Monthly Operating Rept for Jul 1986
ML20215C381
Person / Time
Site: Monticello 
Issue date: 07/31/1986
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8610100262
Download: ML20215C381 (5)


Text

-

OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 8-4-86____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS d

l Notes l

-1.

Unit Name : ________________________MonticeLto l

l

2. Reporting period: ___________________ JULY.

l l

3. Licensed Thermal Power (MWt):

____________1670 I

.I 4.-Nameplate Rating (Gross MWe):

_____________569 l

l

=5.

Design Electrical Rating (Net MWe):

_____545.4 I

l'

6. Maximum Dependable Capacity (Gross MWe): __564 l

l

7. Maximum Dependable Capacity (Net MWe):

____536 l__________________________l

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________

.10. Reasons For Restrictions, If Any: __N/A____________________________._________

i 4

This Month Yr.-to-Date Curautative

11. Hours In Reporting Period

_____744

_____5087

____132240 l

12. Number Of Hours Reactor Was Critical

___485.0

___3354.6

__101603.8 j

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___442.2

___3309.9

__ 99327.2 i

-15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated-(MWH)

._ 642029

_ 4561363

_150815605

17. Gross Electrical Energy Generated (MWH) __215959

__1549567

__51200844

18. Net Electrical Energy Generated.(MWH)

__203211

__1475967

__48948006

19. Unit Service Factor

__ 59.4%

___ 65.1%

____ 75.1%

20. Unit Availability Factor

__ 59.4%

___ 65.1%

____ 75.1%

21. Unit Capacity Factor. (Using MDC Net)

__ 51.0%

___ 54.1%

____ 69.1%

22. Unit Capacity Factor (Using DER Net)

__ 50.1%

___ 53.2%

____ 67.9%

'23. Unit Forced Outage Rate 0.0%

0.0%

4.7%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

__None__________________________________________________________________

i

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:____________

l

26. Units In' Test Status (Prior to Commercia L Operat ion): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1

l 8610100262 860731 PDR ADOCK 05000263 h

N R

4

\\ \\\\

e AVERAGE DAILY UNIT POWER LEVEL T

DOCKET NO.

50-263______

UNIT MonticelLo__

DATE 8-4-86____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JULY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

_3____________

17

__________36o____________

2

-4____________

18

__________493____________

3

-5____________

19

__________591____________

4

-6____________

20

__________475____________

5

-7____________

o1

__________5o3____________

6

_6____________

no

__________489____________

7

-6____________

23

__________534____________

8

-5____________

24

__________533____________

9

-6____________

25

__________509____________

10

-6____________

26

__________534____________

ii

-6____________

27

__________534________-_--

12

__________-13____________

28

__________535____________

13 24____________

29

__________541____________

14

__________9.38____________

30

__________534________---_

1r

__________30o____________

31

__________537____________

a 16

__________304____________

INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 8-4-86____.

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JULY 7-1-86 to Shutdown for 1986 refueling outage.

7-10-86 7-11-86 Reactor critical for BOC-12 physics testing.

7-13-86 Generator on-Line for overspeed test warmup.

Performed turbine overspeed trip test.

Generator on-Line.

7-14-86 to Power operation.

7-31-86 Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified survelLLance testing.

'e f

i

e o

"~*

DOCKET NO.

UNIT SilUTOOWNS AND POWER REDUCTIONS UNIT NAME

==~-'a DATE 8-a-8s A. r..

Nyrabo COMPLETED BY REPORT MON fil mnw TELEPilONE 5

? u. ?

=_

-i g%

Cause & Currectise Licensee gn.

h Dale jg

3.j 3

2=

4

_5 E,sent a7

c. 3 Action to

$5 5

j 5. j Repur =

no

} '-"

Prevent Recurrence 6

1 5-1-86 S

288.8 C

1 N/A ZEEE EEEEEE Continuation of the 1985 r e f t's e li n g outage.

2 7-13-86 5

13.0 8

1 N/A HA TURBIN Generator taken off-line for turbine overspeed test.

l l

l J

. i 1

2 3

4 F: Forced Reason.

Method:

Exhibit C-Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test

2. Manual Serain.

Entr> Sheets fur Licensee C Refueling 3 Automatic Scram.

Esent Repor (LERI File iNUREG-D. Regulatory Restriction 4.Other (Explain) 01611 E-Opesator Training 11.icense E.samination 4

F-AJounistrative Eshibii 1 - Same Source G Operational Eirus (Explaint lo!77) 11 Other (Explain!

r 7%,

0 Northem States Power Company 414 Nicollet Mail Minneapoks. Minnesota 55401 Telephone (612) 330-5500 August 8, 1986 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report July, 1986 Attached are twelve copies of the Monthly Operating Report for July, 1986 for the Monticello Nuclear Generating Plant.

hsxEdL Uh j David Musolf u

Manager of Nuclear Support Services DMM/MMV/ dab cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment d