Forwards Description of Plans for Recirculation & RHR Sys Replacement at Peach Bottom Unit 3, Per 860320 Confirmatory Order
ML20214V223
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 05/29/1987
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20214V226 List:
References
NUDOCS 8706120028
Download: ML20214V223 (2)


Text

.

D g

2870040960 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 1215) 841 5001 JOSEPH W. G ALLASHEft

.:=l".::::7...

MAY 2 91987 Mr. Walter R. Butler, Director Docket No. 50-278 Project Directorate 1-2 Division of Reactor Projects I/II U. S. Nuclear Regulatory Conmission Attn: Doc ment Control Desk Washington, DC 20555

Dear Mr. Muller:

By Confirmatory Order Issued March 20, 1986, from D. R. Muller, USNRC to E. G. Bauer, Jr., Philadelphia Electric Cmpany, restart of Peach Bottom Unit No. 3 was authorized. The order contained a requirement for the submittal of plans for inspection and/or modification of the recirculation and other reactor coolant pressure boundary piping systems during the next refueling outage. Our decision to perform pipe replacement during the upcoming Unit 3 refueling outage was confirmed by our letter from J. W. Gallagher to D. R. Muller, USNRC dated December 22, 1986.

In accordance with the order you will find enclosed " Description of Plans for Recirculation and Residual Heat Removal Systems Piping Replacement at Peach Bottom Unit 3" dated April 28, 1987. This work will be performed during the outage scheduled to begin in mid-September 1987.

If you have any questions or require additional Information, please do not hesitate to contact us.

Sincerely, j ()M, v

PAT /pdO4148707 Attaciment Copy to:

W. R. Butler, Director W. T. Russell, Regional Administrator, USNRC, Region I T. P. Johnson, Resident inspector, USNRC, Peach Bottom 8706120028 870529 l

fDR ADOCK 05000278 PDR

t r

2870040960 Docket No. 50-278 Mr. Walter R. Butler, Director Project Directorate 1-2 Division of Reactor Projects I/II U. S. Nuclear Regulatory Comnission Attn: Docunent Control Desk Washington, DC 20555

Dear Mr. Muller:

By Confirmatory Order issued March 20, 1986, from D. R. Muller, USNRC to E. G. Bauer, Jr., Philadelphia Electric Company, restart of The order contained a Peach Bottom Unit No. 3 was authorized.

requirement for the submittal of plans for Inspection and/or modification of the recirculation and other reactor coolant pressure boundary piping Our decision to perform systems during the next refueling outage.

pipe replacement during the upcoming unit 3 refueling outage was confirmed by our letter from J. W. Gallagher to D. R. Muller, USNRC dated December 22, 1986.

In accordance with the order you will find enclosed " Description of Plans for Recirculation and Residual Heat Removat Systems Piping Replacement at Peach Bottom Unit 3" dated April 28, 1987. This work will be performed during the outage scheduled to begin in mid-September 1987.

If you have any questions or require additional Infonnation, please do not hesitate to contact us.

Sincerely,

$ 'p\\ 1

/

Original signed by J.W. Gallagher y

PAT /pdO4148707Y Attactynent b, )

W. R. Butler, Director Co to:

f W. T. Russell, Regional Administrator, USNRC, Region I q9 T. P. Johnson, Resident inspector, USNRC, Peach Bottom E. J. Bradley bcc:

J. S. Kemper S. J. Kowalski R. S. Fleischmann, 11 G. M. Leitch R. H. Logue W. M. Alden M. J. Cooney L. B. Pyrlh A. P. Bazzant J. M. Madara, Jr.

F. A. Cook R. A. Mulford P. A. Tutton DAC (NG-8)

D. R. Helwig F. J. Coyle

._