ML20215A817

From kanterella
Jump to navigation Jump to search
Forwards El Jordan 860930 Memorandum to FEMA Re FEMA Review of Util Revs 7 & 8 to Offsite Plan.Related Correspondence
ML20215A817
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/01/1986
From: Bordenick B
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Kline J, Margulies M, Shon F
Atomic Safety and Licensing Board Panel
References
CON-#486-0962, CON-#486-962 OL-5, NUDOCS 8610060250
Download: ML20215A817 (2)


Text

T f

, c r **

  • 00t.6ETED US #00LKETED USNRC 86 ET -3 All;43 Morton B. Margulies, Chairman Dr. Jerry R. Klhtm DCT -3 All :46 Administrative Judge Administrative Judge,.

y Atomic Safety and Licensing Board Atomic Safet ensi, ngl. Board

'Conimld U.S. Nuclear Regulatory Commission U.S. Nuclea

$6i ""fion Washington, D.C.

20555 Washington, D.C.

2 Mr. Frederick J. Shon Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 In the Matter of LONG ISLAND LIGliTING COMPANY (Shoreham Nuclear Power Station, Unit 1)

Docket No. 50-322-OL-5 (EP Exercise)

Dear Administrative Judges:

Enclosed is a copy of a Memorandum dated September 30, 1986 to Richard W. Kriman of FEMA from Edward L. Jordan of the NRC Staff regarding FEMA review of Revisions 7 and 8 to the LILCO Offsite Plan.

Sincerely, Bernard M. Bordenick Counsel for NRC Staff ec: With Enclosure 1

Service List l

8610060250 861001 PDR ADOCK 05000322 G

PDR.

UFU :00C

_bfed______:. OOC

=--

NME BBordenick EReis IKIE :10/01/86

10/01/8S RESIGNATER ORIGINAL certstree ny 850-1 p

September 30, 1986 1

MEMORANDUM FOR: Richard W. Krimm

' Assistant Associate Director Office of Natural and Technological Hazards Federal Fmergency Management Agency FROM:

Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

SUBJECT:

FEMA REVIEW 0F REVISIONS 7 AND 8 TO THE LILC0 0FFSITE PLAN On July 16, 1986, I forwarded to FEMA Revision 7 of the LILC0 offsite plan dated June 20, 1986, and LILCO's June 20, 1986 response to the FEMA exercise report, requesting that FEMA review these documents as part of FEMA's ongoing effort to assess the adequacy of offsite plans and preparedness for Shoreham.

On September 18, 1986, LILC0 submitted Revision 8 of the Shoreham offsite plan in response to the FEMA Region II post exercise assessment and to replace the Nassau Coliseum with LILC0 facilities as evacuee reception centers. LILC0 pro-vided copio,5 of Revision 8 directly to FEMA Region II and RAC members, as well as the NRC on that same date.

This is to request that FEMA include Revision 8 in its.' review of the adequacy of Shoreham's offsite plan.

Y While the review of these revisions should be completed as soon as possible to avoid any potential for impacting the licensing schedule, it is our understanding, based on discussions between you and Sheldon Schwartz, that FEMA will provide its findings to NRC not later than December 15, 1986.

tMe'ad En.3 k

f. A Jordan Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement