Text
V Ys Po(L
~
/NEA idaho National Engineering Laboratory March 27, 1987 Mr. Mayo Carrington, Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Technical Assistance Management Branch Planning and Program Analysis Staff 7920 Norfolk Avenue Bethesda, MD 20014 TRANSMITTAL OF FINAL REPORT, " TECHNICAL EVALUATION REPORT, PUMP AND VALVE INSERVICE TESTING PROGRAM, PILGRIM NUCLEAR POWER STATION", (FIN A6812),
EGG-NTA-7508, MARCH 1987 - Oben-42-87 Ref: NRC Form 189, " Review of Pump and Valve Inservice Testing Programs for Operating Plants (III)", (FIN A6812)
Dear Mr. Carrington:
The subject report is transmitted in fulfillment of the Pilgrim Nuclear Power Station IST program review identified in the referenced 189. This work is being conducted under the technical direction of Mr. Horace Shaw of the Office of Nuclear Reactor Regulation, Mechanical Engineering Section of the Division of BWR Licensing.
This report documents our review of the Inservice Testing Program submitted by the Boston Edison Company for the Pilgrim Nuclear Power Station and concludes that, with the exceptions noted therein, the proposed program is in accordance with the established Nuclear Regulatory Commission requirements.
Very truly yours, N'W' h A
hD D
50 93 C. F. Obench(ain, Manager l
PDR p
Enclosure:
As Stated cc:
G. L. Jones, DOE-ID R. G. LaGrange, NRR/BWEB H. K. Shaw, NRR/BWEB J. O. Zane, EG&G Idaho (w/o Enclosure) 1 hEGnG,o,.,ne.
P.O. Box 162S Idaho Falls, ID 83415 L
)