ML20214R593

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 2 ,to Lease/Purchase of GE Black Fox BWR/6 Simulator. Contractor:Ge
ML20214R593
Person / Time
Issue date: 02/06/1987
From: Fields J
NRC
To: Blaha J, Roessler S
NRC, NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20214R595 List:
References
CON-FIN-B-8754, CON-NRC-05-86-169, CON-NRC-5-86-169 NUDOCS 8706080212
Download: ML20214R593 (1)


Text

'

k) hg]*

%Rp CON TR ACT NUweE R NZC PORM 255 (10-76) fiRC-05-86-169 DIVISION OF CONTR ACTS MODIFIC ATION NUMBE R U S NUCLE AR REGULATORY CGMMISSION WASHINGTON, O C, 20555 O NEW Il M00lFICATION Of HE R (Soeco!ye i

NOTIFICATION OF CONTRACT EXECUTION CONTR ACT sASEO ON.

James L. Blaha, Director TO:

AUTHOR 12 ATION NUMBE R (r,ri,p Program Support and Analysis Staff IE-86-169 Office Of Inspection and Enforcement DATE 10resnantoon) 7/23/86 and 11/25/86 1

1 h

CONTRACT CH ANGES PER THIS ACTION p

A

' (detej U v// IContract Soccostanti Revise contract scope Of I

Joyce Fields work and add funds.

Contract Administrator Contract Administration Branch l

OlVISION OF CONTRACTS, ARM CONiR ACTOR INJw & Lorat oni ENECUTION oATE General Electric Company 2/6/87 fluclear Energy Business Operations nPE Or C NTRACT 22 Technology Park florcross, GA 30092 FFP PROJECT fif LE PERIOD OF PERFORMANCE Lease / Purchase of the General Electric :

10/11/85 - 10/10/89 Black Fox BWR/6 Simulator PRiNC6 PAL INVE5 flG ATOR tom Averitt NRC AUTHOR 12ED REPRESENT AflVE Steve Roessler 04RNUMBER FIN NUM8ER fi/A fl/A AMOUNT NEW NRC FUNDS s

50,626.00 FUNDING TOTAL FY81 FUNDING s

50,626.00 TOTAL NAC O8 LIGATIONS

$ 965,626.00 8.8)V( Hfe'M N f PHQP( H f y Af T ACHVENfl$)

CON T R AC T DOCUME N T I

. io d""" #

8706080212 870206 1

PDR CONTR NRC-05-86-169 PDR I