ML20214V042

From kanterella
Jump to navigation Jump to search
Corrects Info Provided in 860618,0730 & 0815 Ltrs Re Shift Engineer/Licensed Operator Hot Participation Experience Resumes.Practical Factors Lacking for P Smith & R Schorie Listed
ML20214V042
Person / Time
Site: Braidwood  
Issue date: 09/19/1986
From: Miosi A
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2135K, NUDOCS 8610020117
Download: ML20214V042 (2)


Text

.. m

) Commonwealth Edison 72 West Adams Street, Chicago, il4nois ddiess Reply to: Post Office iToH67~

s(-

Chicago, tilinois 60690 - 0767 September 19, 1986 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulatory Washington, DC. 20555

Subject:

Braidwood Station Units 1 & 2 Braidwood Licensed Operator Hot Participation Experience Resumes NRC Docket Nos. 50-456 and 50-457

References:

(a)

June 18, 1986 A.D. Miosi letter to H.R. Denton (b)

July 30, 1986 A.D. Miosi letter to H.R. Denton (c)

August 15, 1936 A.D. Miosi letter to H.R. Denton

Dear Mr. Denton:

The purpose of this letter is to correct information that was provided in the referenced letters.

Two of Braidwood's Shift Engineers have been found to be lacking certain portions of the 6 month Hot Participation Program.

Previously, we had reported that these personnel had completed their 6 month program.

It is true that they actually completed 6 months of on-shift observation at Zion Station, the fact that not all of their required practical factors had been completed during the program was overlooked.

The practical factors that are lacking are as follows:

l Paul Smith---------------Cold Shutdown to Hot Shutdown Rick Schorie-------------Cold Shutdown to Hot Shutdown Eot Shutdown to Hot Standby Subcritical to Critical Critical to 2% Power Our current plans are to send Messrs. Smith and Schorie to Catawba Unit 1 to observe the upcoming plant heatup and startup which is expected to start October 1, 1986.

When this activity is completed, we shall notify your office.

8610020117 860919 PDR ADOCK 05000456 V

PDR 0

2-4 Should you have any questions concerning this matter please contact this office.

Very truly yours, Q

A. D.

Miosi Nuclear Licensing Administrator

/klj cc:

J.

Stevens 2135K i

{

1 I

-.. _... _ _. _ _ _, _ _ _.,.