R
~~
Olla!!FirATION IVAtUATION WORK SHEET
/
LPubl SJrvice Company of N2ts Hampshire Preparsd By:
MNC Dat2: F lM4 M y. b l Date:S[Ja//'/
che 5 443 EQUlFEENT GUALIFICAllGN Flti h0.113-03-01 Checked 3y:
V V
Fostulated Environa.ent Quallfled Er v f ronwnt Qualificatlon Outstanding Equf reent Description Paraseter value R e ic e i r.. e value Reference Methed itees Purchase Order No.:
9763-006-113-03 Operating 2
1 Year 3
Test and Time
! Year
- p. I Note 2 Appendix 4 Analysts None Equipnient 10 ho(s).:
EDE-CBL-1 Peak 2
3 Temperature 375
- p. 1 390
- p. 3 Test Mone (DF) 5 Peak 2
3 Equipment Type:
Pressure 60
- p. I 112
- p. 3, 9 Test None 600 Volts Power Cable (Psig)
Appendtx 5 Manufacturer: Okontte Relative 2
Humidtty 100
- p. I 100
- p. 3, 7 Test None (1)
Model Number:
600 Volt w/0kontte (EPR) Insulation Chemical Boric Acid 2
Boric Acid 4, 3 Spray (pil) 1.21 WT
- p. I 1.71 WT
- p. 4 Test None pH = 7.5 - 10.5 pil = 10.5 Appendtx 4 Accuracy: Spec: N/A
- p. 7 Demon: N/A 40 Tear Norinal 8
2 3
Radfation Dose 2 x 10 (Rads) p.
I 2 x 108
- p. 3, 9 Test None Year Accident Limiting Environment:
Radiation Dose 2
(Rads) p.
1 Location: Containment Building (All Zones)
Aging 194/40 1
194f40 3
Test and 0
(90 C)
Appendix 2 Analysis.
None Rad Zone: Primary Aux.
(CF/ Years)
(90 C) pp. 3, 4 Butiding (PB-15A, PB-18)
Note 1
('h20'8"
[30 days 23*8" 3' Below 9
Test and Lowest Elevation: (-
Subaregence Flood tevel 7, 8, 10 Note 2 Analysis Mcne Flood Level:
Above Flood Level: No Deci.menta tion Ecrerences:
Hotes:
1 UEAC 5pecification No. 9763-006-113-3. Rev. 2, dated 11/30/82.
1.
The limiting radisticn renes are P8-15A and P8-18. Zones 2.
UEEC Drawing No. 9763-F-300219, Rev.17, Service Environrnent Chart, dated 7/22/85.
PB-4 and PB-19 have been esluded since no electrical 3.
FP-31412-06, Nuclear Qualtitcation Deci. ment for Ononite Insulated Cat,le.
equipment is installed in these zones (Reference 6).
4 Seabrook E.Q. File No. 113-03-01, Assessment Checklist, Note 9.
2.
Inside containnent, this cable is connected to motor operated 5.
Seabrook E.Q. File No. 113-03-01, Assessment Checklist, Note 2.
valves $1-V-17 and 32 and C5-V-149. These valves perfore t
6 5BU-92605, UE&C's letter to Impell, dated 2/13/85.
safety functions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during a LOCA or M5LB. Only 7.
5B0-96263, Seabrook Station Flooding Study Hatriz.
the cable connected to these valves may be suteerged during 8.
Impell Leter No. 0570-032-15f,, dated 2/2/86.
these events; however, it is quallfled for 30 dags when sub-9.
Seabrook E.Q. File No. 113-03-01, Assessment Checklist, Note 3.
merged (Ref. 9) during which time all the valves safety
- 10. Memorandum from G. Moore (Impell) to A. Biswas (Impell, 2/22/86, functions will be completed. After 30 days, this equipment will n t fall in a manner detrimental to plant safety or mis-8612110276 860930 lead the operat r.
Areas outside c ntaineent will be pumped PDR ADOCK 05000443 d *n prior to esteeding the 30 day submergence qualification G
PDR time.
s 001.EEIEC esnPC ETA 5 s *j'* *,, s
., g -s Y
{
xa anaq' p,;Ji y
se-.
pse DCCY' s***# a w
- ps
[&
w%
W W
V
/
-. w ye te#
i i
i s.
e L_
M
f-QUAllflCATION [VAIUATION WORK 5HffT Pybitc hr ce Comp ny of Neu llaapshire Prepared By: M I//[<~
Date: v' J '
(.
/
~34h'%
Sub-4k 5 tion p-443 EQUlFMEN1 QUAllIICAll0N Fitt h0. 113-17-01 Checked By:_hlw u M W r/ Date:
Docket:
fl U
Fo s~Ti,T aTEITiid eTnunT-Qual t ried E nvi ronment Quellfication Outstanding Equireent Desertption Parameter va l ue.
Re ri re nce vaTue Reference Method items 4, p. 4-1, Furchase Order No.:
9763-006-113-17 Operating I
I Year 5
- p. 4-2 Test and Time 1 Year Sheet 1 Note 2 6, p. 10 Analysts Nore
- 7. Point 3, 6 Equipment ID No(s).:
9 EDE-CBL-2 Peak 1
5 Temperature 37 5 Sheet 1 305
- p. 3-10, 4-2 Test None (OF)
Peak 1
5 Equipment Type:
Pressure 60 sheet 1 66
- p. 3-10, 4-2 Test None 600 V Control Cable (Psig)
Marufacturer:
Relative 1
5 AIaconda Humidity 100 Sheet i 100
- p. 4-2 Test Mone Modzl Number:
(%)
FR-EP, 600V Chemical Boric Acid 1
Spray (pil) 1.2% by wt.
Sheet 1 3.541 by wt.
- p. 3-10, 4-2,4-3 Test ht,ne pH 7.5 to 10.5 pH 7.5 to 10.5 7, point 5 B
Accuracy: Spec: N/A Demon: N/A 40 Year Normai 8
1, Sheet 3 5
Radiation Dose 2 x 10 8
(Rads)
Note 1 2 x 10
- p. 3-2 Test None 1 Year Accident Appendix C 11~tting Environment:
Radiation Dose 1, Sheet 3 Lscation: Containment (Rads)
(All Zones)
Rad Zone: Primary Aux.
Aging 160.7/40 3
160.7/40 2
Test and None Bldg. (PB-15A, PB-18)
(0F/ Years)
(11.50C)
(71.50C)
Analysts Note 1 Lowest Elevation: L L23'0" 3' Below
- 11. 13 12 Test and Flood Level:
L-h20'8" Sut4nergence Flood level and 14 30 days Note 2 Analysts None Above Flood Level: No
~
Notes:
Documentation
References:
1.
UEEC Drawing No. 9753-F-300219 Revision 17, Service [nvironment Chart. 7/22/B5.
1.
The ltatting radiation zones are PB-15A and PB-18.
2.
FP-32541-02, Attachment AT-1 to FIRL Technical Report No. F-C4969-1, 7/13/81.
Environmental Zones PB-4 and PB-19 are excluded since no 3.
MM-#8110A, UESC Memorandum, dated 12/1/81.
electrical equipment is installed in these areas (Ref. 10) 4.
FP-32540-02, Attachment AT-2 to F-C4969-1,. July 1980.
2.
Inside containment, this cable is connected to motor 5.
FP-32538-02. FIRL Report No. F-C4969-1, Qualification Test of Class IE Electric operated valves SI-V-17 and 32 and C5-V-149. These valves
~
Cable in a simulated SLB and LOCA Environment, July 1979.
perfom their safety functions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during a 6.
IP-33266-01 ACTON Environmental lesting Corporation. Test Heport No. 16587-81N.
LOCA or MSLB. Only the cable connected to these valves Revision 1, 7/23/81, may t>e submerged during these events! however, it is quell-7.
VUO32814. Anaconda-Ericsson Letter to UESC, dated 1/6/82.
fled for 30 days when submerged (Ref. 12) during which 8.
Seabrook E.Q. File No. 113-17-01, Assessment Checklist, Note 3.
time all the valves' safety functions will be completed.
9.
Seabrook E.Q. File No. 113-17-01, Assessment Checklist, Note 2.
After 30 days, this equipment will not fall in a manner
- 10. SBU-92605, Letter f rom UESC to Impell, dated 2/13/85, detrimental to plant safety or mislead the operator. Areas 11, 58U-96263, Seabrook Station Flooding Study Hatrix, outside containnent will be pumped down prior to exceeding
- 12. Seabrook EQ File No, 113-17-01. Assessment Checklist, Note 13.
the 30 day submergence qualtitcation time.
- 13. Impell letter No. 0570-032-NY-156, 2/2/86.
De GmmitYuTv-A Dr3rn1 90aTaf%
[
~'
QtiAllFICATION LVALUATION WORK SHFET fy,
f)
/ /
Pubile 5;rvice Company of New Hampshire Pr; pared By:. h U/4e Data d /8 A 5;abrosk Station
~
/,
Docket: 50-443 EQUIFMINT QUALIFICATION FILE NO. 113-18-01 Check d By: g /=,M/C (/
WMI Date:
is s
Postulated Environnent Quallf f ed E nviron:nent Qualification Outstanding Equipment Description Parameter Value Reference Value Reference Method Items 4, p. 10 Purchase Order No.:
Operating 2
1 Year 5, p. 4-2 Test and 9763-006-113-1B Time 1 Year
- p. 1 Note 2 10, p. 4-1 Analysts None 6 Points 3, 6 Equfpment 10 No(s).:
7 EDE-CBL-3 Peak 2
5 Temperature 37 5
- p. 1 385
- p. 3-10, 4-2 Test None (OF)
Peak 5
Equipment Type:
Pressure E0 2
66
- p. 3-10, 4-2 Test None Instrumentation Cable (Psig)
- p. 1 Relative Manufacturer:
Humidity 100
?
100 5
Test None-Anaconda (1) p.
I
- p. 4-2 Model Number:
Chemical Boric Acid
?
Boric Acfd 5, p. 3-10, 300 Volt. FR-EP Spray (pH) 1.7% by Wt.
p.
1 3.54% hy Wt.
4-2, 4-3
. Test None pH 7.5 to 10.5 pH 7.5 to 10.5
- 6. Point 5 Accuracy: Spec: N/A 9
Demon: N/A 40 Year Normal Radiation Dose 2.0 x 108 2
5 0
(Rads) p.
3, Note 1
- 2. x 10
- p. 3-2 Test None 1 Year Accident Appendix C j
timittnq Environment:
Radiation Dose 2
I"' 5' D'
Location: Containment (All Zones)
Aging 194/40 l
194/40 4
Test and i
Pad Zone: Primary Aux.
(DF/ Years)
(90"C) p. '-
(90 C)
- p. 6 Analysis None Bldg. (Note 1)
LowestElevation:(-)22'8"
?' Below 8, 11 13 Test and Flood Level:
i-)20'8" Submergence Floed Level and 12 30 Days Note 2 Analysis None Above Flood Level: No Documentation
References:
ilotes:
- 1. UE&c 5pecification No. 9763-006-113-18. Re v.
1, Specification for 300 Volt 1.
The Ifmiting zones for ra3TaTTon are PB-15A and PB-18.
Instrument Cable, 11/30/81.
Zones PB-4 and PB-19 have been excluded since no electrical
- 2. UE&C Drawing No. 9763-F-300219. Rev.17, Service Environment Chart. 7/2?/85.
equipment is installed in these areas (Reference 3).
- 3. 5B0-92605, UE&C Let ter, dated 2/13/85.
2.
Inside containment, this cable is connected to inotor
- 4. FP-33266-01, ACION Test Report No.16587-BIN, 7/23/81.
operated valves $1-V-17 and 32 and CS-Y-149. These valves
- 5. FP-32652-02, FIRL Report F-C4969-1, Qualf fication Test of Class IE Flectric Cable perfonn their safety functions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during a LOC in a Strulated stb and LOCA Environment, 7/80.
or MSLB. Only the cable connected to these valves may be
- 6. VU32814 Anaconda's letter to UF AC, dated 1/f'/B?.
sutnerged during these events; however, it is qualf f ted for
- 7. Seabrook EQ Tile No. 113-18-01, Assessment the<llist Note 3.
30 days when submerged (Pef.13) during which time all the B. SBU-96263 UE&C tetter addressed to TAEC on flooding Study Matrix.
valves' safety functions will be corpleted. After 30 days,
- 9. Seabrook EQ File No. 113-18-01, Assessment Checklist, Note !?.
this equipment will not fall in a manner detrimental to
- 10. FP-32654-02, Attachment AT-2 to FIRL Report No. F-C49fi9-1, 7/13/A1 plant safety or mislead the operator. Areas outside con-
- 11. Impe11 Letter No. 0570-032-NY-156, 2/7/86.
tainment will be pumped down prior to exceeding the 30 day
- 12. Impell Memorandum f rom G. Moore to A. Biswas, ?/??/86 submergence qualification time.
- 13. Seabrook EQ Flie No. 113-18-01, Assessment Checklist, Note 14
..