ML20214R449

From kanterella
Jump to navigation Jump to search
Cooperative Agreement: Maint & Operation of Lpdr, Awarded to Pennsville Public Library
ML20214R449
Person / Time
Issue date: 06/01/1987
From: Blocksom R, Niemeyer E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), PENNSVILLE, NJ
To:
Shared Package
ML20214R442 List:
References
CON-NRC-10-87-339 NUDOCS 8706080143
Download: ML20214R449 (19)


Text

-

W-U. S. NUCLEAR REGULAiOR) COMMISSION NOTICE OF COOPERATIVE AGREEMENT

l. COOPERATIVE AGREEMENT GU!iSER 2. M3DIFICATION NUMBER 3. COOPER IVE AGREEt NRC-10-8 7-3 3 9 FROM: T0: Oh
4. AUTHORITY Section 3Ia and 5. TYPE OF AWARD 6.000PERATOR TYPE 141b of Atomic Energy Act of 1954, as amended. Public Library Cooperative Agreement

.CGOPERATOR NAME AND ADDRESS 8. PROJECT TITLE Pennsv111e Public Library 190 S. Broadway " Maintenance and Operation of The Pennsville, ILT 08070 Local Public Document Room (LPDR)"

9. PROJECT WILL BE CONDUCTED PER 10. TECHNICAL REPORTS ARE REQUIRED COOPERATOR'S PROPOSAL (S)

PROGRESS AND FINAL DATED AND FINAL ONLY APPENDIX A - PROJECT COOPERATIVE AGREEf1ENT OTHER PROVISIONS

~

11. PRINCIPAL INVESTIGATOR (S) NAME AND 12. NRC PROGRAM 0FFICE (NAME AND ADDRESS)

ADDRESS U.S. Nuclear Regulatory Commission LPDR Branch-ATTN: Jona L. Souder, Chie-Same as 12 Divisio.1 of Rules & Records Office of Adm., Wash., DC 20555 Tolnnhgno Mg (ROO) 638_80A1

13. ACCOUNTING A J APPROPRI ATION DATA 14. METHOD OF PAYMENT B&R No.- 46-20-25-302 ADVANCE BY TREASURY CHECK

' X REIMBURSEMENT BY TREASURY pyg. CHECK LETTER OF CREDIT APPN: 3tx0200.407 OTHER (SPECIFY)

15. FUNDING SOURCES 5

SOURCE AMOUNT NRC:

THIS COOPERATIVE $ 2,330.00 (4 quarters at $570.00 plus $50.00 miscellaneous expense AGP,EEMENT PREVIOUSLY o OBLIGATED $

COOPERATOR SHARE:

0 THIS COOPERATIVE $

, AGREEfiENT PRIOR COOPERATIVE $ 0 l AGREEMENT TOTAL FUNDING $ $2,330.00 1

16. AMOUNT OBLIGATED BY THIS COOPERATIVE $

AGREEMENT ACTION: 8706080143 870601 PDR CONTR NRC-10-87-339 PDR

. . r m . 4 * *P '

17. !RC ISSU!!iG Of flCE (it/,tX IJ:D ADUNESS)

U.S. Nuclear Regulatory Comnission Division of Contracts /0ffice of Administration Washington. DC 20555

18. C00PERATOR 19. HRC GRANT Of f1CER 7J d 7 leme ~ [ 'I (Signature) (date) (Siunaturel NAME.(TYPED) Richard Blocksom TlTLE Director TELEPHONE NO. (609) 678-5473 TELEPH014E NO. ('301)4923570 ,
20. COOPERATIVE AGREEMENT PAYMENT INFORMATION

. Payment will be made within thirty (30') days after receipt of the hilling unless the billing is . improper or the cooperator. has failed to comply with the program objectives, cooperative agreement award conditions, Federal reporting reauirements or other conditions specified in OMB Circular A-102/A-110, whichever is applicable.

Payment will be made by:

~'

U. S. Nuclear Regulatory Commission - -

Or, rice of Resource l'anagement Division of Accounting and Finance, ATTN GOV /COM ACCOUNTS Washington, DC 20555 Vouchers should be submitted in an original and one (1) copy to' the above address, on Form #270 " Request for Advance or Reimbursement" (copy attached).

21. ~ Attached is a copy of the "NRC. Project- Cooperative Agreement Provisions for Institutions of-Higher Education and Other Nonprofit Organizations and ' State / Local Governments." Acceptance of these terms'and conditions is ackn.owledged when . federal funds are used on this cooperative agreement project. ~
72. ORDER OF PRECEDENCE in the event of a conflict between the cooperator's proposal and this Notice of Cooperative Agreement Award, the terms of the Notice of Cooperative Agreement Award shall prevail .
23. By this Cooperative Agreement Award, the cooperator certifies that payment of any audit-related debt will not reduce the level of performance of any federal Program.

r .

f c... .- .?. .

STATEENT OF WORK 1

COOPERATIVE AGREEMENT (LPDR)

1. BACKGROUND The Local Public Document Room Branch within the Division of Rules and Records, Office of Administration U. S. Nuclear Regulatory Comission (NRC), is responsible for the overall establishment and maintenance of localpublicdocumentrooms(LPDRs). The LPDR Branch recomends, ,

develops, and implements programs, plans, objectives, and activities of j local public document rooms, as well as coordinates the distribution of i documents to LPDRs. ,

The LPDR program provides scientific and technical information relatino to l nuclear power plants. The document collections pemit and encourage the  :

free exchange of ideas and criticisms by the general public in the licensing of nuclear power plant construction and operation. The LPDRs are located in libraries maintained by state / local covernments, institutions of hi the " Cooperator")ingher education the vicinity and nonprofit of proposed oroanizations nuclear power plants. (hereinafter, The LPDR Branch has established a cooperative agreement program to provide financial remuneration for services perfomed by the LPDRs and to insure that a uniform program of document maintenance and information services is provided for LPDR patrons.

2. PERIOD OF PERFORMANCE
a. The period of perfomance hereu1 der shall commence on 9 1 39 and shall continue through (, 3ol %T , unless scener I

terminated on extended.

b. The Cooperator and the NRC, by mutual agreement, may extend the period of perfomance through the execution of supplemental agreements to this cooperative agreement, not to exceed a total of five (5) years. At the end of each year the Cooperator will be required to submit a cost proposal to the NRC for the following year.
3. NRC RESPONSIBILITY The NRC anticipates that they will provide documents on a weekly basis to ,

be added to each local public document room collection (collection). NRC  !

will provide file folders, binders, labels, postcards for reportina  !

rissing documents, envelopes for use in communicating with NRC, a User's l Guide, filing and document retention instructions, etc. Also, the NRC, I when notified by a library, will promptly replace any documents found )

missing from the collection. NRC will periodically visit each libr ry to i review the collection, provide guidance and instructions to the library staff, monitor contractor perfomance, and identify /rcsolve problems er discrepncies.

Incorporate into resultant Cooperative Agreerrent.

) - . .-- - -. _

1

, , (

i

e. '...

7 l l

4. MAINTENANCE AND OPERATION 0F THE LPDR The Cooperator shall perform the following services relative to' the ,

maintenance and operation of the LPOR: <

a. Properly file paper copy documents or microfiche received from NRC within one week of receipt in accordance with the filing system provided by NRC. To meet the particular needs of library patrons, this filing deadline may be extended upon the expressed approval of the Program Officer,
b. Pefile docunents or microfiche used by patrons within the next business day,
c. Prepare file folders and folder labels when necessary.
d. Promptly file as well as display reference tools and finding aids provided by NRC (such as the LPDR HOTLINE toll free labels and signs which identify the collection) as instructed.
e. Maintain a file of explanatory and instructional material sent to the LPDR library by the NRC.
f. Documents in the collection are not allowed to leave the LPDR library unless instructed to do so by the LPDR Branch, NRC.
9 Vork with the LPDR Branch staff and other NRC representatives, as necessary, to answer questions and provide information en the availability of documents and services, return documents sent in error, make arrangements for handling non-routine matters as they arise, such as Freedom of Information Act responses.
h. Maintain the local public document room collection and NRC-furnishr.d equipment as a physically unified collection.
1. Report promptly to the Program Officer the identification of docunents found or reported to be missing from the collection.
5. USER ASSISTANCE
a. Provides patrons with reference assistance in locating documents and ]

sufficient instructions to familiarize users with the filing system, the local public document room collection, the collection's reference  !

tools and finding aids, the indexing system used for paper copies and microfiche copies of the collection, and use of the microfiche reader printer.

I

r. . q
  • 51 -

y>- ~y' I

b! I 4.- . . a p- n

. . ..s.

4 l

l

, , t  !

b. Provide users access to operable reproduction equipment for making paper copies of .the co11ection, as needed.

L 1 .

5. ADMINISTRATIVE SERVICES;
a. Insure that'the'NRC microfiche reader printer is in good operating condition. In the event the equipment requires repair or servicing, the librarf staff shall arrange to have an authorized service 4

representative rspair orcservice the equipment. The invoice of charges should be forwarded for payment to the NRC in accordance with the instructient. in USNRC LPDR 8 ranch kewsletter entitled "LPDR UPDATE"(ATTACHMENT 1). A copy of the/sioned work order should be

, submitted with the quarterly report and advance / reimbursement Form 1270.

If the cosi estimate' exceeds $200.00, the Coooerator staff shall first contact the Program Officer by calling the toll free number 800-638-8081.

!' b. Promptly inform the LPDR Branch of the NRC, either by the toll free telephone number (800-638-8081) or in writing, of problems regarding 4

the use or maintenance of the collection.

c. As the need arises; the Cooperator shall acquire necessary miscellaneous office supplies (storage boxes, hole punches, etc.) for performance of the' work required under this cocoerative agreement.

~. Approval of the NFC Prog' ram Officer is required prior to purchase of these supplies. ' Payment should be requested on the next quarterly i advance / reimbursement Fonn #270. ~ Receipts for the supplies must ,

accompany Form #270. Charges for paper and lamps for the NRC l microfiche reader printer are not allowable exper.ditures and will not ^

/

be rein-Sursed.

7. SPACE REQUIREMENTS Provide the fc110 wing:  !
a. Adequate shelf or other filino space to maintsir the local public document collecticn.
b. Adequate space near the dccument collection tc ltcate a microfiche reader printer, a table for the reader printer, a microfiche file cabinet (s), and table and chairs for patrons using the collection.
c. Adequate reading space, lighting, heating and cooling, for users to review the documents in the collection.

r f (..

,i.

l

8. _ SUPPLY REQUIREMENTS  !

1 a.

Maintain adequate supply of paper for the microfiche reader printer, b.

Maintain printer. adequate supply of electric lamps for the microfiche reader

9. GOVERNMENT FURNISHED PROPERTY The following support items are to be furnished to the Cooperator, as needed, to the collection.
i
a. l

. 3M "800" microfiche reader printerNRC Tag No. o 149 4V , Model 520125, (1 ea.)

b.

Vertical visible upright cabinet for cards and microfiche, 4x6 size, 7-drawers, 40" high,16" wide, 27" deep, with high leg base, steel, 12" high, Shaw-Walker, Model C-1419. (_ l ea.)

c.

Reader printer sit-down stand, 30" high, top 36" x 30", Bell &

Howell, Catalog No. 123002. (1ea.)

For newly established LPORS or LPDRS receiving a microfiche reader printer for the first time, the NRC will provide the initial box of paper and an extra lamp for the microfiche reader printer.

. to maintain an adequate supply of paper and electric lamps rests with theThe Cooperator. (Paper: 3M Dry Silver Paper, Type 795 81/2 x 250, 4~ rolls

. per carton; Lamps: 3M, Order No. 78-8012-3601-5.) ,NRC authorizes the Cooperator to charge fcr cop (g$ made on the reader printer, to recoup expenses fcr paper and lamps.

The Cooperator is authcrized, without cost to NPC, tc install a coin operated attachment to the reader printer; however, the cost a Cooperator ,

may charge for copies from microfiche may not exceed 1 require a higher per-page cost.

10. REPORTING REQUIREMENTS
a. Performance Reports A quarterly perfonnance report, utilizing the fr.rtnat as. specified in l i

Attachment 2 shall bt submitted within 20 days after each quarter's end to the addressees listed below.

is requested the quarterly advance /reimbursementFor administrative purpose Form #270) be submitted simultaneously with this performance rep (ort, along with an 1 receipts for miscellaneous supplies and signed work orders covering _

Incorporate into resultant Cooperative Agreement.

-N - - . - .

s .

( [ - - . .

i 1

repairs or servicing of NRC furnished microfiche reader printer.

However, for Cooperators who qualify for advance payment, the first quarterly report will be submitted with Form #270 for payment of second quarter.

U.S. Nuclear Regulatory Commission ATTN: Jona L. Souder, Chief Local Public Document Room Branch Division of Rules & Records Office of Administration Washington, DC 20555 U.S. Nuclear Regulatory Comission Small Purchases & Regional Operations Branch Division of Contracts Office of Administration Washington, DC 20555 U.S. Nuclear Regulatory Comission Division of Accounting & Finance ATTN: GOV /COM Accounts Section Office of Resource Management Washington, DC 20555

b. Financial Reports In accordance with OMB Circulars A-110. Attachment G and/or A-102, Attachment H, as applicable, the Cooperator shall use the Standardized Financial Status Report to report the status of funds for all nonconstruction projects or programs. Please note the NRC will exercise the option to waive the filing of the Standardized Financial Status Report since the Request for Advance or Reimbursement and/or. Report of Federal Cash Transactions has been determined to provide adequate information, except that a final Financial Status Report shall be required at the completion of th+

project when the Request for Advance or Reimbursenent form is used only for advances.

l l

1

(

APPENDIX A NRC PROJECT COOPERATIVE AGREEMENT PROVISIONS FOR STATE AND LOCAL GOVERNMENTS / NONPROFIT ORGANIZATIONS /

EDUCATIONAL INSTITUTIONS This cooperative agreement is subject to the following provisions:

l

1. Definitions
a. The tem " grant officer" means the person executing this cooperative agreement on behalf of the Government and includes his successors or any duly authorized representative of any such person,
b. The term " cooperator" means the party entering into this cooperative agreement with the U.S. Nuclear Regulatory Comission (NRC).
c. The tem " program officer" means the person in NRC Headquarters who ,.

is responsible for the technical aspects of this cooperative agreement. I

d. The tem " Circular A-102" refers to Office of Management 8 Budget Circular A-102 (Revised), Unifom Requirements for Assistance to State and Local Governments (January 1981),
e. The term " Circular A-87" refers to Office of Management 8 Budnet

- Circular A-87, Cost Principles for State and Local Governments (January 28,1981).

f. The term " Circular A-110" refers to Office of Management & Budoet Circular A-110. Unifom Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Nonprofit Organizations (July 30,1976).
g. The term " Circular A-21" refers to Office of Management & Budget

. Circular A-21 (Revised), Cost Principles for Educational Institutions (Februa ry 26,1979) and A-21 (Revised) Transmittal Memorandum No. 2, Cost Principles for Educational Institutions (June 4,1986).

h. The tem " Circular A-122" refers to Office of Management & Budget Circular A-122, Cost Principles for Nonprofit Organizations (July 8, 1980).
2. General
a. This cooperative agreement is composed of a cooperative agreement face page (which may incorporate the Cooperator's proposal by reference) and the NRC Project Cooperative Agreement Provisions for State and Local governments / Nonprofit Organizations / Educational Institutions.

, -- ,r,- - ++, - - - ,-

F-

. . ( (

2 I

b. This award constitutes acceptance by the NRC of the Cooperator's proposal and budget unless otherwise indicated on the face page,
c. The Cooperator is obligated to conduct such project oversight as may be appropriate, to manage the funds with prudence, and to comply with the provisions outlined herein. Within this framework, the Principal Investigator (PI)namedonthecooperativeagreementfacepageis  ;

responsible for the scientific or technical direction of the project j and for preparation of the project performance reports. ,

d. This cooperative agreenent is funded on a cost reimbursenent basis ,

not to exceed the amount awarded as indicated on the face page and is i subject to a refund of unexpended funds to NRC. l l

e. This cooperative agreement award is subject to the Uniform Administrative Requirements & Cost Principles of the following applicable Office of Management and Budget (0MB) Circulars which are hereby incorporated by reference as though fully set forth herein. A copy of these circulars are hereby attached for your reference.

A-102 (Revised) " Uniform Recuirements for Assistance to State and Local Governments" (January 1981)

A-87 " Cost Principles for State and Local Goverr.ments" g (January 28,1981)

A-110 "Unifom Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Nonprofit Organizations" (July 30,1976)

A-21 (Revised) " Cost Principles for Educational Institutions" (February 26,1979)andA-21'(Revised) Transmittal Memorandum No. 2 " Cost Principles for Educational e Institutions"(June 4,1986)

A-122 " Cost Principles for Nonprofit Organizations" (July 8, 1980)

3. Reporting Program Technical Perfomance i

Cooperator is responsible for the perfomance under this cooperative agreement and other agreements and, where appropriate, ensures that time schedules are being met, projected work units by time periods are being accomplished, and other perfomance goals are being achieved.

4 Suspens,icn e." Termir.ition for Cause

a. When, in the opinion of NRC, a Cooperator has failed to comply with the terms and conditions of a cooperative agreement, NRC ,

may (1) suspend the cooperative agreement or (2) terminate the

.--1 _

. '. :. . - ( (

cooperative agreement for cause, in accordance with OMB Circulars -

A-102 Attachment L and/or A-110. Attachment L as applicable,

b. NRC prefers that deficiencies be corrected whenever practicable.

When it is believed that a Cooperator has failed to comply with one.

or more of the terms and conditions of a cooperative agreement, the Grant Officer will advise the Cooperator by letter of the nature of the problem and that failure to correct the deficiency may result in suspension or termination of the cooperative agreement. The Cooperator will be requested to respond in writing within 30 days of receipt of such letter, describing the action taken or the plan designed to correct the deficiency. Copies of such correspondence will be furnished to the Principal Investigator (PI) and to the NRC Program Officer. If a satisfactory response is not received within 30 days of, receipt of such a letter, the Grant Officer may issue a notice suspending authority to further oblicate cooperative agreement funds, in whole or in part. The notice of suspension will be sent by certified mail (return receipt requested) to the Cooperator with a copy to the Pl. The notice will set forth the activities covered by the suspension and its effective date, and the corrective action.

required by the Cooperator in order to lift the suspension. However, this policy does not preclude insnediate suspension or termination when such action is reasonable under the circumstances and necessary to protect the interests of the Government.

c. If a cooperative agreement is suspended pursuant to this article, no obligations incurred by the Cooperator during the period of suspension will be allowable under the suspended cooperative agreement other than necessary and proper costs that the Cooperator could not reasonably avoid during the period of suspension; provided that such costs would othenvise be allowable under. the applicable i Federal cost principles. '
d. The suspension will remain in effect for a maximum of 90 days during which time the Cooperator will take corrective action to the satisfaction of NRC or give assurances satisfactory to NP.C that corrective action will be taken. In that event, the Grant Officer will issue a notification, to the Cooperator, that the suspension is lifted.
e. In the event the deficiency is not corrected to the satisfaction of NRC, the Grant Officer may issue a notice of temination. The notice will state the reason (s) for the termination and its effective date. The effective date shall reflect the fact that NRC may require a minimum of ninety (90) days to relocate the document collection,
f. If a cooperative agreement is terminated pursuant to this article, financial obligations incurred by the Cooperator prior to the

)

I. ~ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ . - ~ . _ _ . _ _ _ - . _ _ . _ _ _ _

( 3 effective date of temination shall be allowable to the extent they would have been allowable had the cooperative agreement not bern teminated, except that no oblication incurred durino the period in which the cooperative agreement was suspended (except those allowed pursuant to c., above) will be allowed. The settlement of temination costs will be in accordance with the applicable Federal cost principles.

9 Within ninety (90) days of the effective date of termination, the Cooperator will furnish an itemized accounting of funds expended for allowable costs prior to the effective date of temination and the unexpended cooperative agreement balance.

5. Termination for Convenience
a. Circumstances may arise in which either NRC or the Cooperator wishes to teminate the cooperative agreement in whole or in part. If both parties agree, the cooperative agreement may be terminated by mutual agreement, in accordance with OMB Circulars A-102. Attachment L and/or A-110. Attachment L, as applicable.
b. If the Cooperator wishes to terminate the cooperative acreement, he/she shall advise the NRC Grant Officer, in writing, with a copy to the cognizant NRC Program Officer.
c. If NRC wishes to terminate the cooperative agreement, the Grant

~

Officer will advise the Cooperator, in writing, with copies to the PI and the cognizant NPC Program Officer.

d. Within ten (10) days after receipt of a request from either party for temination by mutual agreement, the other party will provide a written response agreeing or disagreeing with the request for -

termination. In the event of disagreement, the Grant Officer will make a final decision and will give written notice to the Cooperator. i If the decision is to terminate, the Grant Officer will also advise '

the Cooperator of the effective date of the temination. The effective date shall reflect the fact that NRC may recuire a mininum of nirety (90) days to relocate tFe document cc11ectier2. The final decisien shell bc suLject to the review procedures described in Article 6 entitled, " Dispute Review Procedure, below,

e. The Cooperator shall not incur new obligations for the terminated cooperative agreenent (or the terminated portion thereof, as the case may be) after the effective date, and shall cancel as many l outstanding obligations as possible. The NRC shall allow full credit '

to the Cooperator for the Federal share of the noncancellable obligations, properly incurred by the Cooperator prior to temination.

_ . - _ _ ._ . .- __ _ _ - _ , . ~ ._ .. _

, ( (

6. Dispute Review Procedure
a. The Cooperator may request a review of a notice of termination or other adverse decision. The request should be in writing and addressed to the Grant Officer. It must be postmarked no later than thirty (30) days after the postmarked date of the notice of termination.
b. The request for review must contain a full statement of the Cooperator's position and the pertinent facts and reasons in support of such position,
c. The Grant Officer will promptly acknowledge receipt of the request for review and shall forward it to the Director, Office of Administration, who shall appoint a review comittee consisting of a minimum of three persons.
d. If the request for review has not been resolved by the effective date of the termination set by the Grant Officer, the NRC may withhold or defer payments under the cooperative agreement until the review has.

been resolved.

e. The temination review comittee will request the Grant Officer who issued the notice of termination to provide copies of all relevant background materials anci documents. It may, at its discretion, invite representatives of the Cooperator and the NRC program office to discus's pertinent issues and to submit such additional infomation as it deems appropriate. The chairman of the review comittee will insure that all review activities or proceedings are adequately documented.
f. Based on its review, the committee will prepare its recomendations to the Director, Office of. Administration, who will advise the l parties concerned of his/her decision. If the decision is to sustain the termination, the Director, Office of Administration, may reaffire the effective date for termination set by the Grant Officer or may establish a new termination date.

I

7. Allowable Costs
a. The allowability of costs and cost allocation methods for work performed under this cooperative agreement, up to the amount specified in the cooperative agreement instrument, shall be detemined in accordance with the applicable Federal Cost Principles in effect on the effective date of the cooperative agreement and the terr.s of the cooperative agreement,
b. The Federal Cost Principles applicable to (1) State and Local governments, (2) Nonprofit Organizations, and (3) Educational Institution cooperators are respectively as follows:

1 I

~ ^ ^ . - .- - -

(

- 6-(1) Circular A-87 (2) Circular A-122 .

(3) Circular A-21

8. Retention and Custodial Requirements for Records Cooperators shall retain and permit examination of records in accordance with OMB Circulars A-102, Attachment C and/or A-110, Attachment C, as

, applicable. Cooperators shall place appropriate requirements on sub-cooperators as specified by that attachment.

, a. Audit and Records Financial records, supporting documents, statistical records, and 4

other records pertinent to this cooperative agreement shall be retained by the Cooperator for a period of three (3) years from submission of the Final Report.

, (1) Records that relate to audits, appeals, litigation, or the settlement of claims arising out of the performance of the project shall be retained until such audits, appeals, litigation, or claims have been disposed of, but in any event

, not less than three (3) years after final report submission.

(2) Records relating to projects subject to special goject income provisions shall be retained until three (3) years from the end of the cooperator's fiscal year in which the cooperative agreement instrument requirement for reportino income expires.

(3) The NRC ind the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any pertinent books, documents, papers, and records of the Cooperator's organization, and of the performing organization, if different, to make audits, examinations, excerpts and transcripts. Further, any contract in excess of

$10,000, made by the Cooperator shall include a provision to the effect that the cooperator, NRC, the Comptroller General, or any of their duly authorized representatives, shall have access to pertinent records for similar purposes.

(4) In order to avoid duplicate recordkeeping, NRC may make special arrangements with cooperators to retain any records that are needed for joint use. NRC may request transfer to its custody of records not needed by the Cooperatcr when it determines that the records possess long-tertn retention value. When the records 9

8

-.-.-,v_ - _ .._ , _ . - ,

e

.e.

( (

7 are transferred to or maintained by NRC, the three (3) year retention requirement is not applicable to the Cooperator. In the event that these provisions are exercised. NRC wf11 negotiate a mutually agreeable arrangement with the Cooperator regarding reimbursenent of costs..

9. Payment and Financial Reportino Requirements

' Payments by NRC will be made by the method indicated on the face page.

i Cooperator requests for payment, NRC payments, and Cooperator financial reporting requirements shall be made in accordance with the following applicable OMB Circulars A-102, Attachments H and J and/or A-110 Attachments G and I, as applicable.

a. Methods of Pavment
1. Letters of Credit The letter of credit system may be used to provide funds to Cooperator organizations only under the following conditions.

When these conditions exist, use of the letter of credit method of payment is irandatory, except as noted below:

o the cooperative agreement must be for a period of at least twelve (12) months; o the cooperative agreement (or cooperative agreements) from a Federal grantor agency to a Cooperator' organization must total at least $120,000. Note: The direct Treasury check method of payment must be used, in lieu of the letter of credit method, when the total of cooperative agreement (s) is between $120,000 and $250,000 and where the Federal grantor agency and the Treasury Dcpartr.ent find a strong basis for waiving the generel rule, o the Cocperator has established (or demonstrated its-willingness to establish) procedures that will minimize the time elapsing between the receipt of Federal funds and their disbursement by the Cooperator; o the Cooperator's financial management system meets the standards for fund control and accountability prescribed in Attachment G to OMB Circular A-102, revised, for State and local governments, or Attachment F to Circular A-110 mr institutions of higher education, hospitals, and other nonprofit ornanizations; and l

l 1

( .

( }

.s.

i l

o the Cooperator agrees in writing to withdraw cash only when i actually needed for its disbursement, and to timely report i cash disbursements and balances to the Federal grantor i agency, and to impose the same standards for time and '

amount of withdrawals on any subcooperator organizations  !

with the understanding that failure to adhere to these  !

provisions is just cause for revocation of the unobligated  :

balance of the letter of credit. i

2. Direct Treasury Check (Advance Payment)

The direct Treasury check method (advance payment) is to be used under the following conditions:

o the cooperative agreement is for a period of less than twelve (12) months, or the cooperative agreement (s) from a single Federal grantor agency total less than $120,000 (or less than $250,000 if the crantor and the Department of the Treasury agree on a waiver);

o the Cooperator has established (or demonstrated its willingness to establish) procedures that will minimize the time elapsing between the receipt of Federal funds and their disburserrent by the grantee; a the Cooperator agrees to impose the same standards for o

amount and timing of withdrawals on any subcooperater organizations, and; o the Cooperator's financial management system meets the standards for fund control and accountability as prescribed in Attachment G to OMB Circular A-102, revised, for State  ;

and Local Governments, or Attachment F to Circular A-110 for institutions of higher education, hospitals, and other I nonprofit organizations, whichever is applicable.

3. DirectTreasuryCheck(ReimbursementBasis)

Reimbursement by Treasury check is the preferred r'ethrd cf paying a Cooperator organization whenever either:

o it has not established (or demonstrated its willingness to I establish) procedures that will minimize the time elapsing between the receipt of Federal funds and their disbursement by the Cooperator; or o its financial management system does not meet the standards for fund control and accountability prescribed in Attachment G to OMB Circular A-102, revised, for State and I

e

- - - - _ . _ , _ , , , . - _ . - . _ _ - _ . . - _ . . , _ . . _ --,es, , -,

( I - -

- g.

Local Governments, or Attachment F to Circular A-110 for institutions of higher education, hospitals, and other nonprofit organizations.

10. Property Management Standards Property shall be accounted for and managed in accordance with DN8 Circulars A-102 Attachment N and/or A-110. Attachment N, as applicable.
11. Procurement Standards
a. NRC Cooperators shall follow the requirements of the following applicable OMB Circulars: A-102 Attachment 0; A-110. Attachment O.
b. In addition, unless these provisions provide otherwise, prior written approval shall be obtained from the NRC Grant Officer before:

(1) Any of the research or other substantive project effort is contracted or otherwise transferred.

(2) Contracting for the commercial production or distribution of books, films, or similar materials.

c. NRC approvals will be made by the Grant Officer, who will i

specify which requirements of this cooperative agreenent must be flowed-down to satisfy the purposes of OMB Circulars A-102, Attachment 0 and/or A-110. Attachment 0, as applicable.

d. Cooptrator requests for approvals shall include en explanation of the need for the contracting, a proposed perfornance statement, justification for the price or estimated cost (including a detailed budget for cost-reimbursement type arrangements), and the basis for selecting the contractor.
12. Revision of Financial Plans Cooperative agreement budget activity under this cooperative agreement is subject to the requirements of OMB Circulars A-102, Attachment K and/or A-110, Attachment J as applicable.
13. Procram income Program income is subject to the policy prescribed by OME Circulars A-102, Attachment E and/or A-110, Attachment D, as applicable.

e t

(

( i i

i

14. Statutory Requirements a.- Civil Rights This cooperative agreement is subject to Title VI of the Civil Rights Act of 1964 (P.L.88-352); Title IV Sex Discrimination, of the Energy Reorganfration Act of 1974, and Executive Order 11246, as amended, Parts II III, and IV (for cooperative agreements over

$10,000 within a twelve month period).

l The Cooperator acrees that no person in the United States shall, on the cround of race, sex, color or national origin, be excluded from participation in, be deprived the benefits ef, or be otherwise subjected to discrimination under any program or activity for which the cooperator receives financial support from NRC.

b. Nondiscrimination Under Cooperative Agreements This cooperative agreement is subject to the provisions of the Rehabilitation Act of 1973, Public Law 93-112. The Cooperator therefore agrees that, "No otherwise qualified handicapped individual in the United States (as defined in section 7(6) of the Act), shall solely by reason of his handicap, be excluded from the participation in, be denied the benefits of, or be subjected to discrimination under any program or activity Federal financial assistance."

Further, this cooperative agreement is subject to the provisions of the Age Discrimination Act of 1975(42U.S.C.6101). The Cooperator therefore agrees that no age discrimination will occur under this Federally assisted program.

15. Liability and losses NRC assumes no liability with respect to any damages or loss arising out of any activities undertaken with the financial support of this cooperative agreement.
16. Site Visits The NRC, through authorized representatives, has the right, at all
reasonable times, to make site visits to review project accomplishments and management control systems and to provide such technical assistance as may be required. If any site visit is made by the NRC on the premises of

' the Cooperator or a contractor under a cooperative aoreement, the Cooperator shall provide and shall require his contractors to provide all reasonable facilities and assistance for the safety and convenience of th*

j Government representatives in the perfonnance of their duties. All site visits and evaluations shall be performed in such a manner as will not i unduly delay the work.

_ _ _ . _ _ _ . . _ . _ _ _ , _ , _ . _ _ _ _ . ,. . . _ . , _ . _ _ . _ , _ _ _ . _ _ , _ . _ _ , . . , _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ , . . _ _ . . , _ _ . _ . - ~ . . _ _ , .

( '

(

I 1

i

- II - l l

17. .T1 tie to Equipment Unless otherwise specified in the cooperative agreement instrument, title to equipment purchased or fabricated with NRC cooperative agreement funds by a college or university, other nonprofit organization, or a unit of State or local Government shall vest in the Cooperator institution, with the understanding that such equipment (or a suitable replacement obtained as a trade in) will remain in use for the specific project for which it was obtained. .

d

18. Organizational Prior Approval System i
a. In order to carry out its responsibilities for monitoring project performance and for adherfrig to cooperative agree rent terms and conditions, each performing organization shall have a system to ensure that appropriate authorized officials provide necessary

, organfrational reviews and approvals in advance of any action that would result in either the performance or modification of an NRC-supported activity where such approvals are required by the cooperative agreement instrument, including the obligation or espenditure of funds where the governing cost principles either prescribe conditions or require approvals.

b. The organization shall designate an appropriate official or officials to review and approve the types of actions described in a., above.
Preferably, the official (s) should be the same official (s) who sign (s) or countersign (s) those types of requests that require submission to and approval by NRC. The designated official (s) shall i not be the principal investigator or any official having direct responsibility for the actual conduct of the project, or a

, subordinate of such individual.

19. Star.dards for Financial Management Systems Cooperators shall have financial management systems that meet the requirenents of OMB Circulars A-102, Attachment G and/or A-110. Attachment F, as applicable.

l 1 - . . - . - _ _ - . - ..-----..- - -. .

- _ . - . . - - - - ~ . ..- - -

~ .. ('

(

FY-87 MICROFICHE READER PRINTER REPAIR NUMBER The FY-87 purchase order number for repairs to NRC-furnished microfiche reader printers is DR-87-0315. Invoices for repairs made between December 2, 1986, and September 30, 1987, should include this number as well as the serial number of the machine and the NRC tag number.

Invoices should be submitted on 3M stationery to:

Division of Accounting and Finance Office of Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 Since the purchase order agreement is with 3M, NRC can honor only those invoices submitted by 3M. If the company repairing your reader printer is authorized to repair 3M equipment but is a private firm not affiliated with 3M, their invoices must be submitted to:

Mr. Bill Jones 3M Business Products Service Center 8301 Greensboro Drive McLean, VA 22102 Bills for microfiche reader printer paper and lamps should not be sent to NRC.

Contracts and agreements stipulate that the library is responsible for the purchase of those items. Libraries have the option of charging for prints to defray the cost of these supplies.

Questions regarding the repair of NRC-furnished microfiche equipment should be directed to your LPDR Coordinator on the LPDR HOTLINE.

l l

l l

l

_