Responds to Je Gagliardo Re Deficiencies Noted During Insp on 870406-10.Encl Schedule Reflects Plans for Resolution of Deficiencies.Addl Training of Personnel Planned as Corrective Action
ML20215B895
Person / Time
Site: South Texas  
Issue date: 06/12/1987
From: Vaughn G
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ST-HL-AE-2212, NUDOCS 8706170496
Download: ML20215B895 (3)


Text

i The Light COmpMy irousion i.igniiog & i ower i:o. isox i7oo iiousion.rexas 77ooi (7ia> 22s-92ii i

l June 12, 1987 ST-HL-AE-2212 File No.: G9.8 10CFR50.47 U. S. Nuclear. Regulatory Commiscion Attention:

Document Control Desk Washington,'DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Emergency Response Capability Deficiencies This letter is in response to Mr. J. E. Gagliardo's letter of May 12, 1987 which provided the results of an inspection conducted April 6-10, 1987 at i

the South Texas Project Electric Generating Station (STPEGS), Units 1 and 2.

This was an inspection of the emergency response capabilities during an j

exercise of the emergency plan and procedures.

The attached schedule reflects our plans for re'. solution of the four deficiencies identified in the inspection report.

Our corrective actions will i

generally consist of additional training to upgrade th3 performance capabilities of our personnel.

If you should have any questions on this matter, please contact Mr.

M. A. McBurnett at (512) 972-8530.

OJp>'

G. E. Vaughn l.

Vice President Nuclear Plant Operations JAB /MAM/lj m

Attachment:

Deficiency Completion Schedule a46 d)pf gd.-1.6.Oa Learh

'I L3/NRC/ei f

I 8706170496 B70612 gDR ADOCK 05000499!

PDR,

. Ilouston Lighting & Power Company ST-HL-AE-2212 File No.: G9.8 Page 2 cc:

Regional Administrator, Region IV M.B. Lee /J.E. Malaski Nuclear Regulatory Commission City of Austin 611 Ryan Plaza Drive, Suite 1000 P.O. Box 1088 Arlington, TX 76011' Austin, TX 78767-8814

' N. Prasad. Kadambi,.Proj ect Manager A. von Rosenberg/M.T. Hardt i

U.S. Nuclear Regulatory Commission City Public Service Board 7920 Norfolk Avenue P.O. Box 1771 Bethesda, MD '20814 San Antonio, TX 78296

' Robert L. Perch, Proj ect Manager Advisory Committee on Reactor Safeguards i

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue 1717 H Street Bethesda, MD 20814.

Washington, DC 20555 Dan R. Carpenter Senior Resident Inspector / Operations e/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 Claude E. Johnson Senior Resident Inspector / Construction L

c/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 M.D. Schwarz, Jr., Esquire Baker & Botts one Shell Plaza Houston, TX 77002 J.R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 T.V. Shockley/R.L. Range Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 Revised 2/3/87 l

L3/NRC/ei

-f.

c

l

+

ATTACHMENT ST-HL AE-2212 Page 1 of 1 Deficiency Completion Schedule HL&P NRC Action Item Scheduled Deficiency Number Number Completion Description of Deficiency 498/8712-01 0065 09/01/87 Inaccurate dose projections 499/8712-01 due to inability to determine release rate. Also, did not use field teams effectively to obtain field measurement data.

498/8712-02 0061 08/01/87 Concept of operation for use 499/8712-02 of in-plant teams resulted in excessive time being taken to constitute and dispatch teams.

498/8712-03 0066 08/01/87 Individual radiation exposure 499/8712-03 controls were not provided or considered for the field monitoring teams.

498/8712-04 0063 08/01/87 There were no fully dressed 499/8712-04 and equipped teams available to enter areas where radiological conditions were either unknown or extreme, as required by procedure.

Additionally, a reactor operator was dispatched from the control room to rendezvous with the in-plant team without being briefed on the team mission or radiological conditions.