ML20215C351

From kanterella
Jump to navigation Jump to search
Forwards Addenda to Preoperational Integrated Leak Rate Test Final Rept Submitted by Util .Additions & Updates to Subj Rept Also Encl.Info Provided to Assist in Closure of Unresolved Item 50-424/86-136-01
ML20215C351
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/09/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20215C354 List:
References
SL-2613, NUDOCS 8706180083
Download: ML20215C351 (3)


Text

>

t r

3

  • a' Georgia Power Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Mailing Address:

Post Office Box 4545 Atlanta, Georgia 30302 Georgia Power L. T. Gucwa Ine southem o!cctnc system Manager Nuclear Safety and Licensing SL-2613 0335m X7GJ17-V790.

June 9, 1987 U. S. Nuclear. Regulatory Commission I ATTN: Document Control Desk Hashington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424.

OPERATING LICENSE NPF-68 ADDENDA T0 PREOPERATIONAL INTEGRATED LEAK RATE TEST FINAL-REPORT Gentlemen:

By letter GN-1225 dated December 12, 1986, Georgia Power Company submitted the final report of the Vogtle Unit 1 preoperational integrated leak rate test to' the Director of Nuclear- Reactor Regulation as required by 10 CFR 50, Appendix J, V.B.1. Subsequent to the transmittal of the subject report, some additions and updates were generated and are enclosed. Instructions for inserting the replacement pages are included in the enclosure. Five copies of this letter : and its enclosure are hereby provided and should be forwarded to the ~ Director of Nuclear Reactor Regulation for review. A copy. of this submittal has been provided to NRC Region II.

The addenda to the report resulted.from the following:

1. Encapsulation vessel leakage in the tota? leakage for Type B and C penetrations was not originally provided in the ~ report and has been added; and,
2. Rework of several containment isolation val'ves- necessitated updating certain of. the measured leakage values originally provided in the subject report.

Please note that the final acceptability of the preoperational integrate'd' leak rate test (Test' # 1-300-04) for Vogtle Unit 1 is not affected by these changes.

8706180083 870609 .

PDR ADOCK 05000424 P PDRc \\

9 .

i

.iGeorgiaPower d i

U. .S. Nuclear Regulatory Contlission June 9, 1987 Page Two NRC Region II is notified by copy of this letter that the information- .

provided by this submittal should assist them in the ' closure of l Unresolved Item 50-424/86-136-01, " Review . Inspection -Results 'of the ,

Licensee's Review of the Containment Combined Leak . Rate Surveillance l Calculation for All Penetrations & Valves. Subject to Type B _and C Tests",

discussed in NRC Inspection Report 50-424/86-136. dated February 3, 1987. R

^

Should you have any questions in this regard, please contact this office at any time. '

Sincerely, c#rn p L. T. Gucwa

)

JAE/im Enclosure I I

c: (see next page) l

/

/' j

.F t

/ ,

r'. $^

~

1 0335m i

' 700776

1

- e'.

.s 1 Georgia Power sA r-U. S. Nuclear Regulatory Commission June 9,1987 a Page Two- "

c: Georoia Power Comoanv  : i Mr.. R. E. Conway Mr.!J. P. O'Reilly.

u

,. Mr. G. Bockhold, Jr. e Mr. J. F. D'Amico lMr. C. W. Hayes- /?j - i

~' ' '

G0-NORMS #4 ' '

. c. .;

i Southern Cemany_S.tryices Mr. R.:A. Thomas Mr.. J.'A. Bailey / , ,,

Shaw. Pittman. Potts & Irowbridge >

f .

Mr. B.. W. Churchill,: Attorney-at-Law -  ;

j -I JIroutman. Sanders.Lqtkbrman&Ashm_ arf. '

i Mr. A..H. Domby, Attorney-at-Law

.l U. S. Nuclear Reculatory_ Commission Dr. J. N. Grace, Regional Administrator-

. 1 Ms. M. A. Miller, Licensing Project Manager, NRR-(2 copies)

Mr. J. F. Rogge Senior / Resident Inspector-0perations; Vogtle-Georaians Acainst Nuclear Energy.  !

Mr. D. Feig- -

. 14s. C. Stangler

,.-r -

J B

gJ Y

a

, 1 r

Y l'

, '. , / ,

/,'

f

, t*

f 0335m

.f . ' t' 7pyyy I

_j fu a