ML20214R918
| ML20214R918 | |
| Person / Time | |
|---|---|
| Issue date: | 07/15/1986 |
| From: | Rich Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Themelis J ENERGY, DEPT. OF |
| References | |
| REF-WM-39 NUDOCS 8612080137 | |
| Download: ML20214R918 (1) | |
Text
DISTRIBUTION UBE0.s/f. URL 6 URF0 r/f URL6/HDR/86M
[
os PGarcia T01sen
- 86 JL 21 P12:26 RGonzales Jllt 15 MM; SGrace RBrich DGillen, NMSS~
LLW Branch, WMLU URF0:HDR URF0rjf URL 6 WM Record file WM Project d7 Mr. John G. Themelis Dockt No. _ __ __
U.S. Department of Energy PDR.__ W D R _ __ __
Albuquerque Operations Office DistrP r O
Aifu2TraeTNewMexico EaAF Wriz Esc--
87115
_ _j
Dear Mr. Themelis:
@eturnlo WR 623-SS) _
As this material is sufficiently covered in the new Technical Approach Document (TAD), the NRC is in agreement with your June 20, 1986 proposal to eliminate the discussion of standard methodology in the Engineering and Hydrological Calculation Summaries of each Remedial Action Plan (RAP).
NRC reviewers will continue to rely on the full set of calculations by the TAC for conceptual design and the RAC for final design for confirmation that standard methodology follows the TAD.
Sincerely, lsf O
R. Dale Smith, Director Uranium Recovery Field Office Region IV
'i 8612080137 860715 PDR WASTE PDR WM-39 JY OFC : URF0
- URF0
- URF0
- NMSS W
NAME : g jy
- EHawkins
- RDSmith
- DGillen
______:____________:____________.____[_,._____.____________.____________.___________
5 7
g :1 i
((L
.DATE :86/0