Forwards Assessment Plan NRC Const Insp Program, Providing Plan & Schedule for Completing Item 3 of Chairman Zech 870512 Memo Re Commission Approval of Ofc of Inspector & Auditor & Comanche Peak Review Group Repts
ML20214W197
Person / Time
Site: Comanche Peak 
Issue date: 06/09/1987
From: Murley T
Office of Nuclear Reactor Regulation
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
WITS-870089, NUDOCS 8706150145
Download: ML20214W197 (4)


Text

.

ee -W6 JUN _91987 MEMORANDUM FOR:

Victor Stello, Jr.

Executive Director for Operations FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

RECOMMENDATIONS PURSUANT TO THE COMANCHE PEAK REPORTS (WITS 870089)

By memorandum dated May 12, 1987, Chairman Zech identified those recommendations pursuant to the OIA and Comanche Peak Review Group reports that have been approved by the Commission.

Item No. 3 of Chairman Zech's memorandum states:

3.

NRR should examine, in more detail, the inspection records for a facility within Region IV which did not receive as much attention from either NRC or utility conducted efforts

If the results of such review require, further staff reviews of other plants should be performed.

The enclosure to this memorandum provides the plan and schedule for completing this item.

original signed by James H. Sniezek l%ThomasE.Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated i

CONTACT:

W. Paulson, NRR/PD-IV 49-29410 DISTRIBUTION Dm:hetr File NRC PDR Locar PDR E00 Reading PD4 Reading T. Rehm T. Murley J. Sniezek F. Miraglia D. Crutchfield F. Schroeder J. Heltemes, AE0D l

J. Calvo W. Paulson P. Noonan

/LA PD4 PD4/DO D

D PNoonan WP, s n:sr JCalvo S

~ der D

ld e

6/d 87 6/ /87 6/f/87 6/$-/87 6/

87 ADP{y,11a F %

Fl( A0 1 ey j p/37 6/

7 YIM8%,

l.

r ENCLOSURE ASSESSMENT PLAN NRC CONSTRUCTION INSPECTION PROGRAM PURPOSE To determine, for a selected plant in Region IV, whether the construction inspection program was adequately completed.

PLANT SELECTION The plant selected for this assessment should be one which has not been subjected to a substantial augmented inspection effort by NRC or a major corrective action program or verification program by the licensee.

In addi-tion, for a meaningful review and comparison of up-to-date construction inspec-tion program information, the plant should have been initially licensed within the past two to three years.

~

REVIEW GROUP ORGANIZATION Specific review group assignments should include the following:

1.

A team leader from NRR, preferably a supervisory-level individual who is experienced in the NRC construction inspection program from a regional perspective.

2.

A Region IV representative who is knowledgeable regarding the NRC construction inspection program at the selected site.

3.

Two additional team members, either NRC personnel or consultants, who are knowledgeable regarding the NRC construction inspection program.

BASIC PROGRAM INFORMATION Prior to beginning the detailed review of the NRC construction inspection program at the selected site, the review group should obtain copies of or access to the following information:

1.

766 System data for the selected plant, including inspection module status information, inspection hours expended per module, and violations cited.

j 2.

The inspection program completion status reports required by Inspection Procedure 94300.

i

.;-~

.3 q:<%

j; y

5 i

42-k 3.

The Region IV Open Items Lists for the selected plant,' which should -

include violaticns,iunresolved items, bulletins, construction l*

deficiency reports.pgr 50.55(e),.and Part~21 reports.

4.

Any special te m' inspection ~ reports, such as CAT and IDI reports, and the associated assessments and responses.

Tis 3

Y t

5^.

'The applic,able yearly IE asse sments of regional implementation of j-the inspection program, and the regional responses.

9,,'

g

,V 6.

SALP reports prepared by Regian IV for the constre. tion ~ phase at-i# '

the selected plant.

/

'N

-7.

The~ applicable Region'IV program plans and resource utilization reports.

8.

Access to all NRC inspection reports for_the selected plant, as required for verification sampling.

-ASSESSMENT OF INFORMATION The review group activities involved in assessment'of inspection program data for the selected plant and, in some cases, comparison of that information with data for_other plants, include the following:

(

1.

Comparison of the module completion status reported in the 766 System with the completion status shown in the IP 94300 reports and in regional files and data sources other than the 766 System.

2.

Comparison of inspection hours reported in the 766 System for specific construction inspection areas with inspection hours expended in each construction inspection area at other plants, both in Region IV'and in other regions.

a 3.

Verification, for a general sampling of inspection modules, that j

the effort described in the inspection reports supports the status i

reported for the inspection modules.

Special emphasis should be placed on areas where the reported inspection hours are low.

A plant-specific listing of the inspection criteria and attributes

~

i i

contained in the NRC construction inspection program modules would be j

used for this verification review.

4.

Comparison of assessment conclusions and SALP ratings for the

~

selected plant with applicable Region IV program plans, resource utilization reports, and actual inspection effort, to determine whether the construction inspection program adequately emphasized j

increased inspection of problem areas.

5.

Selection of a representative sample :from the Open Items List',

including examples of violations, unresolved items, bulletins, construction deficiency reports, and.Part 21 reports, and-verification, by review of inspection reports, that the selected i

open items were properly closed out.

i a,

i

6 ASSESSMENT SCHEDULE Completion of the assessment described above will require approximately eleven weeks, from initiation to final issuance of the assessment report. The time would be spent as follows:

1.

Twa weeks of in-office activity to gather the basic program information and to prepare the plant-specific inspection criteria.

2.

Two weeks at the regional office and the selected site for detailed review of reports and discussions with inspection personnel.

3.

Four weeks for compilation and comparison of data, development of conclusions, and preparation of the final report.

4.

Three weeks for NRC management review.

o O

-