ML20214W082

From kanterella
Jump to navigation Jump to search
Forwards Proposed Schedules for Completion of Licensing Items,Including Listing of License Amend Requests & Other NRC-related Submittals.Fourteen License Amends/Exemption or Relief Requests Granted by NRC During 1986
ML20214W082
Person / Time
Site: Farley  
Issue date: 06/05/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8706150075
Download: ML20214W082 (7)


Text

_

i

~ * ~

Atbima Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 20 ail"Coent Alabama Power tre soorten etctre system 10CFR50.90 June 5,1987 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Status of Licensing Items Attached for your information are the proposed schedules for the completion of licensing items. Attachment I contains a listing of license amendment requests and Attachment 2 contains a listing of other NRC related submittals. During 1986 fourteen license amendments / exemption or relief requests were granted by the NRC. Alabama Power Company appreciates NRC efforts in this area.

If you have any questions, please advise.

Respectfully submitted, (2@'PALsw R. P. Mcdonald RPM / JAR: dst-D20 Attachments cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford wma %.

P

i ATTACHMENT 1 STATUS OF LICENSE AENOMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 12-19-86 07-24-87 64210 Potential

1. Steam Generator Tube Sleeving 05-04-87 64211 Critical FNP-1 and 2 outage item (T.S. 3/4.4.6)

FNP-2.

Four month lead time required.for sleeves.

Potential 05-04-87 08-21-87

2. Steam Generator F*, FNP critical (T.S. 3/4.4.6) outage item FNP-2.

08-25-86 09-18-87 62283 Potential

3. Steam Generator Tube Plugging 10-13-86 62284 critical Limits, FNP-1 06-02-87 outage item and 2 (T.S.

FNP-2.

Figure 2.1.-1 Additional and Section submittal 3.2.2) required due to G.L.

86-16.

10-25-85 06-30-87 60075 Required to

4. Revised Heatup and Cooldown 06-30-86 preclude S/D Curves Based 09-29-86 in November on Regulatory 1987 for l

Guide 1.99, FNP-1.

l FNP-1

(

S. Extend 06-23-87 08-11-86 08-21-87 62187 Respond to Operating 62188 NRC License questions of Expiration 02-05-87.

Date, FNP-1 and 2 (License)

Formerly TAC 05-04-87

6. Containment Purge and Vent
  1. 57452 and Operation,
  1. 57453.

FNP-1 and 2 i

(T.S. 3/4.6) l t

ATTACHMENT 1 STATUS OF LICENSE AMEN 0 MENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 01-13-87 07-14-87 64435 End of

7. ISI Reliefs for 1st 64436 10-year ISI 10-year period for Period, FNP-1 Unit 1 is and 2 12-01-87.

End of 05-27-87 12-01-87

8. ISI Reliefs for 2nd 10-year ISI 10-year period for Period, FNP-1 Unit 1 is 12-01-87.

End of 05-27-87 12-01-87

9. IST Reliefs for 2nd 10-year IST 10-year period for Period. FNP-1 Unit 1 is 12-01-87.

12-11-87

10. Administrative 06-12-87 T.S. Change, FNP-1 and 2 01-08-88
11. Deletion of 07-03-87 Fire Protection from Technical Specifications, FNP-1 and 2 01-15-88
12. Meteorological 07-17-87 Data Change, FNP-1 and 2 (T.S.6.9.1.9) 01-22-88
13. Deletion of 07-24-87 Appendix 8 of License FNP-1 and 2 (E.P.P.)

WCAP 10271 02-05-88

14. Technical 08-07-87 Specification GL 83-28 Optimization 4.5.3 Program, FNP-1 and 2 (T.S.

3/4.3) m

ATTACHMENT 1 STATUS DF LICENSE AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL

-APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS

15. Snubber Visual 09-18-87 03-18-88 Inspection Criteria Change, FNP-1 and 2 (T.S. 3/4.7.9)
16. End of Life 10-16-87 04-15-88 Cycle Moderator Temperature Co-efficient, FNP-1 and 2 (T.S. 3.1.1)
17. RHR Suction 12-01-87 06-01-88 Valve Auto Closure Inter-lock Removal, FNP-1 and 2 (T.S. 3/4.9.8) 06-15-88
18. Small Diesel 12-15-87 Generator Testing, FNP-1 and 2 (T.S.

3/4.8.1) 10-24-86 55354 Complete 12-16-85

19. GL 85-09 Rx Trip Breakers 08-01-86 55355 Action Statement and Surveillance, FNP-1 and 2 (T.S. Table 3/4.3-1) 11-05-86 61876 Complete 07-03-86
20. Increase RWST Boron 08-27-86 61877 Concentration, FNP-1 and 2 (T.S. 3.5.5, 3.5.1)

ATTACP. MENT 1 STATUS OF LICENSE AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS

21. Relief Request 11-10-86 11-17-86 63521 Complete for ISI Requirements for Loop C of RCS Piping, FNP-1
22. Fire Protection 10-18-85 12-29-86 60030 Complete
Requests, 01-27-86 60031 FNP-1 and 2 07-16-86
23. Corrected Pages 10-08-86 01-07-87 Complete for Heatup and Cooldown Curves, FNP-2
24. Snubber Visual 09-02-86 03-30-87 62811 Complete Inspection 02-09-87 62812 Criteria 02-25-87 One-time Change, 02-27-87 FNP-1 and 2 (T.S. 3/4.7.9)
25. Administrative 12-09-85 04-10-87 60355 Complete Change to Fire 02-18-86 60356 Protection and Miscellaneous Other T.S.,

FNP-1 and 2

ATTACHMENT 2

' STATUS OF OTHER NRC RELATED SUBMITTALS PROPOSED ACTUAL AFCo APCo NRC SUBMITTAL SUBMITTAL TAC ITEM DATE DATE(S)

REMARKS

1. 10CFR50.62 AMSAC a.

Isolation Device 02-27-87 59092 Information' 59093 b.

Plant specific 12-31-87 APCo to improve date questions addressed

2. Startup Reports 03-13-87 N/A 90 days after startup a.

Unit 1, Cycle 8 N/A 90 days after startup b.

Unit 2, Cycle 6 02-07-88

3. Annual Report of 03-31-87 N/A 1986 report Plant Changes, FNP-1 and 2
4. FSAR Update 07-01-87 N/A N/A
5. 10-year Tendon 07-01-87 Inspection Report
6. Radial Peaking

. Factor Report N/A 60 days prior to startup a.

Unit 2, Cycle 6 09-08-87 N/A 60 days prior to startup b.

Unit 1, Cycle 9 02-18-88 Formerly TAC #44579 and

7. NUREG-0737, Item II.D.1, Upon Safety Valve Discharge completion
  1. 44580.

Piping of walkdowns and feasibility

studies, approximately 08-31-88

ATTACHMENT 2 STATUS OF OTHER NRC RELATED SUBMITTALS PROPOSED ACTUAL APCo APCo NRC SUBMITTAL SUBMITTAL TAC ITEM DATE DATE(S)

REMARKS

8. Procedures To be 44300 Generation Package determined 44301

. (PGP) Meeting with NRC

9. Monthly Status to Monthly Monthly N/A NRC Project Manager
10. CRDR Audit Response 05-14-87 l

(

(

D-20

- - _ _ _ _ _ - _ _