|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled ML20126J3941992-12-30030 December 1992 Notification of Significant Licensee Meeting W/Util on 930114 to Discuss Licensee QA Program Initiatives 1999-09-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20195J8301999-06-18018 June 1999 Staff Requirements Memo Re 990618 Affirmation Session for SECY-99-133, Final Rev to 10CFR50.65 to Require Licensees to Perform Assessments Before Performing Maint & SECY-99-145 Re Antitrust Issues for Wolf Creek Unit 1 ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives 1999-09-08
[Table view] |
Text
{{#Wiki_filter:. .
4 - 7 '* - 4 ' '2 }
d**4.( UNITED 3TATES y ...
. NUCLEAR REGULATORY COMMISSION
/ d* . REGION IV
$11 R FAN PLAZA DRIVE. SUITE 1000 S,
[8 ARLINGTON. TEXAS 76011 1
MAR 2 71984 MEMORANDUM FOR: T. Westerman, Enforcement Officer THRU: R. Hall, Chief, Technical Program Branch FROM: J. Kelly, Chief, Physical Security Section l
SUBJECT:
ALLEGATION 4-84-A WOLFCREEK On February 14,1984 Scott Schum reported that a worker onsite at Wolf Creek had reported to him that he had infonnation about a plan to sabotage a new fuel shipment when it is sent to Wolf Creek. Such matters are covered under the Atomic Energy Act as being within the investigative jurisdiction of the Federal Bureau of Investigation (FBI). Within NRC, the matter was referred to me as the region's Incident Analysis Team member. After a discussion with Section Chief, Mr. Bill Johnson of Region IV; Mr. Doug Kunzie of NMSS (Acting 1AT g]. coordinator); and notifying you, th in Kansas City, Missouri, ffi was notifitied by me. I spoke with Supervisory Agent, who took the information ar said he wou d determine whi h resident agent would be assigned. A of the Wichita office was named. On the 27th of rua af r receiving no response from the Wichita office, I called there.
. returned the call and af ter being briefed by me, conunitted to ollowup.
y On March 9, 1984, was visited by an agent, from the To eka Kansas, resident office of the FB . The agent interviewe l
l The licensee has been notified and we plan no further action at this time unless new information in forthcoming.
L 9
dh i.A J. Kelly, Chief Physical Security Section t
N '
\
N 8612090414 861203 PDR FOIA STEPHEN 95-594 PDR 7- 3
s- T. w'-N4*suuum w y-e a ea
G
(
$' b/ k h.-{
36 (-- 16 0
._ # ~~__ I W x)
GC' S S (t( g(
O
(. (,% Q - m{- c: z,- A c: GO
" J LMcc- c ew O4
- g. gD s
's,
-~
- Lf
~
JJ s'.{ y) . } :
ON REVIEW f '
h3fggMW, 9'" '
u~
pa , ,du
,;g-sW, rta<W fs f d' fp he e DS g pf :t FBI N Th - El O b C-.___.
p b l
/ ,
REPORT PRLFAnrutun A5515T DETAILS: Report of potential threat to Fuel Shipments.
s s
'J .5 ms
it >, si Il -l ',
O
9 e
M
. p ...e L.***.*
W "% %
O hW bl l___
1 p ,9, '74/- / 94 (
l u
i
.1
0 J - la L: ll. 3 9
A August 20, 1985 nucear oworeness networc B473 massachusetts . burence, kansas 66044 .(913)749-164 0 Director Office of Administration US IIuclear Regulatory Comr.ission F OF INF:2,aAg Washington, D.C. 20555 s Ri.qcs r -
FREEDOM OF INFORMATION ACT REQUEST Fork-1S~-rya f To Whom It May concern: Gwd 2-a Nr Pursuant to the Freedom of Infornation Act. U.S.C. 522, as amended, the Nuclear Awa reness ';etwork request s the following documents regarding the Wolf Creek Nuclear Generating Plant.
Please consider " documents" to include reports, studies, test results, correspondence, menoranda, ~.eeting notes, i.eeting minutes, working papers, graphs, charts, diagrams, notes and summaries of conversations and interviews, computer records, and any other forms of written comnunication, including inter-nal NRC staff menorands. The documents are specifically re-quested from, but not limited to, the following offices of the ::RC: Office of Analysis and Evaluation of Operational Data (AEOD); Office of :;uclear Reactor Research (NPR); Office of '!uclear Regulat ory Research (Research); Office of Inspection and Fnforcenent (I&E); Office of Investigations (OI); Generic Issues Branch of the Division of Safety Technology, and the Operating Reactors Branches of the Division of Licensing.
In your response, pJease identify which documents correspond to which requests below.
Fursuant to this request, picace provide all dccunents prepared or utilized by, in the possession of, or routed through the NRC related to the Wolf Creek Nuclear Generating Plant:
The following request includes any and all documentation pertaining to each and every case that has arisen at Wolf Creek Generating Station in the following areas:
- 1) Any and all Allegation Data Forms (example attached),
- 2) Any and all Allegation Review Forms (example attached),
- 3) Any and all supporting Documentation Lists (example attached),
- 4) Any and all supporting or related documents for each & every case,
- 5) Any and all supporting or related documents for closure of each and every case.
2ap.
, h /,- \
y y ci f'
I l
_2_
If any of the material covered by this request has been des-troyed and/or removed, please provide all surrounding docu-mentation, includir.g but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the actions.
For any documents or portions that you deny due to a specific FOIA exe:tption, please provide an incox itemizing and deceribing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exeruption is rele-vant to the document or portion of the document withheld. This index is required under Vauchn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Sincerely, f//
;, -0 L^~ f L hLW Stevi Stephens
August 20, 1985 nuceotr oujoreness netu)Or(
1347M massachusetts . burence, kansas 66044 .(913)749-1640
- atalie Brown Office of Administration US NRC Washington, D.C. 20555
Dear Natalie,
I am directing this to you since you dealt with the original
.rOIA-85-161.
part of the documents I received included some Allegation Data Forms, Allegation Review Forms and Document Lists. However, they seemed to be rather piece-meal. If possible, as an extention of the request relating to 85-161 I am requesting the supporting documents for the cases (from 161) and the supporting documents for the closure of some of those cases listed in 161:
~)
. 04-84-018 (attached)
- 2) Q4-84-042 (attached) %
- 3) 84-A-85 (att ached ) w//
- 4) 84-A-0195 (attached)
- 5) 4-84-003 (attached)
As you see, they are incomplete, and seemingly random.
j I would like any other documents pertaining to them other I than the ones 7ttached.
1 I an also sending another FOIA to your attention today because I am expanding on this request to include all cases.
) As I said, if it can be an extension of 85-161 to sand
/ further documents please do send the other information that was not included in 161. If that is not possible, then the FOIA I sent to your attention today will cover this request as well.
Thanks.
Sincerely, f3
-\ '
3
/ o^ <
ryn live Stevi Stephens}}