ML20214T792

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-1113/87-05 on 870504-08 (Ref 10CFR2.790(d) & 73.21).Violation Noted:Failure to Properly Approve Procedure Prior to Use
ML20214T792
Person / Time
Site: 07001113
Issue date: 05/29/1987
From: Earnestine Clay, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19292H341 List:
References
70-1113-87-05, 70-1113-87-5, NUDOCS 8706100425
Download: ML20214T792 (1)


Text

O F ITH -

A f sco UNITED STATES

[ 'o NUCLEAR REGULATORY COMMISSION

[" -

. REGION 11 g j 101 MARIETTA STREET.N.W.

  • ATLANTA. GEORGI A 30323

'..... JUN 021987 Report No. 70-1113/87-05 Docket No. 70-1113 License No. SNM-1097 Liter.see: General Electric Company P. O. Box 780 Wilmington, NC 28402 Date of Inspection: May 4 - 8, 1987 Inspector: e 5/2.9/87 E. L. Clay, Safeguards Engineer '

Date Signed Approved by: h '{ W E. J. McAlpine', Chief, Mate $al Control and 6[29[}7 Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards

SUMMARY

Scope: This routine, unannounced inspection was conducted at the site during normal working hours in the areas of measurements, facility organization and management controls and followup on previous enforcement matters.

Results: One licensee identified violation - failure to properly approve a-procedure prior to use was identified.

8706100425 870602 PDR ADOCK 07001113 C PDR