86 COMPLETED BY N. W. GRANT TELEPHONE 305/552/3675 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: JUNE 1986
3. LICENSED THERMAL POWER (MWT): _________ __ 2700
4. NAMEPLATE RATING (GROSS MWE): _

850

5. DESIGN ELECTRICAL RATING (NET MWE): -___ _

_ 830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 827
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEP'S NUMBER 3 THROUGH 7)-

SINCE LAST REPORT, GIVE REASONS: ,, _,, _

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) __ __
10. REASONS FOR RESTRICTIONS, IF ANY: _ __

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _ _,,

720 4343 83495.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 413.5 4023.3 60179.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 -0.0% 205.3
14. HOURS GENERATOR ON-LINE ___

406.9 3991.0 59793.9

15. UNIT RESERVE SHUTDOWN HOURS _________,_ 0 0 0
16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1081761 10695146 151587413
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 359090 3585010 49641515
18. NET ELECTRICAL ENERGY GENERATED (MWH) __ 337894 3404324 44838116
19. UNIT SERVICE FACTOR 56.5 91.9 71.6
20. UNIT AVAILABILITY FACTOR __ _ _ _

56.5 91.9 71.7

21. CAPACITY FACTOR (USING MDC NET) 56.7 94.8 70.3 l
22. CAPACITY FACTOR (USING DER NET) ____ _

56.5 94.4 68.8

23. UNIT FORCED OUTAGE RATE __ _

0 0 4.2 l

l 24. SHUTDOWNS SCMDULED OVER NEXT 4 MONTHS :

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __

l l

l r

23 860814 h0IhCK05000335 R

PDR

. = - . _ _ , . , , , _ . - . _ _ - , ..-.._m, __ _ . . . - - - , ,