Spec 8848, Final Painting at Diablo Canyon Units 1 & 2
ML20214R304
Person / Time
Site: Diablo Canyon  
Issue date: 01/26/1972
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20213D572 List:
References
FOIA-84-741, FOIA-84-742 8848, NUDOCS 8706080075
Download: ML20214R304 (89)


Text

{{#Wiki_filter:. PACIFIC G AS AND ELECTRIC COMPANY 635r S AN FRANCISCO CALIFORNI A DEPARTM ENT OF ENGINEERING account 4NG DATA ...,'::::::.. h e:! cc ^ w w 7 T,9 ? ' GM 167029 10 GM 169972 SoECIFICATION NO. 8848 - FILE -COPY ~ ~ e SPECI FIC ATION $bturn to S ..M. ARTMENT- - - - gy ENGINEERING SERVlCES-. FINAL PAINTING .-------..g.- REMSiONNo.1 DIABLO CAMON MTS 1 AE 2 g COMPRISING y 1 Specific Conditions { < t 't General Conditions Contract For:n Insurance Questionnaire Form of Proposal JP 8706080075 870608 PDR FOIA DEVINE84-741 PDR v,, APPROVED BY J. J. McCann/ATL (NLT/WJP/KET) BIDDER-SIGN HERE To 1NorcATE TsiS R. V. Bettinger/EPW/EJR (WLT) HAS BEEN USED IN PREPARING PROPOSAL V. Kelly /WJL (HJG) FIRM s JbO.Schuyler By DATE DAT E January 26, 1972 '~

.- ~ ~.. . ~ - v i 8848 ~. Scepe; l-1 SPECIFIC CONDITIONS l. 'SECTION l' SCOPE OF WORK i 1.0 OUTTINE OF WORK AND GENERAL 4 1.1 This Soecification covers the finish painting-and related work l .for Units 1 and 2 at Company's Diablo Canycn Site. 4 ,7ocation: The work site is located approximately six miles 1.2 north of -Avila Beacir;--San -11ris-Obispr-County, -California. I

1.3 Definitions

sDefin4edan of 3idder, Company, Materials ~ Department, Constructor,, Contract, Contractor, Engineer, Specification, 4 - Work,-ite., is as-defined 1:nder the General Conditions of this Specification. 1.4 Company representatives to whom all questions pertaining to the work shall be directed are as follows: I I 1.41 Prior to award of contract, the authorized representative is the Company's Materials Department. For information pertaining to the specifications and drawings, bidders shall contact the Materials Department representative. 1.42 Af ter award of contract,

  • the Company's representative will be Constructor.

6 I

1.5 General

The work shall comply with the requirements of the Specific and General Conditions of this~ Specification and shall include the furnishing of all labor, material, tools and equipment, and facili-ties required therefor. Work specifically excluded is listed under. Paragraph 2.0. All work necessary to make a complace installation ready. for use or operation shall be performed and considered as included in j-the prices quoted for work hereunder whether or not specifically classi-find for payment under any of the items of the Proposal Form. t ] i 1.6 The Work Shall Include the Following Principal Items: 1.61 Finish painting of the turbine building. I 1.62 Finish painting of the auxiliary building, including areas FE, FW, GE, GW, J, and L except as noted in Item 2.13 below. 1 r .- - +, c y, y._ y r -p, ,_.___._,,,,,,4,y

a 8648 Scope 1-3 5.0 WORK SITE FACILITIES

5.1 General

It is the desire of Company to retain the natural landscape of the plant site, disturbing the terrain only in those areas designated on the drawings or other areas where it.is unavoidable as a part of the perfor:ance of work hereunder.. Any unsightly displacements shall be restored to their original condition i=sediately after the completion of work. Contractor f..all cooperate with Constructor by restricting travel and other operations at the work site in accordance with this Section of the Specification.

5.2 Facilities

5.21_ Contractor..shall furnish all facilities Ihat may be necessary for performance of work hereunder unless specifically described to be provided by Company. All tenporary buildings and structures will require approval of Constructor regarding location -and-appe-- ^ ' ' - ctura17ensideration vill govern ae all times during the progress of work. Contractor shall not engage in any activity which =1ght result in unsightly conditions except for an approved specific length of time. 1 5.22 Specific Areas: *In the vicinity of the work site, an area vill be assigned to Contractor for his office, material stor-age, shops, and material laydown..Under no circumstances shall Contractor occupy other areas without specific authorization of Constructor. 5.23 Buildings erected by Contractor shall be approved by Constructor prior to erection. All temporary buildings shall be selected from one of the following, and no substitution will be allowed without the specific approval of Constructor, a 5.231 Armco Steel Corporation Ar=co Building Systems Self-Framing Type 5-2 Color - Dese.rt Tan 5.232 Butler Manufacturing Company Butler Building Systems Rigid Frame Type RF 21 Color - Walls, Dulite Sage Green Roof - Parchment White 5.233 Stran Steel Corporation 4 Stran Steel Systems Rigid Frame Type RF with Type SF Roof and Wall Panels Color - Duli".e Brierwood Tan (Stran Satin) 1 i i I

S,848 Scopa 1-5

5.7 Water

Co=pany will furnish necessary wa:er vi:hin :he work area, described below, for the work hereunder a: no cost to Con:ractor. When Bidder visi:s the work si:e, Construe:ct will indica:e the points of connec: ion to :he water supplies. Flow will be 1tnited to the capac- .ity of the existing facilities. Con:rac:or shall furnish all piping and equip =ent for transporting and disposing of water used f or cleaning, test-ing, or other purposes. Force pumping of existing lines by Contrac:or shall be subj ect to prio. approval. Co=pany w;11 assu=e no liabill:y for the suspension of wa:er services. 5.71 Drinking water is in sher: supply. Cc=pany will furnish drinking water in nominal quanti:1es for use by all Contractors at '~ one established point. ~~ ~' " ~ ' ~~' ~ ~~ ~ ~ ~ . _ _ _. 32w water is available in ' limited quantities for 5.72 construction purposes. This water is not potable, and Contractor shall notify his e=ployees of sa=e and shall post warnings ar each of-his72w,.ater supply uurlets ;-Cc=pany vill ake analyses durd=g -- -- construction to assure acceptability of the water for the work hereunder.

5.8 Power

Co=pany will furnish electrical power at 115 volts, single phase, and 480 volts, 3 ' phase, free of cost to Contractor, at established outlets within the work area. All temporary or portable wiring beyond these estaolished delivery points,shall be furnished by Contractor. However, all connections to these established delivery points, including the connection of welding machines, te=porary lighting, electrically driven su=p pu=ps, and senilar equipment, vill be by Con-structor. Co=pany will assu=e no liability for failure or suspension of electric power supplied. 5.9 Telechene Fae:11 ties: A culticircuit PT5! cable is available at the site. Should Contractor desire telephone facilities, he shall make all necessary arrange =ents for these facilities and be responsible for paymen: for sa=e. Overhead services will not be allowed. All arrangenents for telephone services shall be subject to Censtructor's approval. 5.10.(Not applicable) 5.11 (Not applicable) 5.12 Lands for Construction Purposes: 5.121 Company will provide all aands and rights of way necessary for the work and designate the use cf same

o 8848 Scope 1-5

5.7 Water

Co=pany will furnish necessary water w:. thin the work area, described below, for the work hereunder at no cost to Contractor. When Bidder visits the work site, Constructor v111' indicate the points of connection to the water supplies. Flow will be 11:1ted to the capac-ity of the existing facilities. Contractor shall furnish all piping and equipment for transporting and disposing of water used for cleaning, test-ing, or other purposes. Force pu= ping of existing lines by Contractor shall be subject to prior approval. Co=pany w:.11 assu=e no liability for the suspension of water services. 5.71 Drinking vater is in short supply. Co=pany will furnish MWg ' water in, nominal quantinias for use by.all Contractors.at onet est s h'H ehed nMnt. ___. r !.R ?.a. water 1.s A. 11.ibl. ' ' ' ed qu,.t:.t.as ~ or s. - L,._ cons. rus,cie 7;rpesas.3 In c ex ter as .ot potacie, -and -Cr : tract:r shallweifv his emplovees of same and shall cost warnings at each - cf y Srmr; water supply os.tlett. Co=panylwill =2ke analyses curing ~ 1 . -- Innsm* m-asscr=,rreprabiliry =f the varer iorrrham.ork --

hei a. i

'= ~. ~ -.--;=. -.. _ _. - - - .. _ = _.

5.8 Power

Company will furnish electrical power at 115 volts, -- -- - - - - - - single phase, and I.80-voltsr-3 phase,- free of cost to contractor, at established outlets within the work area. All temporary or portable wiring beyond these established delivery points shall be_ furnished by Contractor. However, all connections to these established delivery points, including the connection of welding machines, temporary lighting,- electrically driven sump pumps, and similar equipment, sill be by Con-structor. Company vill assume no liability for fat' lure or suspension of electric power supplied 5.9 Telephone Facilities: A nulticircuit PThI cable is available at the site. Should Contractor desire telephone facilities, he shall make all necessary arrangements for these f acilities and oe responsible for paynent for sa=e. Overhead services will not be allowed. Ali arrangements for telephone services shall be subject to Constructor's approval. 5.10 (Not applicable) 5.11 (Not applicable) 5.12 Lands for construction Purposes: 5.121 Company will previde all 4 ands and rights of way necessary for the work and designate the use of sase.

I 864Ii Scope 1-T 5.143 Constructor will furnish identificatien nu=bers to be used on vehicles of Contractor and Contractor's e=ployees. Vehi-cles will not be pe=1tted on site without an identifying sticker or special pass issued by Company. 5.15 Access: Equipment, personnel, tools, or material shall be transported to and frc= the property during scheduled work hours unless otherwise pe=1tted by Constructor. A pe=it will be required to move tools, equip =ent, and material off of the. work site. Permits will be . ob cained_f r.or._. Cons tr_ucIor_as_each need occur s. Company.will furnish. gate =an during approved working hours. a =-.: 3.16' Weather:2Contracter shall provide the necessary tarpaulins, fr<= 4ari===ne - -- - -suppqrtsgggrimL-of-his-work-and mater 4 7 2 ver.ther.,::s:: sprs f rain,' :nd --d :: r 5 :nti:fn ti:n ef Cenet :ter. ..N T.u.511cmi1hattsm: '.rompany will install lights for lighti=g the -- encire,yazd sreCCantractor sna p[rovvie.accitions. n.gnt:.nf :or nrs ~ ~ - work w'hepit-ds z5ces'a~m/.12 hrds: ceWucc the work -in-a safe,--work-- = =14k manzdr.All applicable codes-and requirements shall be complied

- -r.=-- - =with. _-

__=_.- __c__c - Sr18 -Good-Housekeeping : dontractor shall =aintain clean and orderly work and storage areas at all times during the progress of his work. Toward this end, the requirements of Paragraph 26.0 of the General Conditions will be rigidly enforced. 5.181 Contractor shall maintain the work area in a clean condition and shall remove all waste material and rubbish frc= the work area i==ediately as it accu =ulate and dispose of it in Company furnished containers. At the completion of work, Contractor shall re=ove all tools, equipment, vaste =aterial, and rubbish frc= the work site and shall leave the area in a clean and orderly condition. Contractor shall clean any oil spills on concrete i= mediately with Quick Serb or Chen Sorb. 6.0 SAFETY PRECAUTIONS 6.1 Protection of Work, Safeguards: Contractor shall provide and maintain during the course of his work and as long as a hazard exists sufficient electrical type warning devices (flashers), barriers, barri-cades, te=porary walks, platforms, and other safeguards as required for the safety of his e=ployees and others working in the area.

8S48 Scope 1-9 9.2 Use of Foreign Material: The use of foreign material will net be acceptable. The price (s) quoted in the Proposal shall be based upon all co=ponents of the equipment and/or material used in the work having been produced or manufactured in the United States. 10.0 (No t.. applicable) .. ~ . _ ~. .- _ z : :.- s - -- . :.. r.- - s- _a.. ;n.. a y?r,..'. '~ = . ~ ~, ~ .c _11.0 !"IM EECC0i!!% ____ ___..,,,. - .m- =... .m contractor..shaLL =nhr'

:o uc5IttWtor"da:.iv a record df

' ~ ~ " ~ ~ ~ 1-manhours ~ wor]Und -$ -enchaif-liis--employees-toif acil*1 tate' Company's account-f ~ ing. -,The'transcripF4 hall fully Jescribe the various classes of work _._ = .= _:-. cperformed:in-conforsnance-with the -applicable-classifications-est forth.- in Company's item segregation or the breakdown of'the classifications as - may be-deemed--advisable by-Constructor, _The transcript shall-also indicate the time allotted to each classification of work and the hourly or daily applicable rate of pay of the employee. 12.0 (Not applicable) 13.0 (Net applicable) 14.0 (Not applicable)

1 s s. 8848 Painting 2-1 SECTION 2 PAINTING 1.0 SCOPE

1.1 General

~ .- a... ..r - :. 1.11,,. cont.raer.orgshc1 be required 'to furnish a high quality ' of:-surf ace.-prepa=ativ,'ei=t-sppli=ctien, -a=d - v::rir-um. hip s-~-All--- -- scrk sha~' b.e sui'ect.tc.ste.' t

  • spc. tion.

.r. . r,,,..; r - q.- f :- m..,::= ~ . L2. Work concrises painting of all surfaces as gecified'herein

and asphorn,og, rize.. drawings. g '4c h shcil "u 1"de furnishing Of all labor,

- ^ ~ -- - sararial.s; cools;-laddars; zad :scaifolding.-^ - - ~:- -- - - - r. . s. .. =.. _-_ u. := 2.0 SURFACE PREPARATION

2.1 General

2.11 The extent of surface preparation necessary shall vary with the existing condition of the item to be finish painted. These items may be unpainted, shop primed, or shop painted unless otherwise noted. Ccmpany representative shall indicate extent of surface preparation required. 2.12 All surfaces shall be dry and free from dust, dirt, grime, grease, oil, rust, and other substances or coatings which will i= pair the quality of the work or interfere with the preper adhesion of the coatings. 2.13 No halogen-based cleaners shall be used. 2.14 Ccmpounds used in surface preparation shall not be allowed to contact surfaces other than those being prepared # r painting. 2.2 Carbon Steel Surfaces: 2.21 General: All foreign materials shall be re=oved. Surfaces shall be cleaned in accordance with Steel Structures Painting Council Specification SSPC-SP-3 " Brush Blast Cleaning," unless otherwise recc= mended by paint manuf acturer. / - >..-- /; .r. -,i-

S SI-S Painting 2-3

2.6 Plaster

All holes, cracks, and other surface defects shall be repaired with patching plaster properly keyed to existing plaster and textured or finished to match surrounding surface by others. No paint or sealer shall be applied on plaster when coisture content exceeds 8 percent as determined by a moisture testing device. Plaster which has cured less than two months shall be washed with Dutch Boy Alki-Free. 2.7 Exterior Surf aces of Generator Housings and Associated Structures (including turbine generator, exciter, and exciter shelter): .. c s,, x ~ ~ --- 7.7T~Tsurfaces shall;-oe sinded 6i.riiinave 'ill;ro gli edges ~a6d - u loose painc. r: ~Qr: - p y.i.-, _ r m %A ma .m.m... a m 7, acaf ve eme e me Shar.dn-:J411d=-= _ M M y iserd E q p_,,p p ied by spr,ay after reducing 20, percent sittr'Teluol4R2K.1. -- - 2 2... -- _--.-- - 2.23,g ggy,eks and dents shal1% filled Oith Rinshed-Mason #74 - - ~ ~ Green Stuff Putty and sanded out smooth and flush. One coat Sherwin- ~ ~ ~ ~ ~' - Williss Kam Prf:nW Surficer"#3A43801 shall be applied-to fill small scratches and pits on surface and sanded out ;nnooth and flush. 2.74 Primer and/or finish coat shall be applied as specified. 3.0 MATERIALS AND APPLICATION

3.1 Materials

3.11 Materials shall be.as set forth in Paragraphs 4, 5, and 6. 3.12 Materials shall be subject to strict control to assure identity of all materials purchased and applied. 3.13 The manufacturer (s) of the materials being supplied shall furnish a product identity certification with ach batch. Certification shall precede shipment of batch to jobsite. This certification shall include at least the information requested in Form 1 appended. Such certification shall be supplied to both Constructor and Contractor and subject to approval by Engineer. t

~ 8848 m. Painting 2-5 4.0 PAINT SYSTEMS - CONVENTIONAL

4.1 General

4.11 Conventional paint systems shall be used in the turbine (generator) building and in the auxiliary bui'. ding except for the following areas: Area K: Elevations 85', 100' and 115' ..._ - Ar ea -,h 71="" has_100L, 114'and_140' ) 4.12 Isans 4o h fin 4 =h -painted will initially be (I,.). N. =6 red' _ {2) 'shhp ' prim.ed, 6r (3) shop primed and painted. . ' ~ ~:. f.13-All iums'.sha*.1 he finish painted. npainte.; iu.ms ~

-- i.-shs11;#s,c
:=;t.ereAy-pr.med -an: f::. isn paimtec, f o; pr..c-.irams d

shall-+e wrot primed -and recrimed, if necessarv i i ._ified : film thickness of pri=er and shcIl then E, to :sa nta n spec-id d eh ; 7-Ted. g. - T 1--- Shop prihedrand thop pdinted-items ~shall be fi-ish p=""M unless - otherwise specified. _,_- _----..; _= - = - - -. 4.2 Minimum vet - and dry film thicknesses for primer and finish coats-shall be indiented-below 1n parentheses. Regardless of film thickness of undercoats, the film thickness of the finish coats shall be as indicated. 4.3 Steel Surfaces (Exterior): Primer - Devoe Chem-Zine Silicard 3-14700 (6-3 mils) Spot Primer - Devoe Chem-Zine 14600 ) ~~ Finish Coat (s) - Devoe Chem-Bar High Build Coating 413XX (8-4 mils) 4.4 Steel Surfaces (Interior): Primer - Devoe Quick Dry Red Lead Primer 41821-(4-2 mils)- Finish Coat (s) - Devoe Speed Rex 414XX (two coats 3 mils) 4.5 Steel Surfaces (Interior): y 3g Primer - Devoe Acrylic Red Lead Primer 46222 (3-1 mil) Finish Coat (s) - Devoa Acrylic Maintenance Coating 426XX (8-3 mils) 4.6 Galvanized and Aluminum Surfaces (Whene r Specified): Primer - Devoe Zine Dust Primer 14000 (2-1 mils)- Finish Coat (s) - Devoe Speed Rex 414XX (two coats 3 mils) 5 4

8848 Painting 2-7 4.11 Wood Surfaces (Interier-Natural Finish) : Primer - Devoe Quick Drying Wonder Woodseal Finish Coats - Two - according to gloss specified Se=igloss - Devoe Quick Drying Woodseal ^ ~ 5.0 P INT SY$TEfiS - CL' ASS A AREXS ~~ ~ ~-- ~~ ^ ~ ~ ~ - - - .5.1 -General:- $ ' - .k ~~ _ :. __ s a. % w e '

  • 3m Tlaes A areas are chara=teri=ed by relatirely large

_ 'q-f-ijirs 9f-ridi_escri're -er'.sle. b* high redie-ter fields, by 1high-yrtibabilittof h - "-=tien by radion=clides, by the possibil-h y ul spill., pi-L wl f. l.-.cids -and-alkalies,--by--frequent- . exposure.*n:*4gh hm=4A4*y_ n d temperature, by exposure _to decontam-Anation Seag' ants '.(acids,"sm"as) and steam c1*=nf-g, and/or by _._ __._ _ constant = =-=4nn d _dadnn4*ed water _ .5.12. Class.A_ paint systems as specified shall be used in the following areas according to schedules to be furnished at a later date: Conta1tment Structures Elevation 100' Areas K and J Elevation 115',2.and Col. N to S ) Ion Exchanger Room (Col. 16,to 19 S 8 5.13 Items to be finish painted will initially be (1) unpainted, (2) shop primed, or (3) shop pri=ed and painted. 5.14 All ite=s shall be finish painted. Unpainted ite=s shall be completely primed and finish painted. Shop primed ite=s shall be spot primed and reprimed, if necessary, to maintain spec-ified f11= thickness of primer and shall then be finish painted. Shop primed and shop painted ite=s shall be finish painted unless otherwise specified. 5.2 Mini =um vet and dry film thickness for primer and finish coats shall be indicated below in parentheses. Film thickness of all finish coats shall be as specified regardless of total dry film thickness indicated. 9 g

,7 .,,, 8848.

  • Painting 2-9 6.3' -Steel' Surfaces:

Primer .- Chem-Zine Silicate" Base Zine Rich Coating #14700 (6-3 =ils) Final Coat - Chem-Fast M.P. Finish 425XX in selected color (6-3 mils) 4 YlI' 6.4 Concrete and Concrete 31ock Surfaces: +

,'f Filler

- M'neral Filler #10100. Use on concrete block and on -concrete if rough or with =any voids. f Firs t_._ Coat - Chem F_ast M.P. Finish 425IX _in_se_lected color.using... Cham-Fast M.P. Regular Converter (4-2 ' mils). Thin with .1 quar.t. Cham-Fast.lhinner.42300 per gallon. Second Coat - Same virhoiit-rhi;ider (4-2'1a11s) - v4 ; - w w. -L.., - n 'i 3..p . -,q. g .- + , y.. --sq:yhm;~g-Q=- ; ;- - _. r.:- - ~ ~ _)_ e. -- -~ y-~ _t.._ _. 7.O -TAIr 2 aTri.7 '@ 1 *

  • TUR - AEn@'

2--- F7,

b i,.
;___..;--._- --. -.h 1-General: -

L- - i --7,11_.-All-areas.and/o'. surfaces except prefinished irams, r l such as siding, roofing, and anodized trim, shall be finish painted using paint systems specified in Paragraph.4.0 unless-otherwise specified.

7.2 Schedule

Paint System-Areas and/or Surfaces See Paragraph Ungalvanized surfaces, including doors, frames, louvers, piping, screens, structural steel, and such' 4.3 Main transformers, auxiliary transformers,-standby transformers (flow coat radiators) _4. 4 s Tanks (transfer, condensate storage) 4.5 Concrete surfaces No painting Galvanized flashings, doors'and frames 4.6 Piping, insulated ~(omit primer) 4.5 Piping, uninsulated, below 200F 4.3 Piping, uninsulated, 200-400F 4.7-Piping, uninsulated, 400-1,030T; 4.8 Structural steel and pipe restraints 7.3 Transformer radiators shall be spot primed and flow coated. I s, ., :. m ..,,.- ~

. ~ ' 8848 Painting 2-11 Doors Rooms Walls Ceiling Fra=es' Miscellaneous Elevation 85'-0" 4.4 (101) Diesel Generator 4.4 (102) Diesel Generator 4.4-(103) Diesel Generater 4.4 (104) Passageway --(105) - Swi-tehgear - _ 4.4 ___.. - 4.4 (106) Oily Water Separator -1+.4 (107) Space - ~' (108f Luh p_11.Sterage Tankj4;.92 4.91 ~4.92 Piping 4.4 g ~ ~ . u. i. -i - - - " A --4 ;?.- n. " 4.51

l. 91

%109) Passageway-2 E ;--t ---M T. Is,=- g y C -- - - SG 4.4 (110} V*?*dhule. 4.-91 4.91 7-~ ' ' ~ ~ 7 (IllT Mach.- Skisp a-' s -. ,.-A S1 -. '4'.91 ~ 4.4 ~ ~~~~~ _G SG ~ ~ 2-- SG -SG 4.4 Crane and -_ :. -- -- -.r.;_.._ _ _ g,gi, 4,4 (112) Elect. Foreau 4.91 4,4 ..__ ___ _ _ _. gg. (113) Elect. Shop 4.91 4.91 SG SG 4.4 (114) Welding Shop 4.91 4.91 SG SG 4.4 (115) Mech. Foreman 4.91 4.4 SG (116) Tool 4.91 4.91 SG SG 4.4 ~~ (117) Vestibule 4.91 4.91 SG SG 4.4 (118) Passageway 4.91 4.91 4.4 SG SG (119) Mech. Closet 4.91 4.4 SG Elevation 104'-0" 4.4 (202) Space 4.4 (203) Space 4.4 (204) Space ( ) Lub. Oil Reservoir 4.92 4.92 4.92 Tank ex:erior 4.4 r y - e-e-w

.: 8845 Pain:ing 2-13 S.33 Schedule: Note: Gloss indicated as F= flat, G= gloss and SG=se 1 gloss Paint Systen Areas and/or Surfaces See Paragranh Below Elevation 60'-0" . Ar eas_H, _I,. GE, _.G'4_. ._S.42 Elevation 60'-0"

t,*.. g g s -- *

.. g73 D.g,i[&f._.~f ? _.}. 1__ *'.-_ _. - - -. - _. __-. - _.. :_. g, 4 2 -. _ __ -.. ~ w,- w-- ;_ -+;. --. E1en tte- _ Areas H; %, GE,7;GW 8.42 2 Elevation 85'-0" Doors _..-- Ro oms - -- -- --Walls Ceiling Franes Miscellaneous (120) Counting 4.91 4.91 Metal wall G G panels 4.91 G (121) Office 4.91 '4.91 SG SG (122) Hallway 4.91 4.91 SG (122A) Stairway 4.91 4.91 4.4 SG SG (123) Reg. and checkout 4.91 4.4 Counter and G soffit 4.11 (124) Storage 4.91 4.91 4.4 G G (125) Access Vestibule 4.91 4.4 SG (126) Vent. Equipment 4.91 4.4 Access door G 4.4 l

  • (127) Locker No. 1 4.92 4.92 4.92 (128) Rad. Prot. Eng.

4.91 4.4 G (129) Laundry Supply 4.92 4.92 4.92 Wainscot - no painting (130) Hot Shower 4.92 4.92 4.92 Wainscot - no painting cabinet - 4.10 G

8848-Pain:ing 2-15 Pain: Syste: Areas and/or Surfaces See Paragra:h l Areas FE, GI, GW, H and L 8.2 Areas J and K 8.42 Elevation 115'-0" Doors i __. Rooms _. _ _..___.__ Walls... Ceiling __ Frames M1sc. 4.92 125 Volt.D-C Dry Wasre. Storage 4.92 --(401,-%02',~ 03, 40& -Cable-Sy r nfik~ d' g-? T--,'--4. 92 - - - - 1 ' ~ ~ 1127*-4*3. . 4 JI 4c=ra=.-Sr: rage. (130') n-.g._-. 4.92 Conram. Siiorage (130?.) C ~ ). 7 ___ 7_a_. n _ p g g.g ,g, _ ~ y - Areas and/or* Surfaces See Paragraoh' Areas FE, GE, GW, H and L 8.2 - --Areas J and-K - - - - - - - - - 8.4 Elevation 128'-0" Doors Rooms Walls Ceiling Frames Miscellaneous (403) Communication 4.91 4.91 4.92 SG SG (404) Cc==unication 4.91 4.91 4.92 SG SG Paint Syste= Areas and/or Surfaces See Paragraph Area H 8.2 Storage Space in Area J (125'-6") 8.42-Elevation 140'-0" Paint System Areas and/or Surfaces See Paragraph Area K - Mechanical equip =ent rooms 8.2 - Shop spaces 8.42 l Area J 8.2 Area L 8.42 f 6 -v,, e- -,,e e- % .-u-, e y r- -3+ +c

<= r 8844

  • Painting 2-17 Paint System Areas and/or Surfaces See Paragrhph Elevation 115'-0" Surfaces and areas, inner areas (53 feet radius) 5.3,'5.4 Outer areas 6.3 e

Elevation 140'-0" J Equipment, ran1re,.and piping 5.3 - Tialls (to Elevation 150'-0")' ^ 1+ .5.3 .-..-- n-Calling -anB Ja'6so?.fited.:.strncenre ' ~ 6.3 ~ i m No. painting _.. E?dipdistysth " 7 **~ 6.2 ~ . _.E u.od$ 4._' tt._ 1.-,.':.. . s _;. -3. g. v. i ^ .y. - ~ ~ - - - -- '[ 3q _. ~.... -. 9.0 MISCELLANEOUS TTEMS e 9.1 Fire piping and equipment shall receive two" finish coats PG&E-No. 24 Vermilion (Safety Red) (Devoe Speed Rex 414-XX). 9.2 Aluminium sash and trims shall not be painted. i 9.3 Exposed piping, conduits, electrical outlets, access' panels, registers, exposed duct work, and such shall be painted to match adjacent areas. t 4 10.0 CLEANUP + 10.1. Upon completion of work, all surfaces shall be lef t free from stains, spots, spattering, or other defacement resulting from painting. All work areas shall be left in a clean and orderly condition with all paint spots, rags, and discarded equipment removed. All glass in areas j painted shall be cleaned with suitat cleaning ccmpcund and polished dry with a clean cloth. b t 4 l t J-y pf T* ~ 4r .y-c.em


)'y e

-v---- c-e

FORM 1 MANUFACTURER'S PRODUCT IDENTITY CERTIFICATION RECORD GENERAL DATA (To Be Filled In By Purchaser) PROJECT NAME Diablo Canyon No. 1 DATE PROJECT LOCATION Avila, California REPORT NO. OWNER Pacific Gas and Electric Company PURCHASE ORDER NO, BUILDING, UNIT OR EQUIPMENT DESIGNATION SHOP WORK FIELD WORK _ TECHNICAL _ DATA _,_____, _ ___ __ _,, (Submit:ed at Time of Shipment) DATE ~ ~ ~ ~ ~ .y r~ MANUFACTJRER --- - =;:=. _ -.. m~ w._.4 ; ;.. _ _AND NUMBER PRODUCT NA_.% t

a.

= g y g-- --.c. - BATCH ~ NO.' 2=

- ~ ~ - - - -

7 -~ =- -~ ~ ~ DATE OF MANUFACTURE - -- ~ - - - SHELF LIFE NET WEIGHT LBS. PER GALLON (Fed. Test Method Std. No.141, Method 4184 e ASTM D-1475-60) VISCOSITY RANGE TEMPERATURE F METHOD SOLIDS VOLUME % e ~ DRY TIME: HOURS @ F

  • R.H.

TACK FREE TIME: HOURS @ F % R.H. RECOAT TIME RANGE F % R.H. MINIMUM DRY FILM THICKNESS PER COAT: MILS COLOR, VISUAL INDUCTION PERIOD HOURS F POT LIFE HOURS F MIXING RATIO: PARTS COMPONENT BY WT. PARTS COMPONENT BY VOL. PARTS COMPONENT SPECIFIED THINNER FLASH POINT TAG OPEN CUP F (ASIM D-92-46) SIGNATURE, TITLE

gggs l s. ~~ Measurement and Payment 3-1 SECTION 3 MEASURD'ENT AND PAYMENT 1.0 SCOPE AND GENERAL

1.1 Scoce

This Section co= prises the ce=plete perfor=ance of measurement and payment for work specified herein. 1.2 Cost-Plus 'Jork: --1.21 -.I;:ams Included: Tor work authorized to be performed, 7 _.r napahy.=*'n v d-h me cnntractor_for t.he -cost _ro Iourractor. of _the.- ~ f511osi=;;flite=s.Econtra'dfer"shar " understand'-thet the amount of ~ vn k il.ich'si'y.ba dens und: tha ter=: of Pars:;rn:h 1.2, 2:st-Plus ~ Wari,4.is not specified. and no claim will be accepted because such- ~ '

vocx si-gz' acannrr-Imas *=n ce nar anticipated.

a t a.. _.- r ~._.h /L h M $ ages _and. salaries of Contractor's employees, n. _c =_. -. _: = __ _ _; - --including -4cb_-fottaman ;(as -required _by-Union _4greements) _. engaged directly in perfor=ing the work hereunder, including payroll ._. - - _. _ _.. __...__caxas,-vacacion,. holiday and sick leave allevances, and other fringe benefits Contractor is required to pay as a result of collective bargaining agreements between the construction industry and the labor unions involved but excluding any move in or move out expenses for such employees if they are already on the project and the wages or expenses of any foreman or superintendent (not required by Union agreement) or field office personnel. 1.212 Certain paint materials actually used (see Para-graph 1.223 following), including sales or use taxes thereon and the transportation thereof, all at actual cost, less trade but not cash discounts and less the fetir value of materials and supplies salvaged and retained by Contractor. 1.213 Amounts of premiums for the insurance required in. Paragraph 13.0 of the General Conditions but only up to limits of $200,000 for any one occurrence for the insurance specified in Paragraphs 13.21 and 13.22. Premiums for other insurance shall not be separately reimuursable. 1.214 Incidental direct costs to Contractor arising directly from performance of the work hereunder, provided they have prior approval in writing by Constructor. 1 l l I i

8048 Measure =ent and Pay =en: 3 1.23 Data P.ecuired: For all work, Con:ractor shall supper: invoices for payment r-ith ite=1 zed receipted b:.11s f or caterial. Contractor shall sub=1t certified copies of payrolls covering all labor e= ployed by Contractor performing work under this Specifica-tion. Satisfactory evidence shall also be submitted.to verify = ate-rials drawn frc= Contractor's stock and other niscellaneous ite=s of cost not otherwise verified. 1.3 Construction Building: .-.. ~ 1.31 Contractor to quote a lu=p-su= price to furnish, erect, maintain, and remove.a construccion buiiding as detailed in Paragraph S 2,3,. Section..L.

r. n:a

.v1 .>e,.

u. -

2,.. -n.: n,- % - ~ ~ -... w w. --.-. --.. ~ - - m'f.31 Kir.ety-five pEcea.: of th..a. It=p su= will be payable when ~ .. ; --che.on11d1:;;; is aractangpn=e an. :he balance after the b w =g d is. removed. l - - e e --.----.~. '~".L~~*.~~~~'"2.".~~~~~~ ~._^~~~.#- .~... '. ; ~ ' '..: 4 + WS S O e f +

s Inddx GENEEAL-CONDITIONS INDEX Page DEFINITIONS A'TD PROPOSAL GC-1 to GC-4 1.0 Definitions 2.0 Proposals 3.0 Conditions Governing Pricing . 4.0_Infornation to be Furnished _b C 1 ontractor .DruiWINGS. SPICIFICAIIONS, AND.INFMMA"' ION GC-4 to GC-6 .X ~y :... _.. W~ i sak Sjeciyg* d %#---*d ~ ~ 5'"- # shed by

  • L
.=.

.. 3 - ...- S_D Aw: rd cf C-+---- 6.0

  • =-
  • N.. $u.%:il 4 r >:=ise r

~ s.. LECACAND INSUEENCE +. z_ G C-6 T GC:1.i. -~ .~ m . y. _ __ _._._ ;. r_-_ . ',._. ( _ _i. 7.0 Permits and' Other Misc.rt ecous Requirements _8.-D -lEnfr.ingement.?rotection -- 9.0 ltisk of Loss or Damage to Work -10.0 Modifications,-Assignmentrand Notice 11.0 Bond 12.0 Indemnity and Withholding 13.0 Insurance 14.0 Claim by Contractor for Damages 15.0. Liens ADMINISTRATION OF CONTRACT GC-11 to GC-15 16.0 Company's Representative 17.0 Control and Performance of the Work 18.0 Inspections and Tests 19.0 Delays and Suspension cf Work 20.0 Termination of Contract MISCELLANEOUS GC-15 to GC-28 21.0 General 22.0 Laying Out Work 23.0 Safety Precautions and Protection to Property 24.0 " 2rantees 25.0 company's operation 26.0 Cleaning Up 27.0 Field Conditions: Visit to Work Site 28.0 Materialu, Facilities, Services, and Structures Furnished

  • 29.0 Method of Pay =ent 30.0 Additional Work or Changes 31.0 Cost-Plus Work 32.0 Nuclear Insurar.ce and Inde nity 3'3. 0 Energency Vehic.le GC 1:

W G:nsral Conditions GENERAL CONDITIONS DEFINITICNS A'O PROPOSAL 1.0 DEFINITIONS 1.1 "3idder": The party or parties sub=itting a proposal for the specified work. 1.2 "Cc=panv": Pacific Gas and Electric Co pany. 7~- ~' - l-'37 ens trueror*1 Co=paliy's Tice 7:esident-General Construction ~~' ~~ or his authorized representative. .. @ ft ' ~ *, - ' _ E4.."drmmetE:.p e'1Wahe..a

= t,-specifications _, drawings,

e appendicias; and az:7 band,.cogethervith azzy other material snecifically. incorporeted-th m 15. "-

y.y::a.r y y m

.1.5 " Cont'.=aeteQT.Tha with3 Con:pany.forJheyork..f_ gy-ce-parties -entering -into-e-contract---- -- - . d _. '. _ : _ 6_ a + .s l.6_ " Engineer"a_... Company?s_'Vice President-Engineering or his ~ ~ ~ ".. ~ ~ ~ ~ - ho~rl:e~~d~ representitive. " ~ ~~ ~ ~ aut I ^ ~~ ~ UciEi$adon~": IIoc:pany's Specification which includes the "S 1.7 General Conditions, the Specific Conditions, the Proposal Form, and any addenda. 1.8 "As Directed", "As Recuired", "As Permitted", "Aeproved", " Acceptable", " Satisfactory", or similar, terms shall.sean by or to Constructor. ~ "*'ork" : Labor, materials, and all requirements hereunder. 1.9 a 1.10 "Aceroved Ecu1 valent": An item approved by Engineer as being acceptable to Co=pany as a substitute for a specified ites. 1.11 " Erector": Equipment manufacturer's duly authorized technical advisor. s 2.0 PROPOSALS 2.1 Form: Proposals shall be made on the attached Proposal Form. The Proposal shall be enclosed in a sealed envelope distinctly srked " Proposal" with the title of the work as given, and delivered to Co:pany's Ma:tager of Purchasing and Stores, 77 Beale Street, San Francisco, Califor-nia 94106, at or prior to the hour specified. Late bids will be subject to disqualification. 11.250:1 GC-1

4 '

t. Ginarelecenditions c 4.0 INFODIATION TO BE FURNISHED 4.1 Infer =atien With-Precosal: _ Sidder is requested to su':._it with - his Proposal the folleving infor ation. -Excepting Paragraph 4.11,.the-infor=ation should be shown on Bidder's letterhead: 4 4.11 Infor=atica required by the attached Insurance Questionnaire. 4 4.12 Any proposed changes in the.specified Schedule;of l Construetion. In' the. absence of such proposed changes, it will be - ...__ assumed _that_31dder_. accepts _and.will comply _with_the_specified Construction Schedule. i a : :~ d4E.-32.7EEsquested[informmHon in regard..to the plant and i, --equi,.y.-wt11ch9idderd=. trads2 tome--in the work.' 2 - f - -- - ..e ~ < *. v. _ **af - - m es. tor eenetruetion.equiprent, w.th e value

,__.$50 'er.Asre",f1iridch~lidder expects to use in performance of the

' '." zf l i 1sork. Such -zares.. vill be appHeable for we ofsuch equipmenDn " ' ~'

.c-jQ___4 of w required =estW work and shall be quoted.in j

accordance with et:he provisions of Paragraph 31.0. ' Rates shall be .:.--.._.=. ... n -A-.. =. y,-a-r. wn ? -- - - ---- - - - I._ - . ____ _..-4.-141--The-bare monthly rental-rates, exclusive -of operating labor, oil, fuel, grease and cost of servicing and maintaining the equipment. 1 4.142 The hourly fueled and maintained rates which shall include cost of oil, fuel, greas'e and cost of servicing j and maintaining the equipment in first class condition, but shall exclude bare. rental and cost of operating labor. + I-4.15 Any additional information required to be submitted as { listed in the Proposal but not listed above. 4.2 Infor=ation After Award of Contract: As soon as possible-I after award of contract by Company, Contractor shall submit the following l. information to Constructor. 4.21 Copies of all labor-craf t agreements containing wage rates and fringe benefits in effect at the time of the award of contract. If any changes therein-are negotiated during the term of this contract between the construction industry and the unions involved, revised copies of such labor agreements 'all be furnished to Constructor. i, _ 1

l 1

1 i l i \\ l 11.250:3 GC-3 1.

G:nsral Conditiens 3.4. Construction Drawings: As soon as possible af ter notification of award of contract, Cc pany's approved construction drawings will be provided Centractor for use in the perfor=ance of the work. The drawings issued for bidding shall not be used for construct 1cn purposes unless authorized in writing by Constructor. Cc=pany anticipates that revisions =ay be =ade to the contract drawings prior to the ti=e they are issued as " Approved for Construction" and to the approved dravtngs fre= ti=e to ti=e during the work. These revtsions are expected to involve minor changes in d1=ensicus and in e= bedded ite=s which =ay require changes by Contracter in his proposed construction methods and sequence of opera-tions. Contractor shall plan his operations accordingly to acce=odate ~ any such changes. Changes, as such, will not necessarily involve any additional cost to Centr' actor. Any increasT6r decrease ~i:I:^aterial ~ quantities.will be, paid for cr, deducted under the appropriate Centract Pricing 4cems. 4 Therm the changelinvolves an increase'in other costs to . _._ rentractezs 4ciapany5s111ipwy..fordany_:such__cos.ts..that _,are.conawred. jus _. __ tifiable by Constructoir. Compmt ahall receive credit from Centractor fer.:ny.~. rad::tfen.%i C:strictc.'s :::c:.. = ed by such th=;;es. Ecuever, Constructer' reserves the rightito be the final judge as to the a=ount of --.uy pay-wrm mada h _.I w a n ;he latts are presunted and -- - --- .- sealuacad. ( _._ _ " i ~ _. -- 4.'.__ __- t t ___ _ _ _ _. _ _ _ _. -.55 ceactor's travinns and.Soecification:.Centractor shall pre ;. para any specification, calculations, and drawings required in addition _ to this. Specification =4 _Co=pany's. drawings, subject to the approval of Constructor. Notwithstanding such approval, Centractor shall be respon-sible for the accuracy, practicability, and correctness of such specifications, calculations, and drawings, all of which shall not oper-ate to change the Specification or Company's drawings unless Contractor submits a written statement clearly indicating the requested changes and obtains Constructor's written prior approval thereof.' In the event of conflict between the Specification or Company's drawings and Contractor's specifications, calculations, or drawings, the for er shall prevail. Relative to the work hereunder, the perfor=ance by Contractor of any engineering work which is under the jurisdiction of the Calif ornia Civil and Professional Engineers Act shall co= ply with the requirements thereof.

5.6 Channes

Requests by Contractor for any changes en the requirements of the Specification and drautngs shall be brought to the attention of Constructor for written approval of Engineer. No changes will be authorized without such approval. 6.0 AWARD OF CONTRACT AND INF0FF.ATICN FURNISHED BY COMPA'iY 6.1 Award of Centract: All sork perfor=e> subsequent to the award of contract shall be performed in accordance with the contract. 6.20:6 GC-5

I Ctnergl. Conditions to constitute infringe =ent, Centracter shall, at his sole expense, either procure for Cc=pany the right to continue such use; replace the infring-ing ice = with a neninfringing ite= satisf actor / to Cc=pany; =odify such ite= so it becc=es neninfringing; or re=ove such ite= and refund the applicable portion of the contract price. 9.0. RISK OF LOSS OR DAMAGE TO WOPI 9.1 Until the work is ce=pleted and accepted by Co=pany, the risk of loss or da= age to the work and =aterials shall re=ain with Centracter, except as otherwise provided in Nuclear Insurance and Inde=nity, Para-grap~h 32.0 of the General Condi_tiens.. follow:.ng... No._da= ages _or extras. _-_ ~~ - '~ ~ wil1 be allowed for unforeseen difficulties or obstructions. 10.0 HODIFICATIONS,, ASSIGNMENT,.AND NDTICE. w~ = = - ..=L-::_.;= -= A.:-- -.-. 4 ^10.T MeaifIcatien'si Y5,..-isien cf the.centract shall 3 a dee=ed .... =cdifiad~ trXr:4.by_;p's=--1.uout the prior written consent. cf Cen-structorC'W-tyral~ 'srata=enCshall in any manner modify or otherwise af. fact Zhe

  • arimL.ano 1:enditions set tortEEerein.

~ ~ h Y' .y ~..m.-- ~ ~ _-Q ~- w '3D.2, Subcontracts and' Assign =ent: Contractor shall =ake no sub-

-contract ;or-other_. assign =ent-hereunder.without' the prior-v "::en. consent -

of to=pany, and when consent is, granted, it shall not relieve Contractor .cf-any.cbligation-to Co=pany hereunder. -Provisions of any subcontract which are in conflict with this contract will not be recognized. Nothing contained herein shall creste any contractual relations between any subcontractor and Cc=pany. 10.3 Notice: Any notices regarding =odifications or assign =ent given.by either party (Co=pany or Contractor) to the other hereunder shall be dee=ed to have been given when stated in writing and deposited in sealed envelope in any United States Post Office, registered, postage ~~ prepaid, addressed, if to Centractor, at the address given in his proposal and, if to Cc=pany, as follows: Pacific Gas and Electric Cc=pany Vice President-General Cons cruction 77 Beale Street San Francisce, California 94106 r 11.0 BOND 11.1 Bond Recuire=ents: If recuested by Cc=pany, Centractor, within five days of such request, sh al.' bcain a pay =ent and perfor=ance bond in the a=ount of 100 percent of the contract price, in a for= and with a surety acceptable to Cenpany. Cc=pany will rei= burse Contractor for such bond separately, within 21 days of receipt frc= centractor of the surety ce=pany's invoice therefor. 6.20:8 GC-7

+ Gtntral Conditions 13.22 Nonauto=obile: Unless Cc=pany elects to purchase such insurance as specified in Paragraph 13.3 following, Centractor shall =aintain, and shall be responsible for any subcontracter to ~ =aintain, during the perfor=ance hereof, nendeductible insurance for both bodily injury and property da= age liability (other than automobile), na=ing Contractor as the insured and including Co=pany as an additional named insured, insofar as work done under this con-tract is concerned, and including a cross-liability clause. The insurance a=ount shall be not less than $200,000 for injury to or death of one or more persons as a result of any one occurrence, and not less than $200,000 for da= age to property resulting frc= any nne..occu ~ence.__Such_ insurance shall..be satisf actory_tio_ Cc=pany and shall contain an endorse =ent incorporating by reference and making 4,part-of N em en*'s policy mr.pnH r* a=.all: the insur: pgres=ents7 exclusions; and conditions of the broad for= comprenen-aiie Liability speM===-policy contained-in the anster insur=-re._ progran, furnished %ontracter. If Centractor n any subcentractor . naine.minneta.onal.mmouncs. ~ol insurance prot.ction',' Contractor m. '.shall act 7eliariLre tittis contract.the' cost thereof for limits in 7- -exceseyi42iT0000por;anyone, occurrence. 5 =. _ a; ~ ~ 13.23' The-insurance covered by Taragraphs 13.21 and 13 22 _u- -.-above -h11 M - 1a**.in-nature.___: - -13.3-Company'1-Election-to'-Place Insurance: Cc=pany shall have the right, if it so elects, to purchase for Contractor work =en's compen-sation insurance as provided for under the = aster insurance progra= and the specimen policy attached hereto or the bodily injury and property damage liability insurance as provided for under the = aster insurance program and the spec.1=en policy attached hereto, or both. However, for the insurance specified in Paragraph 13.2, Cc=pany shall not be obligated to purchase limits C ' ess of S200,000 for any one occurrence. 13.4 Sub contr- ,t surance: Co=pany shall also have the right, if it so elec; archase the sa=e insurance with the same 11=its for any subconciset:.c aho, before the subcontract is made, has offered to perfor= verk at une work site. To facilitate the latter, Contractor shall negotiate all subcontracts to provide for such election in the manner set' forth in the master insurance progra furnished to Con-tractor and shall prc=ptly provide to Company, for each subcontractor, before the subcontract is executed, the insurance data specified in the subcontractor's insurance questionnaire (a sa=ple for= is attached to a the Proposal For of the Specification). 13.5 Cost: Any insurance

ranged by Cc=pany shall be in the for

specified in the speci=en insurance policies appearing in the = aster insurance program furnished to Contractor. Cc=pany shall =ake electicn a to purchase insurance for Contractor or any subcontractor known to Con-tractor, in writing before the contract or subcontract is executed. If Co=pany elects to purchase such insurance: 11.251:1 GC-9 4

i' G:nbiti Conditions 13.7 Insurance Procedure: A party arranging for insurance hereunder shall furnish the other a certificate of Work =en's Co=pensa-tion Insurance evidencing that the policy of insurance arranged is in full force and effect and shall furnish copics of all Bodily Injury and Property Da= age Liability Insurance policies arranged. Such certificate and policies shall provide that notice vill be given to the other party 4 at least thirty days prior to cancellation or substantive change in the for= of such policies. Co=pany shall have the right to inspect the original policies of such insurance. 13.8 Return Premiums: Any and all return pre =1u=s and dividends s --for--the --insurance -specified-in-preceding-Paragraphs -13,1-and 13. 22-shall be payable to Co=pany if Co=pany elects to purchase such insurance. , y _.. _.... ; -._ 14,0.CLADI ST.CONTRAC'IGR TVE DAEGES - - ~~ -~;;; .;:y.~..:.,u:. ?-. a. '.5 R~ ~ ~~~~~&h ~**" ~' ~ --' ~ ~x.;4If Terrmeter M-= ~ - 1L1 extra co=pensation or time from Co pa=y pune:au:-+ m ~yfrwa e em e t --. or-1=terpreran m of the contract ._3racAart._acgon_ow thei sacaf_C.w. Cent::acter _shr.11 sub=1;_to_ _Cgn._. 5_structor a'.writr.an wtzwmase supporting the clai= within thirty days of "theized.cn lar ~ 4WiliEEg. rise to 'the ~ claimed ^da= ages.' Contractor's j failure to so sub=1t a statement within said thirty days shall constitute

r. _rc
. -.- _Twalvefrof hheEahi. - Cbis.ctor -shall understand that a general -scate-

=ent of his intention to ake a.clai= will not satisfy Co=pany's - - ~ requirement Tor supporting the cla1=. Contractor shall be specific regarding what his clai= 1s for; what equip =ent, =aterials, labor and everhead are affected, and he should give an esti= ate of the a=ount of the cla1=. Contractor shall currently sub=it to Co=pany all pertinent cost data relating to such a claim as it develops, including payroll, equipment rental, =aterial used, and any other infor=ation which relates to or affects the proposed clai=. 1 15.0 LIENS 15.1 Contractor shall discharge at once all liens which may be filed in connection with the work, and shall save Ce=pany har=less there-fro =. Co=pany may retain frc= any pay =ents due under the contract sufficient funds to discharge any delinquent accounts of Contractor which liens on Cc=pany's property have been or can be filed, and Compary may at any time pay therefro=, for Contractor's account, such amounts as are admittedly due thereon. ADMINISTRATION OF CONTRACT 16.0 COMPANY'S REPRESENTATIVE 16.1 Control: Company's representative in charge of administra-tion of the contract shall be the Constructor. Constructor shall control the work as necessary to insure satisfactory co=pletion in accordance with the terms of the contract. 11.251:3 GC-11 a

Gencral Conditions 18.0 INS?ECTIONS AND TESTS i 16.1 Co=pany shall have the. right to =ake both field and shcp inspections and tests. Company's inspectors shall have free access to the work at all times. Neither the making nor the failure to make such inspections and tests by Company nor the express or ir. plied approval by Company of any part of the work shall relieve Centractor of the respon-sibility to cc.plete and guarantee' the work as specified. Rejected work 4 shall be re=edied as directed by Constructor at sole expense of Contractor. 19.0 DELAYS AND SUSPENSION OF WORK 19.1 Suspension of Work: Constructor may suspend the work or delivery.cf materials for causes mitich Constructor considers to be ~ sufficient.-. ; ; NE.~.H J- ~ - . - - - = - - -. _ ~...... - 4 19.2 Delivery -of Materials : Delivery dates for materials to be ~ ~ suppliaddry.others dizaculy nr zazough fry have been sch=Aa1=4 to ~ ~ 4hter suff9 r- *'== for ina*=11 ="4 r= _in. < r==14==> = with _._ _ the ipecified.Sh b of teostruction. n...._...> . _19.3 ' Notification: } Contractor,shall notify Constructor promptly . ~ ~ - _ _. _ "' 'in~vriting upon 1snowledge of any~ impending cause for delay, and Company will ua,e its best efforts to prevent such delay. Failure to so notify ~ ~~ " Constructor as rei; Eire'd aboire 'shall constitute waiver by Contractor of ~ ~ ~ any concessions or benefits specified under this Paragraph 19.0. i 19.4 Delays Within Contractor's Control: No addittonal compensa-- tion or other concessions will be allowed Contractor for any expenses incurred as a result of delays arising from causes for which Contractor is responsible. If, in Constructor's. opinion, any such delay is suffi-cient to prevent Contractor's compliance with the specified Schedule of Construction, Contractor will be required to accelerate the work through overtime or other means, at his expense, as necessary to allow for i completion on schedule. l 19.5 Delays Beyond Contractor's Control: In the event of a delay in delivery of material to be furnished by or through Company-or of a delay that is, in Constructor's opinion, caused by circums.cances beyond l Contractor's control (except delays due to weather), Cons ructor will investigate the causes and remedies and may require or authorize any of the procedures set forth below. Contractor will be promptly notified as i to which procedure shall be followed: 19.51 If, in Constructor's opinion, the current progress of the work is satisfactory and the delay is minor (less than seven days) Contractor may be required to complete the work in accord-ance with the specified Schedule of Construction 61th no allowance for extra time or extra ec=pensation. j 11.251:5 GC-13 swi~ i

l..

u

=. _. 1 Genersb Conditions 19.5251 Any additional supervisory, engineering, or clerical expense actually required solely because of longer shifts, more days worked per week, or =ultiple shifts per day. 20.0 TERMINATION OF CONTRACT 20.1 Ter=ination for Cause: If (1) Contractor fails to confor= to the requirements of the contract; or (2) Contractor seeks relief under any law for the benefit of insolvents or is adjudged bankrupt; or (3) any legal proceeding is comenced against Contractor which, in Constructor's, __... -opinion _.may d"FarfareJr4 *h th a p* *#e-a _of _tha _ contract;.or.(4).the progress of the work is such as to make it apparent in Constructor's opinion that.<he-work will mot be empleted wi thin the specified time-and ew ;has:reqtiestad. Contracror to take such st.eps as are,necessary - 1:cr acsomp11501 Gwirsd M--ancHeampletion/and Contractor 'has failed to do'soJCmay.may at.its optien and without prejudice to any -- acneet.riant it-may-have. ;-cake over and.complate all or.parr of, cne work 4 usinjd ont jraor?e' equipmans and facilities at the.__vork siya and, may - terminate;411..ar.:part. of geheWtract. Contractor shall be liable for - ~ any add 1* % =1= cost to-Company arising-from m y iuch ter..ination. In the event of.any such termination, Contractor shall vacate the work site of :the ' work 'but -ohall-not_ remove -any aterial, plant, or equipment r. ~ -- without the prior approval of Constructor. 4 20.2 Termination for Ccepany's Reasons : Should Company be required or deem it advisable to terminate the contract, it may do so upon written notice to Contractor. Contractor thereupon shall take what-ever action with respect to performance of the work as will tend to =4n4=4:e its claim against Company. In the eve'nt of such temination, Company shall be liable to Contractor en~1y for the 'value of the work performed to the date of termination plus costs reasonably incurred by Contractor in ter=inating his operations. Contractor shall not be entitled to any payment for anticipated profits on uncompleted portions j of contract. 3 MISCELLANEOUS l 21.0 GENERAL 21.1 Materials and Methods : Materials shall be suitable for the work, the best of their kind, and subject to the approval of Constructor. Articles or materials may be substituted for those specified by trade name,c..y with the t.ritten consent of Constructer. Installation of manufactured items shall be in accordance with the recommendations or specification of the manufacturer, except where otherwise specified herein. The methods used by Contractor shall be such as will produce satisfactory work in accordance with the best current practice. i d 11.251:7 GC-1. =: =--

Gen 0ral Conditions 22.3 Co=censation: No direct co=pensation will be =ade to Contractor for performance of survey work specified hereunder, er for any delay resulting therefrem. 23.0 SAFE *? PRECAUTIONS AND PROTECTION TO PROPERTY 23.1 Regulations and Conduct of Work: Contractor shall plan and conduct the work to adequately saf eguard all persons and property fro: injury. Contractor shall direct the perfor=ance of the work in compli-ance with reasonable safety regulations and work practices and with all applicable federal, state and local laws, rules, and regulations, includ-ing,-without-limitations,-those--of-the-Division of Industrial--Saf e ty 4f the California State Department of Industrial Relations. All personnel shall wear -spprwed "hard bats'Lwhen,ac the work site,except.as iney be .t-. .. -. otherwisa M *+-d by: Cemetructor. Work.is areas adjacent to electri- _ggg ..,g v in d m W % g 's' established aafscy. rules and as directed by Constructor. Cc=pany may . require C = -- 7aherveeressanable safety pracautions in addition _zo _those_ininaa'aar. groposed -hy he-=r*cr.__Neither the_giving_ of._2uch special 'instructionsi by'haanycnor.the Arance thereto by Contractor ~ ~ shall" relieve Contractor-of-che sole responsibility to anaintain safe and efficient working conditions; 23.2 Identification Badges: Contractor shall supply and require its employees to wear a distinctive, visible badge of identification while on Company's property. Insofar as practicable, Company will require Contractor's employees to use one entrance (as designated by Constructor) in going to and from work. Contractor's guests and visitors will be required to secure a permit from Constructor at the work site to enter, and will be logged in and out of the property with the permit being retained by Constructor at the time of logging out.. Contractor's employ-ees shall not enter electrically energized equipment areas or other areas out of construction limits except when on official business or with the express per=1ssion of Constructor. 23.3 Additional Precautions: Should Constructor request that Contractor provide certain safeguards not in use but dee=ed necessary and should Contractor fail to comply with such request within a reason-able time, Constructor may provide said safeguards and Contractor shall rei= burse Company for all expenses resulting therefrom. 23.4 Protection of Floors and Valls: Contractor shall protect all floors and walls from injury and discolorations, due to exposure to cils and other discoloring agents, during perfor=ance of the work. Any m jury or discoloration shall be repaired at Contractor's expense. Such repairs made by Contractor shall be subject to the approval of Constructor. 11.252:2 GC-17 r .o .-n

I G x r:1 Condi'tions 27.0 FII' D CONDITIONS : VISIT TO WOPI SITE 27.1 Work Site Conditions : It will be assu=ed that Bidder has visited the work site and that the proposa1 is based on a full knowledge ~ of all conditions that would aff ect the cost and conduct of.the work. Bidder shall infor= hi=self fully as to the physical conditions at the work site, including as applicable, subsurf ace geology, borrow pit con-ditions and spoil disposal areas ; the availability, location, and extent of construction and storage facilities and other facilities or structures above and below ground; necessary safety precautions and safeguards; dimensions not indicated by the drawings; the extent of established lines and levels ; work to be, perfomed_ by_ Co=pany_or caha m; _all.-rules, regu- ~ 1atibns an.d requirements to be observed by Contractor in the conduct of the work.,, .., y 7 -: 27.2. Visit to Work -site:--By-appoim,nent, Consta.a vill con-duct Bidder over the vort site n=d will indicate the various features of the work n=d no-d'-inn.s D.h.: encountered and supply Bidder with any avaiSb'J2 seful'*infcr=atictif ~ 28.0 '.MATEPmh_7ACIk.T*1"ES T SERVICES, AND STRUC*UPIS FUPSISHED ~ ._ J8.1_JLdecunev and Safety: Contractor shall inspect. dece=ine ' ~ - - to his own satisfaction, and be solely responsible for, the adequacy and . saf ety of materials,. tools,--equipment,. plant, te=porary or pe =anent structures incidental to the work, storage or office space, and any other facilities and services used in the work, whether furnished or constructed by Co=pany, Contractor, or others. Any drawings of such structures fur-nished by Co=pany shall be deemed to show mini =u= require =ents only and shall not relieve Contractor of any responsibility. 28.2 Company 's Ecuic=ent: When Contractor is pemitted to use Co=pany =aterials, tools, facilities, or equipment, he shall maintain such in first-class condition and good repair. Contractor shall be responsible to Co=pany for damage, misuse, or loss thereof. 28.3 Contractor's Ecuipment: Tools, equipment, and plant pro-vided by Contractor shall be maintLined in good repair and efficient operating condition, and any which are dee=ed by Constructor to be unfit shall be re=oved from the work site and replaced by Contractor. 4 \\ 11.252:4 GC-19

-. - ~ -~ Gcncral Conditicus I '9.6 Withholding Funds: Co=pany =ay retain from any payments due hereunder sufficient funds to (1) discharge any delinquent accounts of Contractor for which liens on Company's property have been or can be filed, and Company may at any ti:ie pay therefrom for Contractor's account 4 such amounts as are admittedly due thereon;- and (2) repair or replace any work deemed defect.ive by Company. 29.7 Claims Against Companv:. The acceptance by Contractor of the final payment hereunder shall be deemed a waiver by Contractor of all claims against Company. ) . __. 29.8._Liab111ty:__Naither.. acceptance _of the work _by Company.nor pay-ment therefor shall relieve Contractor from liability under the inde=nity I or any.nf.tha guarantaes ~=M in or. implied by zhis conevar e. ,.... ~.. : ~ 30.0-- AIEITIUEitiUINSN' 4>- l 30.1. C=ce=ct"~Chaisis ocasca: Company,may requ1re Conzractor to parfaza.adMM==1.wozk.af.a.natura.similar. or related to the work pro- ~~" ~ I "vidad~for inr the,contamat erTa~ny require chassissi 1:Ithe' work o~r~1n'thi l - provisions g6m'4~ gh:he%ork: -Additional work 1er changes shall be per-i formed by-Contractor only when authorized in writing and signed by I. --

Cw u.m = = :.=: :: ?.
u. =.

m- ---30.11 -No -eubsequen't claim-will be honored for intangible affects or time lost result 1ng from work covered and paid for by } change order. The pricing shown in the change order shall include all indirect or intangible costs. If a satisfactory negotiated l price cannot be agreed upon for changes, additional work, or claims,. j Company has the option to pay for all or any part to the disputed i work strictly in accordance with the terms of the cost-plus provisions, regardless of amount. ~ 30.2 Increase in Work: Change orders that require an increase in the work shall be priced, at Company's option, on a lump-sum basis or at contract or other unit prices or on a cost-plus basis. [ 30.3 Decrease in Work: Change orders that require a reduction in the work shall entitle Company to a credit of either an amount agreed upon' between Constructor and Contractor or an amount computed on the i basis of contract unit prices for such work. t l 30.4 Work Subcontracted on Cost-Plus Basist All additional work i 1 or changes authorized to be subcontracted on a cost-plus basis shall be l performed in accordance with the provisions of Paragraph 31.0 following. Contractor shall negotiate all such subcontracts direct, and no subcon-l tractor shall further subcontract any part of the work. i 1 } i i l 1 11.252:6 GC-21

)

G:nr.r!.1, fondition's 31.12 Materials and supplies actually consu=ed in the work including sales or use taxes thereon and the transportation thereof, all at actual cost, less trade but not cash discounts and less the fair value of =aterials and supplies salvaged and retained by Contractor. ~~ 31.13 Prorata a=ounts of pre =1c=s for the insurance required in Paragraph 13.0 foregoing but enly up to limits of $200,000 for any one occurrence for the insurance specified in Paragraphs 13.21 and 13.22. Premiums for other insurance shall not be separately reimburs able. 31.14 Incidental direct costs to Contractor arising directly from performance..of the work _harannder, prev.ided they are. approved in*vrMng; ty Icastruernr,. .-_.-._._..c. _ ~ _ _ -~__._,.,..... 31.13.A fee equaltto the percentage stated in Contractor's , proposal of.the rotal.cf 2aragraphs 31.2.1 through 31.14 above to cover among other %g= profit,. superintendence, field office per- -- -~ --~ ..ioniel, overhead,. rental cbEges fcFase'~of fools aEd eqEip= sat-~ - ~' ~~ ~ valued;at. lass:=han $7.50 each and.nll-other general and indirect expense. 31.16 Rental charges for use of Contractor's equipment valued at $750-er more -each at the-rates submitted by Contractor with his Proposal. Such rates shall be the type of rental rates specified in Paragraph 4.14 of the General Conditions. For any rates required but not included with those sub=itted with Contrac-tor's Proposal, reimbursement shall be either (1) for bare rental at rates not in excess of 75 percent of the' rates set forth in the current edition of the "Cc=pilation 'of Rental Rates for Construction Equipment" published by the Associated Equipment Distributors, plus fueled and maintained rates as =utually agreed, or (2) fully oper-ated and maintained rates as =utually agreed all as provided in Paragraph 31.5. 31.17 Cost of transportation to the work site and tro= the work site to an agreed destination including loading and unloading of equipment not self-propelled or readily =ovable to the extent that such pay =ents have not been reimbursed directly or indirt.ctly under other items of the contract. Transportation limitsd to locations within California. + 31.18 For approved additional work perfor=ed by a subcon-tractor, including s...:entracts for rental of equipment valued at $750 or more each, Contractor vill be paid the subcontract anount plus a fee as set forth below. This fee shall cover Contractor's profit and all expenses incident to administration of the subcon-tract. However, the fee shall not apply to rental of equi;=ent from subsidiaries of Contractor, from his partners or co-adventurers, or fro = their subsidiaries. In addftion, all subcontractors shall understand that if they are permittud to resubcontract work, the fee payable for extra work or changas resubcontracted shall be limited to the following a=ounts. 11.252:8 GC-23

Gentrol Ctnditions 31.32 Amounts paid by Contractor for repair or replacement of defective work or costs of material vasted due to careless work-manship, or cos ts of any wor.k performed which, in Cons tructor's opinion, is not necessary for the performance of the authorited work. 31.4 Data Recuired: For all cost-plus work, Contractor shall support invoices for payment with itemized receipted bills for material and subcontract work. Contractor shall sub=it certified copy of payroll covering all labor employed by Contractor and by subcontractors perform-ing work on a cost-plus basis. Satisfactory evidence shall also be submitted to verify materials drawn frc= Contractor's stock, rental of -- - Contractor's.4quipment,-and-other miscellaneous ite=s.of cose not otherwise verified. . - - t t-31.5 Iquipment Rental: 31.51 Bare Manthly Races: 3 -.-., - 7 _ ..y 175.11 Bare mentbly..=ates;shall exciude.operat _.. -3 ing labor.ocil. -fuel, grease,,and. cost of servicimg and . main *y"s;theequipment- - -T.322 Equipment available~ at the work site and used for incidental cost-plus work will be paid for on an, hourly rate based upon the actual hours (including overtime) used. The hourly rate shall be 1/176 of the quoted monthly rate. 31.513 If Company makes a written request for Con-tractor to hold certain equipment at the work site especially for cost-plus work, compensation for standby time will be 1/352 of the quoted monthly rate for the hours such equipment is not used during a 40-hour week (or 1/2 normal rental rate). This Paragraph guarantees Contractor reimbursement for at least 40 hours per week at one-half normal rental race. 31.514 If Company requests Contractor to furnish special equipment not on hand at the work site for use on cost-plus work, Company will compensate Contractor for cost of moving such equipnent on and off the work site. Co= pen-sation for rental of such equipment will be 75 percent of the rates set forth in the latest edition of the "Cc=pilation of Rental Rates for Construction Equipment" published by the Associated Equipment Distributors. If this equipment is used for less than one week,.an hourly rate equal to 1/8 of the daily rt..a1 rate will be paid up to the amount of the weekly rate. If such equipment is used more than one week and less than one month,, an hourly race equal to 1/40 the weekly rate will be paid up to the a=ount of the monthly rate. If the equipment is used for more than one month, an hourly rate equal to 1/176 the monthly rate will be paid. After the first month on the work site, the hourly standby rate v:.11 be 1/352 of the monthly rental rate. 11.253:2 GC-25

8848.., General Conditions 32.3 Indemnity Agree =ent: Ccepany will enter an inde=nity agreement with the United States Ato ic Energy Co==1ssion as provided in See:1on 170 of the Atomic Energy Act of 1954, as a= ended, and the provisions of 10 CTR, Part 140. 32.4 Period of' Insurance: To the extent available, the insurance and indemnity arrangements to be obtained by Company shall continue in effect for such period as may be necessary to cover liability arising out of or resulting from the equip =ent, material, and/or services fur-nished pursuant.to~chts contract. Contractor shall be provided, upon . __.reques t, with_ evidence, that the Company. has. eutared.into the insurance and indemnity arrangements outlined above. 33.0 IMERCENCY VEHIC.E. - Q - ..:.~ --.'._.. 33.1' If:an emergency vehicic is previded for transporting seriously injured project. personnal;.to medical facilities, Contractor shall have ...available specifically assigned workmen who are qualified to drive the ~;J - -,;iehicl~i and t2 car 7eo{rh~.iEfuraE 15 disin of emergency- - - ' ~ 33.2 Additional Requirements : Nothing contained in the Speci- ~. - fication shall relieve Contractor.from providing and maintaining all stretchers, blankets,11rst-sid,1natorial and first-aid kits as required by -any applicable safety order of the Division of Industrial Safety of the California State Department of Industrial Relations or as required by any other federal, state, or local laws, rules or regulations. M e 0 9 e GC-27

l e Pey. - af c'esameracy eo... O v.P incwans' a.eger newease 1. we,sim ene seek,.ymeme um O comer:4c.o. ov,, C osvesson w a-..aa ,,,,,,g w in,,,, ^ '" CON 7R AC7 F0E g w pena, e.e a name== e. ) 46 4[ctr. oon. 3.. aeu===cs a PERpORM ANCE OF WORK l CD8ffmaCT 8WI 1 !' i,ec, s._,,,,_ 884 8 c -meen me

a. son,ase.,

====***wa****' i O i.e e,s. O ce=== amps. m herensiter enMed Casernesor, uni PACIFIC GAS AND F.LECTRIC COWFANY, a Cauforess eerpernasen, herummiser enued Com-pmay, hereby agree as foBowe. Cameractor ohna at his own risk and.p= perform tk work hereimalter desenbad and, eacept as herois oeherwise provided, ahall furnish a5 leher, agumpenet and maeanale required thereior : J,.. w., -

r. -

l Amy lueesen, drowisse, - - er enhor meernal ammamed havese er to shes he desmead a part herest j


Casesessenhet aussemensew' innees1.ashan-dienseed es de se and ehes asepises --

'!"sume le of the ensamme. Campmar has demand to peruhase for Cameressor the laserames :, 0 A. ' - . and pese as fauswes of the =r=='- h For the inseresse speciand is paresreph Preyny Damase I.hhility-. For the iussrumme that Comenny has endeted to purchase r, pa - for the performasse of the, erk x of the ; "--_ In===p=ase O de heemnder shmR be redesad is esmordamse with pa sedmassa, the ionowing premium rease por $MD of payrol be n;" * : Werhane'e C_, -- h -:::r's signed tes. a.dne Islery ' ' "":,- M ty== O j O \\ As full emmenderation for the perio kr,o f, l-g-4.~ PACIFIC GAS AND ELECTRIC COMPANY Emace ed this ._ day of , 39_,,, !ay l CONTRACTOR I._ l ay.

1 S3 123 . INSURANCE QUESTICNNAIRE., m Paci"ic Gas and Electric Cc=pany Specification Number 8848 i A. Name of Contractor B. Address of Contractor C. Contractor is a: Corporation. Partnership, Proprie torship D. Employee Responsible for Insurance E. Insurance Broker F. Contractor's Insurance Carriers and Limits of Coverage: 1. Workmen's Compensation Insurance: a. Workmen's compensation carrier j b. Workman's compensation policy number c. Workman's compensation policy-period. 2. Automobile Liability Insurance: Limits Bodily injury liability M ar.- a. I.imits b. Property damage liability carrier 3. Liability Insuran-:e' other tham Antomob11er-- - Limits Bodily injury liability carrier a. Limits b. Property damage 14 =h414 ty carrier -G. -. Estimated 4 rose 74=1 A *=yvn11 Amount to._be_ Expended by Contractor under this Contract: 9 Rate Information: H. Show the premium races that would be charged the Contractor for limits of $200,000/ 1. $200,000 bodily injury (excluding' automobiles) and $200,000 property ifamage

)

(excluding automobiles).~~ Coverage is to be en a non-deductible basis. Bodily Iniury 7 ~~ 1,imits Rate /$100 Rate on any other Basis (excluding automobiles) $200.000/$200,000 of Payroll Race Basis a. Operations, N and C b. Contractor's protective c. Contractual d. Completed operations Total Property Damate Limits (excluding automobiles) 4200.000/S200,000 e. Operations, M and C f. Contractor's protective 3 Contractual h. Completed operations Total Total Bodily Injury and Property Damage If the race quoted above by the Contractor is other than the regular rate charged l 2. by his ragular carrier, the Company will require a copy of the underwriter's letter l of intent to insure at the race quoted. CS Yge (parcent or amount), if any, made by the contractor's insurance carrier for ) 3. I including the Company as an additional named insured by endorsement to Contractor's insurance policies. 1. Additional Limits of Liability Insurance (excluding automobiles): l If Company air. cts to place the insurance, the Company will, if able and if Contractor desires, obtain limits in excess of $200,000/$200,000 bodily injury and $200,000 i property' damage for the Contractor at the Contractor's expense at the race available to the Company. Indicate excess limits desired (if any): Bodily injury (excluding automobiles) /$ Property damage (excluding automobiles) $ /$ .7. If the Contractor ha.s a properly filled out insuranca Questionnaire, if copies of the in rate or form has required policles are on file with this.. Company and if no change occurred since such information was filed, he need not submit the above information; he shall include a stauement to this effect on hiJ proposal along with the estimated -_ _unt_ ef cavroll to be expended under this Specification. am,

$ e 8848 Proposal Page 1 of 2 FINAL PAINTING DIABLO CANYO UNITS 1 Al"D 2 PACIFIC GAS A'O ELECTP.IC COMPAM* PROPOSAL 1972 c. Manager of Materials Department Pacific Gas-sud -Electric-Company-- 77 Beale Street San Francisco, CA N106 y - __.,. ~ Having carefully examined Specification No. 8848 and the drawings for the Final-Painting r _Diablo Canyon Units.1 and 2, the undersigned agrees to execute a contract to perform all work set forth in and in accordance with the Specification and accompanying drawings and to accept as full payment for said work compensation established by the unit prices and lump-sum amounts set forth for the various ite=s listed in the pages of the pricing schedule follow-ing. Prices are exclusive of surety bond cost but include all taxes incurred in the performance thereof. The prices quoted in the pricing schedule are based upon all compo-nents of the equipment and/or material used in the work having been produced or manufactured in the United States. It is understood that we may also submit a separate proposal based upon use of foreign components provided (1) we quote an alternate price for each proposal item affected, and (2) we submit a detailed list of all foreign co=ponents contained therein. For work performed by Centractor or subcontractors on a cost-plus basis in accordar.ce with Paragraph 31.0 of the General Concitions, the fees are quoted in Item 10 of the pricing schedule. It is understood that many e of the items of reimbursable cost set forth in Paragraph 31.0 are normally considered as overhead, and therefore, the fees quoted are a minimum. It is also understood that all fees quotead will be an important factor in determining the award of contract. 6

s e i 8848 Preposal Page - For extra work perforced on a lump-su: cr agreed price basis, we agree to sub=1t for Constructor's approval, if requested, a co=plete price breakdown in accordance with Paragraph 30.6 of the General Conditions. For such work, the amount included to cover Contractor's and subcontractors' fees on the ite=s listed in Paragraph 31.0 vill not exceed that allowed by the fees quoted in the pricing schedule or the fees specified. For surety bond, if required, Cc=pany will pay the actual pre =ium cost thereof. The undersigned sub=its herewith the infor ation required by Paragraph 4.0 of :he Senaral Cond.ir.icus: - 1. Any proposed -change-in-the construction schedule. 2. A. list.of proposed construction plant items. ~~~ ~'~3."The ni5as an6 liidrasses of all prop 6sied subcenc actors. " ~ ~" ~~ ~~ ~ 4 Insurance Questionnaire and "F. aster Insurance Program." 5. Equipment rental rates for equip =ent valued at $750 or more each: (a)' bare, and (b) fueled and-maintained. The Specification is signed and returned herewith. The undersigned agrees to complete all work included under this Specification in accordance with the construction schedule set forth in Sec-tion 1 of the Specification. It is understood and agreed that no extension of time for cc=pleting the work beyond that specified in said construction schedule will be granted in case the actual field quantities of work exceed the esti=ated quantities that are set forth for the various items in the foregoing pricing schedule. The undersigned hereby certifies that am/are licensed under Chapter 9 of Division III of the Business and Professional Code of the State of California; the number of the license is and the date of expiration is 4 Name of Fir: Address Phone Signature of President of Corporation Signature of Secretary of Corporation Corcoration is organized under the laws of the State of SEAL

,,.e 1 i 3170 8848 i PRICING SCHZDCI.I -1;g ESTIMATED FRICING UNIT NO. CI.ASSITICATION OF idDeK QU M ITY UNIT PRICE I 1 Construction building (Paragraph 5.23, Section 1 and Paragraph 1.3, Section 3). L.S. '2 Fees on labor (Paragraph 1.215, Section 3), size of crew to be determined by Constructor. (Crew = 1 job f oreman plus woriamen.)- -- Average Crew Per Meath - ..~ - .i Up to 6 meni*fN$'d.",- i *b )~'" Tercant A. B. 6 to-10 man.- b c..:g;- .y.: 2e Percent ' ~. C. 11 to 15.2en. T i Eercent D. 16 men and over. Percent 3 Fee on materials (Paragraph 1.216, Section 3). Percent 10 Fee on incidental force account work in accordance with Paragraph 31.0 of the General Conditions. Percent The fees quoted above provide for the following field personnel: Bidder to fill out. Superintendent A. Full time, or B. Part time hours per week, or C. None g Clerical Personnel A. Full time, or i B. Part time hours per week, or C. None i I

~ k. o* i s. -,: g - .v 8848 Revision Index SPECIFICATION REVISION I.NTEX Page'No. Rev. No. Date Page No. Rev. No. Date Page No. 'Rev. No. Date Cover 1 7-14-83 2-2 1 7-14-83 f 1 v. o o ee .a 6 H e e e b O e t M 4 d. t $ h 1 i ? r i n E .h [ f f a s 1 ,(- 4 ) s-s I r F I O r i i 4 J

  • Denotes revi,sion 1

. j.

    • De. notes addition-

/,

      • Denotes deletion i,

m e 4 4 i. i \\ .s "}+ s -.Li. m. ,s, .-.....r..- ...~ - - - m - -v-s w. e ,-v + .mr-w- .s,--gr e

ggsg ?ainting w~ . ~. -- heisionFC* , s.. v urfaces Primed s to finish +. Surfaces: materials prior ed of Primforeign weld ) Cleanin all containing and radiation to remove and Field surfaceOther conditions ces A.. 2 22 cleaned surfa h to theSection 5 atmosphericgrinding smoot be in Exterior k.. shallcoat applicat o. with latte : subjected to r ce l '**2,3,yeld_Sy ccordan ved by isha1L e comoappliedushing. ~ shall -be and in a m wplatters thartwe J b contamubiationape ial coatingmasied by yire icals deep urfacesase,1tud chem go ges,ing. ls u alvanized steeoil, dirt, gre be' cle t c s welds, cre ice,ich coa ser:fabas. shall v k'7'- a then dditional zin -rcoating. e 4 coated asd orolvent;to Teno ., ~ ~. Noncontinuous ve be filled with aved prior . le'aned and ~ ,, y~ 25mc ~ to 23 c rags. degreased with sdry with clean remo be sha l shall coated shall sand to pro l be v ints pitting, and jo surfaces ces to bece preparation. iron-f wiped 5 e u on urfa deposits steel s surfa a to ^ ') Any be blasted withrecommen Prior co d smooth a Stainless"TuTtFer he ces. q. ssed pr1or"To 2.4 ~~ shall f.R;.:. clean ve been groun and (anchor pattern) ces .- * )y g degre Surfa ha s ver ,, r :*.: 2.41 will cedure applied oall weldsved by others. Ch gouges, der ,..N'., : Pro 0./'t12:3 the profileshall be o er ing,been rem s . q-cation of coatwill ha ure to Stronwelds, cre ice, Prim v ve by others.

  • y spatter uent os centinuousbe filled

.f E ~- t$' Fra Non ~ 2 42 2.41 shall cure as Paragraphpitting, and jo ints wed to clean o ~ allo be sontv: shall shalland no gre be crete _a_nd_Ma All surfacesAll sas urfaces Wate '.,f 25 General: coating. de ice. agen-

  • +

Con v moisture testingunds, fo release ,it' w as lo days before f.9.i. '~h M;}, 2.51 be content shallmeasuredsealing comp , [ s 30 by a urfac c :;.Wy n;.:-.;g-~ Moisture least ved. s for be che ked o cent asum lations,ll rem found, and shall c be 15 per be u sha

coating, cc ies shall grout aother impurit ce' Prior toAll surfa ces Con Te~ broken pen, if surfa dirt an '

crete o ved. remo sandpaper. be fil' remove 2.52 i~a'Ul shall shall urfac be and thes 'slaitancesimilar to fineand v the is, e s flush with coating water rfe others, texture and other imped struckro in t / / a an before waahed with cle have c air pits, holes, 100 anwed to dry tho ulty mortar joater u Filler 10 fa loose m . Mineral allo All All by vacuuming. shall ete Block:by other.ved be s Concr d remo ved and replaceDust shall 2.53 be ~ remo ved. =mo 2

1 9 1 .e PACIFIC GAS AND ELECTR,IC C O M PANY }3FI n statt sTacti. sam rnancisce. : tironnia,41:e. <4:s> 7ar.42:2. wn s;:.3::.e a7 J.O.SCMuvLER wict ents40tst

a..

. u.s...., . 4anua ry -24,- 4 984 PGandE Letter No.: DCL-84-029 ..z..u. Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Iotanission,. Region V ~ - 1450 7 aria'Eane, 3uite zw ~ - ~ ~ ~ ~ ~ ~~~ ~ ' ' ~~ ~ ~~~ Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR ' Docket No. 50-323 Diablo Canyon Units 1 and 2 SSER 21 - Allegation 100

Dear Mr. Martin:

The enclosure to this letter provides with infomation regarding testing of Carboline protective coatings used in the Diablo Canyon containment buildings. This infomation was requested by the NRC Region V Staff during a December 5,1983 meeting with PGandE at the plant site to discuss the quality control program for painting (SSER 21, Allegation 100). Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope. Sincerely, Enclosure cc: G. W. Knighton Service List

PGandE Letter No.: DCL-84-029 A,n. ENCLOSURE A.. ca m. x 044 000 I car'boIi n e. '~ r'm/,P 1 1 PROTECTIVE C O ATI N G S Fo# corrosion RESIST ANCE o W AT ERPRooreNG e rim E PROT E CTsoN e nocrisc ~ l December 13, 1983 Mr. Walter J. Prather ~~ Pacific Gas & Electric "~i 345' Mission St., Room 4A64 San Francisco, CA 94106

Reference:

Diablo Canyon

Dear-Mr. Prather-:

-- = - - - - - Carbo Zine 11, untopcoated, has been tested in accordance with and meets the requirements of ANSI N101.2 for both 307* and 340* Curves. Phenoline 305 has been tested in accordance with and meets the requirements of ANSI N101.2 for a 307' curve when Carbo Zinc 11 is used as primer. Carboline 191 HB has been tested in accordance with and meets the requirements of ANSI N101.2 for a 340' curve when Carbo Zinc 11 is used as primer. Phenoline 302 has been tested in accordance with and meets the requirements of ANSI N101.2 for a 320' curve when used in one of the following systems: Phenoline 300 Orange /2c Phenoline 302 Phenoline 300 Orange /2c Phenoline 302/Phenoline 300 Finish Phenoline 300 Orange /Phenoline 302/Phenoline 300 Finish We trust that this is the information you require. If you have any further questions, please do not hesitate to contact Carboline Company. 1 Sincerely, CARBOLINE COMPANY 2, r Duncan M. Stewart QA/QC Manager jag /l/803/ Diablo/121283 Ca m eoLIN E Cop

  • ANY
  • 350 w ANLEY IN DUST #i A L Covet
  • ST LoulS v!SSoups 63144 i

n ~... s .~ ..1.s,. .s .c. '.. i. 4.e..' f. .-.o ..g ..aw

'.. v,..

g s ~

4., d s.... u. A. M ERIC. AN N. ATION A. L ST.nN..D A R D Y.
c.,.
m..,..,..s.......,..,...

~........ ,,.... m.. ...44 -..,. ~.. .s.. .. ~...i t..,.M-V m. .. ~.. . 3...' i...g.i .. 2..,.. ..".'.c..- ....r.,..Pj. p a. . i '. 4 3.. t s ..g ... -..'...e..... r.n.

  • c.< -

....s r

9. W.R'. %. W : :

.M' r 5..Q .. s a =.. y . *

  • C M, O.
  • f,. i.? ' s -.

i .S y.. f... p --3. z , ;~. o 4 s. #...ym . c. 0 ....,... *.,/..e. s c /.,g / .4.s,.. -4.e g. ... =... . N.. .r

  • J' 8P
n. '

i .ge. a ,., - ' 1, i a.....m+ e ,... j,s..,r.: s.. 8' .e..; ..,3 ,.,......,..f,+..?..<.%,...,..,'...,...*..;.., s.

  • t

-..... i :

  • 8 e,...f

.g.. ;-.c. ..,1 ~.s,- .......t.... q P. 4.,. y...,.,e g ..a.3%...,... ,... c.v. r.,.a ,.,g {o s. .s.., v 9 L .e 1,.,g..e ;. >.4 g'.,,t,,q'.'...:.,...e**.*..r..?.3.,..,,..v,....,.>,.<.f, r s .g-......* ,...,s. .i e .s. o. ....1. F. .....4 ., A.M. %r.t ,y,..

  • a
m 6,*

. ~.o.... >.... w t .?. .w;o m. e a+ ;.,, <.. %.. : ).. V;. =.. 9, ,n +.. .. :. w y

m...

.,. e. z.e.. :.. < n m..Q..

  • W v......

+ ...,..i . 4 s.* . '..,- Q,,:,,'.a. y.m.. Www' 1 :. %. _Z... 4' s '%;/, ..~ h. .. r.... g. e......- 3 -.. a - ? ~ . oy ' ., ~.,

2..4:

.c...? s,.:,. ~,. w,.,*.,.... J.A.., :.. r ;, .. a ..:.z.....,,, i,. ~..,m.;. :.. a r.s.4.,.,,: .s. p.......s ;. .',v,.., ..c. ..u s.s..,u .L... c . C. *p a1.',* ? 9.=.%,;,. - ?..b.3...,. . ~'

  • Q=.e..:x? y..;.,.4l:,i.p.*G ".,-)..,.:

..=. * .. * ] "'. c ' W d* .;,.13:p, .n. -

.1..,.o y;;., 4.y :

a ^)F.? n.. o..: : ::...- i c ,v., -..t.. st. 2, .~. ,s. ...,s.m e v+v. s .. p

r.. F,,r. y.:<.;%. 3. :.
v.. [, g,.'
, :n.*
s f.r 7

i;. =.0.s: .a : .,+ s f. i. ..t 4 .:g-X.$;y 4. i w%.;,u..?..q' ].. 1:k. " < e-' <....+ e S -.w J.. 3. s.. i.r2, M.4, ..,.,,a..... .,.2 ...s./. ..s,...%- ... t. k,) *. t-s ~..s . f.r.c, --..*.e ...s.

  • ] w.f*.... ~. g...

..... s

4... 1.,.;,..-

y. e... e..a.- .2. m.e y,U F*!

.'%,, s *<...gw.-.o..-

g.. g .m-

    • e 4

= .*/, *. e z .. ~. s e a ...gs..&..,,. g.y. g

.e...,

<,.,.....p...2.,...a*".e.

  • '7*'. O,....
  • e...

..sp-. tn t .1; i ;..? e s:'c.W..l.e..:

  • t o
b.A
,

, -U ., '. :- ). ..,v. . 3.,..... ' ..L. - ,Ji - 4'- .. m. ?,* 3

  • ..g %- c

.a., u'.u. :. '.,. *. .\\ . l.. - e, s ,s ....xt,... =. ,2 s. ~ y<

  • ' m:P *..

. q,. ._...I ..d 5 ~ c. X 11

.it

<*T,t

3. n.

., %3 - ... 2..,.., n w., i;1..

m........ v-

.g. y .., :. t .t ?- .w,. ;,,..:.. r = . :,...n ...... g. 7 g. .n .,..., n. s 4,. 4.e,. <.....t. m...,. . g .s e. p 4 /. y'*!. P. .s..;..,...,..... 4 ....' ?. ' 5 r %.. ** L, ', '. ef.. \\...g e. p d.* 5 l. 1, q.f 4 ,f.: "' 4 C .g.~.... f ?er g l 1.,, . ), o. 2 ..,:; 9 c -.

  • 2 Y.
%.a..;

i9:_ _. E s. 9.-'. ~.. -3; a'- '<.s

  • - <a

.2 .., a-z: .. Y..c. ,,. e.,. <n .. y..;~;.. : a.. :.g.. .w..~ ,. Y...~h .t;., T..:. :' ;L,.4,,%,.3 ?- 4.

s. :..

4." Q n 1, = . '. s. .y. h '.%,5y.;:~;.N 4 ' f R b.,.; L T: l..:.. C a $ ./*: 5 .r;.f ,.1 u vs v..,~. v v.-:, 1 o s y ., u. +... .. u : :...- .?., .;-.. a... r h- : q..oJ ..4'.; @ 'N....e..:~- L.... v.

r..,,,.v.x.

..i,.c. > m..1... e v... c 1 T.. .+]$%.,. n j T V 1 f3 C.. Y.. r 1 5 a a I.

s..

u 1.1 . 2. 2,.... 1 r .J. s. au .n. .........x,.s u -.~... .c..-......., ...3.*'s' c y..; ym.. ' t .e

p.> i yl..,

m 4 g,g.%.s, a~,-, p. c.g., r,m L. "4 v. y A. t..: w.v ,e a 6 s w. .n.- .g, . v.j C'h..-.,...,.....,.._......-.,....,..,_...c.. ...n.............,,... -.. a ~....... c. ..s..,. l ........a... s n ::0J.'.!ay 30.19 ..hii.e..r.i.cali.Natio dal S :in'd. kr.'ds.In.h. iisis.

  • .*Y..'

~ ,,c. + 4, :.... ,.. 3. ).r (., c..". .....f-t .r 4. g 3. .e. , 2. s, + b. 3 q 4,

1.,

g b, o z. ANSI , x,. m.2a 971 . 9. i, k 3 T* s_= --___m

__.m. O-i e shall be prcpared ascording to the procedures prewribed by the / p.stpVRES FOR TESTING COATINGS AT StMUU.1ED coatings manufacturer. Both faces and all edges of the steel cs A coND3TIONS shat! be coated. All surfases of the concrete par:el. cuert one end, shall be coated. I>cr> effort shall be made to acquire a 4.1 f rfwse and Smpc. Following a design basis accident dry film that has the same characteristics that would be ob-tained when the coatmg was applied on a full-scaic cantain-gps A)in nuclear power plants, conditions in the reactor con-ment structure. tainment facility will be characterited by steam sir atmo-spheres at elevated tempc'rature, pressure, and ionizmg radia-4.4 Descriptmn of Test Conditions and fpparatus. tion. Water sprays, with or without chemical additives, may 4.4.1 Dynamic Elerated Temperature Presrure Test.' be used in the containment facility to suppress the incident, to Figures 3 and 4 show a typical test apparatusin which a DBA scavenge fission products,and to return the facility to near-condition specified by temperature pressure curses for PWR's ' ambient conditions. It is important that the coating systems and BWR's can be simulated with a spray solution. The ap-not deteriorate under these conditions. as the fragments of the paratus shall provide steam during the first few minutes of coatings may interfere with the operation of the spray or core operation and sha'll be brought to the maximum DBA tempera-cooling systems. A test method is presented to determine the ture within 20 minutes. It shall not be sented during heat-up to remove noncondensibles. The solution shall be withdrawn suitability of coatings at elevatcd temperature and pressure from the bottom of the chamber and returned to the upper (Subsection 4.4.1). This standard test provides a procedure portion of the chamber through spray nozzfes.the chamber for evaluating the performance of protective coating systems at the anticipated condition,which includes preparation of speci-being constructed so as to a!!ow test specimens to be ex-mens. description of test conditions and apparatus for tem-posed to totalimmersion, to liquid-vapor interface, and to gerature-pressure testing, description of exposure conditions spray. The test equipment shall be constructed of materials for irradiation testing, methods of examining and evaluating that are corrosion resistant to the test solutions used. The equipment components and arrangements are presented the test specimens following exposure. 4.2 Dcfinition of Terms. Sce Section 8, Glossary of Terms. as a guide by which DBA conditions may be simulated. Desi-4.3 Preparation ofSpecimens. ations from Figure 3 are permissible as long as the test condi-4.3.1 Steel tions are met. It should be noted that high. temperature steam 4.3.1.1 Panels. The minimum size carbon steel panel is involved and that available safety measures are mandatory shall be 2 by 4 in. by 118 in. thick with rounded edges and cor-to protect personnel operating such equipment. Several such r.crs. Larger sizes may be used where feasible. The composi-safety devices are provided in the equipment eumpeents in teon of each specimen shall meet the requirements of ASTht A Figure 3. The composition of the test so!ution ed the re-

36. Standard Specifications for Structural Steel Part 4 quirements of temperature, pressure. and time iTable 3 and American Society for Testing and hf aterials, Philadelphia.

Figures I and 2) shall accord with the design established for Pennsylvania.19103. the intended service. 4.3.l.2 Surface Preparation. Surface pteparation 4.4.2 Irradiation Test. Protective coatings fot use in reac. shall be as specified in Subsection 6.3.1 and shall be consistent tor containment facilities shall be shown to be resistant to the j with the intended application. integrated radiation dese anticipated during the DB A for the 4.3.1.3 Scribing of SicelSpecimen. Panels should be specific application. A typicalintegrated dose may range from wribed to base metal with a straight edge and a suitable I X 10' to 2 X 10' rads. blethods of irradiation testing,but sharp pointed tool (such as a diamond stylus). The scribe not evaluation, presented in ANSI N5.9, Subsection 2.3. are shvuld be a diagonalline approximately equalin length to recommended. two-thnds of the diagonallength of the panelbut not extend-4.5 Methods of Examining and Erah,ating the Exp.aed mg closer than 1/2 in from the corners. Care must be taken Tcs: Specime rs. The dynamic elevated temperature pressure to ensure that the scribe penetrates completely through the and irradiation test panels shall be evaluated within 2 hours and again 2 weeks after removal from the test chamber for the coating to the base metal substrate. following surface defects: flaking, d ela mination, pe eling, 4.3.2 Concrete and MasonrP. 4.3.2.1 Panels. The minimum. size panel shall be blistering, chalking. Defects listed in Subsections 4.5.1 through ~ f f,4 shall be dealt with as follows:4.5.1 Flaking. AST5 4.5 .y 2 t y 4 in. by 2 in. thick. Larger sizes may be used where feamble. 4.3.2.2 Surface Prepration. Suriace pseparation shall tance to Flaking (Scaling)of Exterior Paints,Part 21. Aucti-can Society for Testing and 51aterials. Philadelphia, Pennsyl-be as specified in Subsections 6.4.1 thrctgh 6.4.3 and shat! be y ? consistent with the intended application. i vania 19103: Flaking shat! not be permitted. 1 4.5.2 Delamination and Peeling. Neither delsmin.stion 4.3.3 Other Steeland Metals. 4.3.3.1 Panels. Pane!s shall be prepared as specified in k nor peeling shallbe permitted. g Subsection 4.3.1.1. LM 4.5.3 Blistering. Blistering shall be limited to a few int ct 4.3.3.2 Surf.rce Preparation. Surface preparation shall blisters, size No.4. ASTht D 714, Standard.tferhod ofEralua-tv a specfied in Sub>ection 4.3.1.2. ting Degree of Blistering of Points, Part 21 American Society 4.3.3.3 Scribmr of,tf(tallir Surfaces. Scribing shall N => >pecified in Subsection 4.3.1.3. 4.3.4.4pplication and Curing of Coatings. Specimens =This test does not memre the evolution cf h> dasen. } 4 LL - j

... _..... _...... ~... PACIFIC G AS AND ELECTRIC COMPANY mg S AN FRANCISCO CALIFORNI A C E PARTM ENT -CF ENGIN EERING ACCOUNTING QATA 't.oc. ^c,l'c 4"' %Me# v ,ccouNr PRE NUMBCR 'S U g O t V. 37gu GM 167029 GM 169972 SDECIFICATION NO. 8848 FILE COPY SPECl FIC ATION $heturn to FOR NWARTMENT OF ENGINEERING SERVICES FINAL PAINTING AT a DIABLO CANYO TUNITS 1 AND 2 ~ g r COMPRISING Specific Conditions General Conditions Contract Form Insurance Questionnaire Form of Proposal APPROVED BY J. J. McCann/ATL (NLT/WJP/KET) BIDDER--SIGN HERE m 1::v.uE.ais R. V. 3ettinger/EPW/EJR (WLT) HAS 3E EN USED 2 N P.:dr.t J D'G ;.....u. D. V. Kelly /WJL (HJG) FIRM J. O. Schuyler BY._ _ __ ____.__ D A T E.__ _ _._ __ __ DAT E January 26, 1972

L gg;g Scope 1-1 SPECIFIC CONDITIONS SECTION 1 SCOPE OF WORK 1.0 OUTLINE OF WO?X AND GENERAL 1.1 This Soecification covers the finish painting and related work for Units 1 and 2 at Company's Diablo Canyon Site.

1.2 Location

The work site is located approximately six miles north of Avila Beach, San Luis Obispo County, California.

1.3 Definitions

Definition of Bidder, Company, Materials Depart =ent, Constructor, Centract, Contractor, Enginear, Specification, Work, etc., is as defined under the General Conditions of this Specification. 1.4 Cc_mpany representatives to whom all questions pertaining to the work shall be directed are as follows: 1.41 Prior to award of contract, the authorized representative is the Cocpany's Materials Department. For information pertaining to the specifications and drawings, bidders shall contact the Materials Depart =ent representative. 1.42 After award of contract, the Company's representative will be Constructor.

1.5 General

The work shall comply with the requirements of the Specific and General Conditions of this Specification and shall include the furnishing of all labor, =aterial, tools and equipment, and facili-ties required therefor. Work specifically excluded is listed under Paragraph 2.0. All work necessary to make a complete installation ready J. m' for use or operation shall be performed and considered as included in the prices quoted for work hereunder whet'Ter or not specifically classi-fled for payment under any of the items of the Proposal Form. ~ 1.6 The Work Shall Include the Following Principal Items: 1.61 Finish painting of the turbine building. 1.62 Finish painting of the auxiliary building, including areas FE, FW, GE, GW, J, and L except as noted in Item 2.13 below. ~~ -rr =:-- -r.

o SS48 Scope 1-3 5.0 *JORK SITE FACILITIES

5.1 General

It is the desire of Co:pany to retain ths natural landscape of the plant site, disturbing the terrain only in those areas designated on the drawings or other areas where it is unavoidable as a part of the perfor:ance of work hereunder. Any unsightly displacements shall be restored to their original condition immediately after the completion of work. Contractor d.all cooperate with Constructor by restricting travel and other operations at the work site in accordance with this Section of the Specification.

5.2 Facilities

5.21 Contractor shall furnish all facilities that may be necessary for performance of work hereunder unless specifically described to be provided by Cocpany. All temporary buildings and structures will require approval of Constructor regarding location and appearance. Architectural consideration will govern at all times during the progress of work. Contractor shall not engage in any activity which might result in unsightly conditions except for an approved specific length of time. 5.22 Soecific Areas:

  • In the vicinity of the work site, an area will be assigned to Contractor for his office, material stor-age, shops, and material laydown.

Under no circumstances shall Contractor occupy other areas without specific authorization of Constructor. 5.23 Buildings erected by Contractor shal'1 be approved by Constructor prior to erection. All temporary buildings shall be selected from one of the following, and no substitution will be allowed without the specific approval of Constructor. 5.231 Ar=co Steel Corporation Armco Building Syste=s Self-Framing Type S-2 .f..' Color - Desert Tan 5.232 Butler Manufacturing Company Butler Building Syste=s Rigid Frame Type RF 21 Color - Walls, Dulite Sage Green Roof - Parchment White 5.233 Stran Steel Corporation Stran Steel Systems Rigid Frame Type RF with Type SF Roof and Wall Panels Color - Dulite Brierwood Tan (Stran Satin) h u.-- .,--.w-M- .---.._--avam,-.---- __.h

--~.- - 6 SSa8 S::pe 1-5

5.7 Water

Co:pany will furnish-necessary water within the work area, described below, for the work hereunder at no cost to Contractor. When Bidder visits the work site, Constructor will indicate'the points of connection to the water supplies, Flow will be limited to the capac-ity of the existing facilities. Contractor shall furnish all piping and equipment for transporting and disposing of water used for cleaning, test- ~ ing, or other purposes. Force pumping of existing lines by Contractor shall be subject to prio; approval. Company will assume no liability for the suspension of water services. 5.71 Drinking water is in short supply.. Company will furnish drinking water in nominal quantities for use by all Contrac tors at one established point. 5.72 Raw water is available in limited quantitles forL construction purposes. This water is not potable, and. Contractor shall notify his employees of same and shall post warnings at each of his raw water supply outlets. Company will make analyses during construction to assure acceptability of the water for the work hereunder.

5.8 Power

Company will furnish electrical power at 115 volts, single phase, and 480 volts, 3' phase, free of cost to Contractor,uat established outlets within the work area. All temporary or portable wiring beyond these established delivery points shall be furnished by ~ Contractor. however, all connections to these established delivery points, including the connection of welding machines, temporary lighting, electrically driven sump pumps, and similar equipme.nt, will be by Con-structor. Company will assu=e no liability for failure or suspension of electric power supplied. 5.9 Telephone Facilities: A multicircuit PIs! cable is available at the site. Should Contractor desire telephone facilities, he shall cake all necessary arrangements for these facilities and de responsible for payment for same. Overhead services will not be allowed. All arrangements for telephone services shall be subject to Censtructor's approval. 5.10 (Not applicable) 5.11 (Not applicable) 5.12 Lands for Construction Purposes: 5.121 Company will provide all lands and rights of way i necessary for the work and destgnate 'he use of same. i l l-....

.3..-..--.. L SStS .Scepe 1.

5.7 Water

Company will furnish necessary watar within the work area, described below, for the work hereunder at no cost to. Contractor. When Bidder visits the work site, Constructor will indicate the points of connection to.the water supplies. Flow will be limited to the capac-ity of the existing facilities. Contractor shall' furnish all piping and equipment for transporting and disposing of water used for cleaning, test-ing, or other purposes. Force pumping of existing lines by Contractor shall be subject to prior approval. Co=pany will asst =e no liability for the suspension of water services. 5.71 Drinking water is in short supply. Company will furnish drinking water in nominal quantities for use by all Contractors at one established point. 5.72 Raw warer is available in limited quantities for construction purposes. This water is not potable, and Contractor shall notify his employees of same and shall post warnings at each of his raw water supply outlets. Ccmpany will =ake analyses during construction to assure acceptability of the water for the work hereunder.

5.8 Power

Company will, furnish electrical power at 115 volts, single phase, and 480 volts, 3 phase, free of ccsc to Contractor, at established outlets within the work area. All temporary or portable wiring beyond these established delivery points shall be furnished by Contractor. However, all connections to these established delivery points, including the connection of welding machines, temporary lighting, electrically driven sump pumps, and similar equipment, will be by Con-structor. Company will assume no liability for f ailure or suspension of electric power supplied,' - 5.9 Telephone Facilities: A multicircuit FISI cable'is available at the site. Should Contractor desire telephone factitties, he shall make all necessary arrangements for these f acilities and oe responsible for payment for same. Overhead services will not be allowed. All ' g, arrangements for telephone services shall be subject to Constracter's approval. 5.10 (Not applicable) 5.11 (Not applicable) 5.12 Lands for Construction Porposes: 5.121 Company will previde all sands and rights of way necessary for the work and designate the use of sase. m__.

~. 4 SS48 Scepe 1-7 5.143 constructor will furnish identification numbers to be used on vehicles of Centractor and Contractor's employe.es. Vehi-cles will not be permitted on site without an identifying sticker or special pass issued by Company. 5.15 Access: Equipment, personnel, tools, or material shall be transported to and from the property during scheduled work hours unless otherwise permitted by Constructor. A permit will be required to move tools, equipment, and material off of the. work site. Permits will be obtained from Constructor as each need occurs. Company will furnish gateman during approved working hours. 5.16 'a'eather : Contractor shall provide the necessary tarpaulins, ~ supports, etc., for protec .on of his work and material from inclement weather, ocean spray, rain, and mud to the satisfaction of Censtructor. 5.17 Illumination: Company will install lights for lighting the entire yard area. Contractor shall provide additional lighting for his work when it is necessary in order to conduct the work in a safe, work-manlike manner. All applicable codes and requirements shall be complied with. 5.18 Good Housekeeping: C'entractor shall maintain c?.ean and orderly work and storage areas at all times during the pecgress of his work. Toward this end, the requirements of Paragraph 26.0 of the General Conditions will be rigidly enforced. 5.181 Contractor shall maintain the work area in a clean condition and shall remove all waste material and rubbish from the work area immediately as it accumulate and dispose of it in Company furnished containers. At the completion of work, Contractor shall remove all tools, equipment, waste material, and rubbish frcm the work site and shall leave the area in a clean and orderly cendition. Contractor shall clean any oil spills on concrete i=:ediately with Quick Sorb or Chem Sorb. .s 6.0 SAFETY PRECAUTIONS 6.1 ?rotection of Work. Safe 3_uards: Contractor shall provide and maintain during the course of his work and as long as a hazard exists sufficient electrical type warning devices (flashers), barriers, barri-cades, temporary walks, platforms, and other safeguards as required for the safety of his employees and others working in the area. 0 4

4 ._~~~a._._.-__... Et f -3343 Scope i 1. 9.2 Use of Foreign Material: The use of forei.gn caterial will not ~ -be acceptable. The price (s) quoted in the Proposal shall~be based upon ~ all cc=ponents of the equipment and/or =aterial.used in the work ^having been produced or =anufactured in the United States. T i .k 10.0 (Not applicable) ~ 11.0 ITEM SEGREGATION i 11.1 Contractor shall submit to Constructor daily a record of ~ manheurs worked by each of his employees to faci 1itate Ccmpany's account-ing. The transcript shall fully describe the various classes.of. work j _ performed in confor ance with the applicable classifications set ~ forth, in Company's item segregation or the. breakdown of the' classifications as l may be dee=ed advisable by Constructor. The transcrip't shall also indicate the time allotted to each classification of work and the hourly or daily applicable rate of pay of the employee.' 12.0 (Not applicable) i l } ,-<d i 13.0 (Nct applicable) ~; j 14.0 (Not applicable) 1 1 i i i

~ ,~ ,_o.._- .. m s , i - 1 f 38'S-Painting _ ' 2 -l ' SECTION 2 t' PAINTING 1.0 SCOPE i

1.1 General

t' 1.11 Contractor shall be required to furnish a high quality of surface preparation, paint application, and workmanship. All work shall be subject to strict inspection. 1.2 Work ccmprises painting of all' surfaces as specified horein-and as shown on the drawings. Work shall include. furnishing of all labor, i materials, tools, ladders, and scaffolding. i i 1 2.0 SURFACE PREPARATION

2.1 General

t .I 2.11 The extent of surface preparation n4cessary shall vary. with the existing condition of the item to be finish painted. _ These items may be unpainted, shop primed, or shop-painted unless otherwise - -- noted. Company representative shall indicate extent of surface preparation required. 2.12 All surfaces shall be dry and free from~ dust, dirt, 1 grime, grease, oil, rust, and other substances or_ coatings which will L= pair the quality of the work or' interfere with the proper adhesion of the coatings. ~ 2.13 No halogen-based cleaners shall be used. 2.14 Compounds used in surface preparation shall not be _ allowed to contact surfaces _other than those being prepared ' r painting. 2.2 Carbon Steel Surfaces: 2.21 General _: All foreign materials shall be rencved. Surfaces shall be cleaned in accordance with Steel Struerures Painting Council Specification SSPC-SP-3'"3 rush Blast cleanias," unless otherwise reccomeaded by paint manufacturer. g,) g,, 27. K c. /,- !- /. ' n 4 I 4 r -- --- c. -e+ r a .,,.,,,wa r,,.,w, -,w,9--

. a. c_, -,._l.--..,. s. .3+ e ^$ e '- 5848 Painting 2-3

2.6 Plaster

All holes, cracks, and other surface defects shall be repaired with patching plaster properly keyed to existing plaster and textured or finished to match surrounding surface by others. No paint or sealer shall be applied on plaster when moisture content exceeds 8 percent as determined by a moisture testing' device. Plaster which has cured less than.two months shall be washed with Dutch Boy Alki-Free. 2.7 Exterior Surfaces of Generator Housings and Associated Structures (including turbine-generator, exciter, and exciter shelter): 2.71 Surfaces shall be sanded to remove all rough edges and loose paint. 2.72 Sanded surfaces shall receive one coat Sherwin-Williams Ken Bond Primer #E41N15 applied by spray af ter reducing 20 percent with Toluol #R2Kl. 2.73 Cracks and dents shall be filled with Rinshed-Mason #74 Green Stuff Putty and sanded out smooth and flush. Cne coat Sherwin-Williams Kem Primer Surfacer #3A43801 shall be. applied to fill'small. scratches and pits on surface and sanded out smooth and flush. 2.74 Primer and/or finish coat shall be applied as specified. 3.0 MATERIALS AND APPLICATION

3.1 Materials

3.11 Materials'shall be as set forth in Para' graphs 4, 5, r-and 6. 3.12 Materials shall be subject to strict control to assure ~ identity of all materials purchased and applied. 3.13 The manufacturer (s) of the materials being supplied shall furnish a product identity certification with -ach batch. i Certification shall precede shipment of batch to jobsite. This i certification shall include at least the information requested in i Form 1 appended. Such certification shall be supplied to both Constructor and Contractor and subject to approval by Eng'aeer, i l t I

a 8648 Painting 2-5 4.0 PAINT SYSTEMS - CO5VESTIONAL

4.1 General

4.11 Conventional paint systems shall be used in the turbine (generator) building and in the auxiliary building except for the following areas: Area K: Elevations 85', 100' and 115' Area J: Elevations 100', 115' and 140' 4.12 Items to be finish painted will initially be (1) unpainted, (2) shop primed, or (3) shop primed and painted. 4.13 All items shall be finish painted. Unpainted items shall be completely pri=ed and finish painted. Shop primed items shall be spot primed and reprimed, if necessary, to =aintain spec-ified film thickness of primer and shall then be finish painted. Shop primed and shop painted ite=s shall be finish painted unless otherwise specified. 4.2 Mini =us wet and dry film thicknesses for primer and finish coats shall be indicated below in parentheses. Regardless of fiLs thickness of undercoats, the fils thickness of the finish coats shall be as indicated. 4.3 Steel Surfaces (Exterior): Primer - Devoe Chem-Zine Silicate B-14700 (6-3 mils) Spot Primer - Devoe Chem-Zine 14600 Finish Coat (s) - Devoe Chen-Bar High Build Coating 413XX (S-4 mils) 4.4 Steel Surfaces (Interior): Primer - Devoe Quick Dry Red Lead Primer 41821 (4-2 mils) Finish Coat (s) - Devoe Speed Rex 414XX (two coats 3 mils) j,. 5/ 4.5 Steel Surfaces (Interior): Primer - Devoe Acrylic Red Lead Primer 46222 (3-1 mil) Finish Coat (s) - Devoe Acrylic Maintenance Coating 426XX (8-3 mils) 4.6 Galvanized and Aluminum Surfaces (Whene r Soecified): Primer - Devoe Zine Dust Primer 14000 (2-1 mils) Finish Coat (s) - Devoe Speed Rex 414XX (two coats 3 mils) ~ = -... = _ -en- - - -. - =

u - -. n... ~, . - ~.l ~ - w.. l 4 SS;S Painting 2-7 4.11 Wood Surfaces (Interior-Natural Finish): Primer - Devoe Quick Drying Wonder Woodseal Finish Coats - Two - according to gloss specified Semigloss - Devoe Quick Drying Woodseal 5.0 PAINT SYSTEMS - CLASS A AREAS

5.1 General

5.11 Class A areas are characterized by relatively large quantities of radioactive' materials, by high radiation fields, by. high probability of contamination by radionuclides, by the possibil-icy of spills, splash and fume from acids and alkalies, by frequent exposure to high humidity and temperature, by exposure to decontam-ination reagents (acids, alkalies) and steam cleaning, and/or by : constant m=ersion in deionizad water.- 5.12 class A paint syste=s as specified shal1~be used-in the following areas according to schedules to be. furnished at a later date: Containment Structures Elevation 100' Areas K and J Elevation 115',2 Ion Exchanger Room S (Col. 168 to 19 and Col. N to S ) 5.13 Items to be finish painted will initially be (1) unpainted, (2) shop primed, or' (3) shop pri=ed and painted. 5.14 All items shall be finish painted. Unpainted items shall be completely primed and finish painted. Shop primed items shall be spot primed and reprimed, if necessary, to maintain spec-ified film thickness of primer and shall then be finish painted. Shop primed and shop painted items shall be finish painted unless otherwise specified. 5.2 Minimum wet and dry film thickness for primer and finish coats shall be indicated below in parentheses. Film thickness cf all finish coats shall be as specified regardless of total dry fila thickness indicated.

.j. _ _. _ _ ..f. 8 S t.8 Painting 2-9 6.3 Steel Surfaces: Primer - Che=-Zine Silicate Base Zinc Rich Coating #14700 (6-3 mils) Final Coat - Chem-Fast M.P. Finish 425XX in selected color (6-3 =ils) 6.4 Concrete and Concrete Block Surfaces: Filler - Mineral Filler #10100. Use on concrete block and on concrete if rough or with many voids. First Coat - Chem-Fast M.P. Finish 425XX in selected color using Che -Fast M.P. Regular C nverter (4-2 mils). Thin with 1 quart Che=-Fast Thinner 42300 per gallon. Second Coat - Same'without thinner (4-2 mils) PAINT SCHEDULE (EXTERIOR AREAS) 7.0

7.1 Ceneral

7.11 All areas and/o'r surfaces eicept prefinished items, such as siding, roofing, and anodized trim, shall be finish painted using paint systems specified in Paragraph 4.0 unless otherwise l specified.

7.2 Schedule

Paint System Areas and/or Surfaces See Paragraph Ungalvanized surfaces, including doors, fra=es, louvers, piping, screens, structural-steel, and such 4.3 Main transformers, auxiliary transformers, standby J" 4 transformers (flow coat radiators) - 4.4 'j Tanks (transfer, condensate storage) 4.5 Cor ete surfaces No painting Galvanized flashings, doors and frames 4.6 Piping, insulated (omit primer) 4.5 Piping, uninsulated, below 200F 4.3 4 Piping, uninsulated, 200-400F 4.7 Piping, uninsulated, 400-1,000F 4.8 Structural steel and pipe restraints 7.3 Transformer radiators shall be spot primed and flow coated. J I

.~ SS48 Patating 2-11 Doors Rooms' Walls Ceiling Frames Miscellaneous Elevation 85'-0" 4.4 (101) Diesel Generator 4.4 (102) Diesel Generator 4.4 (103) Diesel Generator 4.4 (104) Passageway 4.4 (105) Switchgear 4.4 (106) 0ily Water Separator 4.4 (107) Space (108) Lub. Oil Storage Tank 4.92 4.91 4.92 Piping 4.4 F Tank 4.4 '(109) Passageway 4.91 4.91 G ~SG 4.4 (110) Vestibule 4.91 4.91 G SG 4.4 (111) Mach. Shop 4.91 4.91 SG SG 4.4 Crane and Rails 4.4 (112) Elect. Fore =an 4.91 4.4 SG (113) Elect. Shop 4.91 4.91 SG SG 4.4 (114) Welding Shop 4.91 4.91 SG SG 4.4 (115) Mech. Foreman 4.91 4. 4' SG (116) Tool 4.91 4.91-SG SG 4.4 (117) Vestibule 4.91 4.91 SG SG 4.4 - (118) Passageway 4.91 4.91 4.4 SG -SG f 4.91 4.4 (119) Mech. Closet SG Elevation 104'-0" 4.4 (202) Space 4.4 l (203) Space 4.4 ] (204) Space ( ) Lub. Oil Reservoir 4.92 4.92 4.92 Tank extarior i 4.4 l l ~

n....~....___-.-.._..__..____ S??S Painting 2-13 8.33 Schedule: Note: Gloss indicated as F= flat, G=gicss and SG=semigloss Paint System Areas and/or Surfaces See Paragraoh Below Elevation 60'-0" Areas H, K, GE, GW 8.42 Elevation 60'-0" Areas H, K, GE, GW 8.42 Elevation 73'-0" 8.42 Areas H, K, GE, GW Elevation 85'-0" Doors Rooms Walls Ceiling Frames M'seellaneous (120) Counting 4.91 4.91 Metal wall G G panels 4.91 G (121) Office 4.91 4.91 SG SG i (122) Hallway 4.91 4.91 SG (122A) Stairway 4.91 4.91 4.4 SG SG I 4.4 Counter and (123) Reg. and checkout 4.91 G soffit 4.11 ^ (124) Storage 4.91 4.91 4.4' G G 4.4 (125) Access Vestibule 4.91 SG 4.4 Access door (126) Vent. Equipment 4.91 G 4.4 (127) Locker No.1 4.92 4.92 4.92 4.4 (128) Rad. Proc. Eng. 4.91 G (129) Laundry Supply 4.92 4.92 4.92. Wainscot - no painting (130) Hot Shower 4.92 4.92 4.92 Wainscot - no painting cabinat 4.10-G ,e - e-cme ....m .m,.. 'egere-ow e =&e* g a=e *=,. _ P*'i -N-**-4m

em

  • arg=D-e

.*6**w-

  • -r
  • Wa*
  • =-**Jw*-

=

    • w~+-4-ey*"+-=*N'

,m-w - we==-e y

~ SS48 Painting 2-15 Paint System Areas and/or Surfaces See Paragraph Areas FE, GE, G'a', H and L 8.2 Areas J and K 8.42 Elevation 115'-0" Doors Rooms Walls Ceiling Frames. Misc. 4.92 125 Volt D-C 4.92-Dry Waste Storage 4.92 (401, 402, 403, 406) Cable Spreading (127'-4") Contam. Storage (130') -4.92 4.92 Contam. Stor' age (130') Paint System Areas and/or Surfaces .S_ee Paragrapil Areas FE, GE, GW, H and L 8.2 Areas J and K 8.4-Elevation 128'-0" Doors Rooms Walls Ceiling Prames Miscallaneous (403) Co=munication 4.91 4.91 4.92 SG SG (404) Communication 4.91 4.91 4.92 SG SG' Paint System Areas and/or Surface's See Paragraph Area H S.2 Storage Space in Area J (125'-6") 8.42 Elevation 140'-0" Paint System Areas and/or Surfaces See Paragraph Area K - Mechanical equipment roc.s S.2 - Shop spaces 8.42 Area J S.2 Area L S.42

..u..-........- S848 J*- Painting 2-17 i Faint System Areas and/or Surfaces See Paragrhph Elevation 115'-0" Surfaces and areas, inner areas (53 + fe'et radius) 5.3, 5.4 Outer areas 6.3 Elevation 140'-0" Equipment, tanks, and. piping-5.3 Walls (to Elevation 150'-0") 5.3 Ceiling and associated structure No painting Equipment hatch 6.3 . Personnel hatch 6.3 9.0 -MISCELLANEOUS ITEMS 9.1 Fire piping and equipment shall receive two" finish coats PG&E Y No. 24 Vermilion (Safety Red) (Devoe Speed Rex 414-XX). 9.2 Aluminium sash and trias shall not be painted. f 9.3 Exposed piping, conduits, electrical outlets, access panels, registers, exposed duct work, and such shall be painted to match adjacent areas. s9 ~#**' 10.0 CLEANUP q 10.1 Upon completion of work, all surfaces shall be lef t free frem stains, spots, spattering, or other defacement resulting from painting. All work areas shall be left in a clean and orderly condition with all paint spots, rags, and diser.rded equipment removed. All glass in areas painted shall be cleaned with suitau lt cleaning compound and polished dry with a clean cloth.

_ _. - _ ~ ~- F0 sM i PAN'UFACTURER'S PRODUCT IDENTITY CERTIFICATION RECORD GINERAL DATA (To 3e Filled In By Purchaser) PROJECT NAME Diablo Canyon No. 1 DATE PROJECT LOCATION Avila, California REPORT NO. CWNER Pacific Cas and Electric Company PURCHASE ORDER NO. BUILDING, UNIT OR EQUIPMENT DESIGNATION SHOP WORK FIELD WORK _ TECHNICAL DATA (Submitted at Time of Shipment) DATE PAN'UFACTURER PRODUCT NAME AND NUM3ER GENERIC TYPE EATCH NO. DATE OF MANUFACTURE 59 ELF LIFE NET WEIGHT LBS. PER CALLON (Fed. Test Method Std. No.141, Method 4184 t ASTM D-1475-60) VISCOSITY RANGE TEMPERATURE F MErdOD SOLIDS VOLUME % DRY TIME: HOURS @ F- % R.H. TACK FREE TIME: HOURS @ F % R.H. REC 0AT TIME RANGE F % R.H. MINIMUM DRY FILM THICKNESS PER COAT': MILS ~ COLOR, VISUAL INDUCTION EERIOD HOURS F POT LIFE HOURS F MIXING RATIO: PARTS COMPOSENT BY WT. _ PARTS COMPONENT BY VOL. PARTS COP 20NENT SPECIFIED THINNER FLASM POINT T.S.G OPEN CUP F (ASn1 D-92-46) SICNATURE __,_,,_ _ _ TITLE _ _ _ e y ,,--,,y ,r-e- --moe' ~ eet

~.. -... -. SS48 Measurement and Payment 3-1 SECTION 3 MEASUREMENT AND PADIENT 1.0 SCOPE AND GENEPAL

1.1 Scope

This Section comprises the cceplete performance of measure =ent and pay =ent for work specified herein. 1.2 Cost-Plus Work: 1.21 I.tems Included: For work authorized to be performed, Company will rei= burse Contractor for the cost to Contractor of the following itens. Contractor shall understand that the ancunt of -work which may be done under the terms of Paragraph 1.2, Cost-Plus Work, is not specified and no claim will be' accepted because such work is greater or less than he had anticipated. ~ 1.211 Wages and salaries of Contractor's empicyees, including job foreman (as required by Union agreements) engaged directly in performing the work hereunder, including payroll taxes, vacation, holiday and sick leave allowances,'and other fringe benefits Contractor is required to pay as a result of collective bargaining agreements between the construction industry and the labor unions involved but excluding any-sove in or move out expenses for such employees if they are already on the project and the wages or expenses of any foreman cn-superintendent (not required by Union agree ent) or field office personnel. 1.212 Certain paint materials actually used (see Para-graph 1.223 following), including sales or use taxes thereon and the transportation thereof, all at actual cost, less trade but not cash discounts and less the fair value of materials and supplies salvaged and retained by Contractor. .J. '. 1.213 Amounts of premiums for the insurance eequired in. Paragraph 13.0 of the General Conditions but onif up to linits of $200,000 for any one occurrence for the-insurance specified in Paragraphs 13.21 and 13.22. Premiums for other insurance shall not be separately reinbursable. 1.214 Incidental direct costs to Contractor arising directly from performance of the work hereunder, provided they have prior approval in writing by Constructor. e-ee--de -a--.md=a 1h.m4hmeer 4 m== ,M a-he o eD m har_- -,---A--=.-a-

S848

feasurement and Payment 3-3 1.23 Data Recuired: For all verk, Con:ractor shall support invoices for payment with itemized receipted bills f or =acerial.

Centractor shall submit certified copies of payrolls covering all labor employed by Contractor performing work under this Specifica-tion. Satisf actory evidence shall also be submitted to verify cate-rials drawn from Contractor's stock and other miscellaneous items of cost not otherwise verified. 1.3 Construction Building: 1.31 Contractor to. quote a lu=p-sus price to furnish, erect, maintain, and re=ove a construction building as detailed in Paragraph 5.23, Section 1. 1.32 Ninety-five percent of the lump sum will be pa;able when the building is erected ccmplete and the balance af ter the building is removed. 9 4 M O y ~ a -

~ Index GENEML CONDITIONS INDEX Page DEFINITIONS AND PROPOSAL GC-1 to GC-4 1.0 Definitions 2.0 Proposals 3.0 Conditions Governing Pricing 4.0 Inforcation to be Furnished by Contractor DRAWINGS, SPECIFICATIONS, AND INFORMATION GC-4 to GC-6 5.0 Drawings and Specification 6.0 Award of Contract and Information Furnished by Company LEGAL AND INSURANCE' GC-6 to GC-ll 7.0 Permits and Other Miscellaneous Requirements 8.0 Infringement Protection 9.0 Risk of Loss or Damage to Work 10.0 Modifications, Assignment, and Notice 11.0 Bond 12.0 Indemnity and Withholding 13.0 Insurance 14.0 Claim by Contractor for Damages 15.0 Liens ADMINISTRATION OF CONTRACT GC411 to GC-15 ~ 16.0 Company's Representative 17.0 Control and Perfor=ance of the Work 18.0 Inspections and Tests 19.0 Delays and Suspension of Work 20.0 Termination of Contract MISCELLANE0"S GC-15 to GC-28 21.0 General 22.0 Laying Out Work 23.0 Safety Precautions and Protection to Property 24.0 " 3rantees 25.0 Company's Operation 26.0 Cleaning Up 27.0. Field Conditions: Visit to Work Site 28.0 Materialu, Facilities, Services, and Struc tures Furnished 29.0 Method of Payment 30.0 Additional Work or Changes 31.0 Cost-Plus Work 32.0 Nuclear Insurarce and Indennity 33.0 Emergency Vehicle GC 11 x : -- r-2 x- =~ r

r
z r: : -

General Conditions GENEEAL CONDITIONS DEFINITIONS AND PROPCCAL 1.0 DEFINITIONS 1.1 "Eidder": The party or parties submitting a prcposal for the specified work. 1.2 "Ccepany": Pacific Gas and Electric Co=pany. 1.3 " Constructor": Company's Vice President-General Construction or his authorized representative. l.4 " Contract": Includes the agreement, specifications, drawings, appendicies, and any bond, together with any other material specifically incorporated therein. 1.5 " Contractor": The party or parties entaring into a contract with Company for the work. l.6 " Engineer": Company's Vice President-Engineering or his authorized representative. ^ 1.7 " Specification": Company's 3pecification which includes the ' General Conditions, the Specific Conditions, the Proposal Form, 'and any addenda. 1.8 "As Directed", "As Recuired", "As Permitted", " Approved'?, " Acceptable", " Satisfactory", or similar ter=s shall rean by or to Constructor. 1.9 " Work": Labor, caterials, and all require =ents hereunder. ~ 1.10 " Approved Ecuivalent": An item approved by Engineer as being acceptable to Company as a substitute for a specified item. 1.11 " Erector": Equipe.ent =anufacturer's duly authorized technical advisor. s 2.0 PROPOSALS 2.1 Form: Proposals shall be made on the attached Froposal Form. The Proposal shall be enclosed in a sealed envelope distinctly ~trked " Proposal" with the title of the work as given, and delivered to Cc p.iny's Manager of Purchasing and Stores, 77 Beale Street, San Francisco, Califor-nia 94106, at or prior to the hour specified. Late bids will be su'aject to disqualification. l 11.250:1 GC-1 i i

-. ~. .. _. 7 . ~- General Ccnditions i 4.0 IN70RMATION TO 3E FUF2:ISHED' t i 4.1 Infor ation With Proposal: Sidder is requested.co submit with his Proposal the following information. Excepting Paragraph 4.11,'the infor=ation should be shown on 31dder's letterhead: 4.11 Infor=atien required by the attached Insurance Questionnaire. 4.12 Any proposed changes in the specifded Schedule.o'f Cons.tru ction. In.the absence of such proposed changes, it will be-I assu=ed that Sidder accepts and will comply with the specified Construction Schedule.. + L 4.13 Any requested information in regari to the plant and equip =ent which Sidder intends to use in the work. 4.14' Rental rates for construction equipment, with a value of $750 or.= ore, which 3idder expects to use in perfor ance of the work. Such rates will be applicable for use' of such equipment in performance of any required cost-plus work and shall be quoted in accordance with the provisions of Paragraph 31.0. Rates shall be' submitted as required below: 4.141 The bare =onthly rental rates, exclusive of i operating labor, oil, fuel, grease and cost of servicing and maintaining the equipment. 4.142 The hourly fueled and =aintained rates which i shall include cost of oil, fuel, grease and cost of servicing and maintaining the equipment in first class condition, but j. shall exclude bare rental and cost of operating labor. l 4.15 Any additional information required to be submitted as l listed in the Proposal but not listed above. L l 4.2 Infor=ation After Award of Contract: As soon as possible I after award of con, tract by Company, Contractor sha11' submit the following' '~ infor=ation to Constructor. 4.21 Copies of all labor-craf t agreements containing wage rates and fringe benefits in effect at the time of the award of contract. If any changes therein are negotiated during the term of this contract between the construction industry and the unions involved, revised copies of such labor agreements all be furnished to Constructor. 2 1 i '11.250:3 GC-3 s* - l:" T --~ L-22X"..'X. L J '.

  • T

~ ~ ~ ' ' ' ~

^ + ~ ~ . u - .,_sy. .-....-t q i /) g.;)fi r General Conditiens '/g* i/ s- ~, 3.4 C nstruction Oracings: As soon. as,pcss $ble af,ter notification of award of contract, Cc pany's approved con's truction drawings will be previded Contractor for use in the performance JoC,the work. The drawings issued for bidding shall not be used for construction purposes unless authorized in writing by Constructor. Company anticipates that revisions may be made to the. contract drawings prior to the time they are issued 3 ). as " Approved for Ccnstruction" and to the a'pproved drawings from -tine to ,( time during'the work. These revisions are expected to involve minor- ' Jchanges in dimensions and in embedded items which may require changes by. Contractor _in his propcsed ccnstr.uction methods and sequence of opera- / tions. Contractor shall plan'his. operations accordingly to acce==odate any such changes. Changes, as g such, will not necessarily involvs any , additional cose to Centractor. Any increase or decrease in natarial +- 7 quantities will be paid ~ for orsdeducted under the appropriate Contract F Pricing Items. Where the change involves an increase in other costs to g .i Contractor, Company will pay for any such costs that are considered jus-j cifiable by Constructor. Cc=pany shall receive credit frc: Contractor for any reduction in Contractor's cos ts caused by such changes. Hcwever, Constructor reserves the right to be the final judge as to the amount of any payments =ade hereunder after all the facts are presented and evaluated. s 5.5 Contractor's Drawings and Specificatien: Contractor shall pre-pare any specification, calculat, ions, and drawings required in addition to this Specification. an'd Cc=pany's drawings, subject to the approval of Constructor. Notwithstanding such approval, Contractor shall be respon-sible for the accuracy, practicability,suud correctness of such ). specifications, calculations, and drawings, all of which shall not oper-ate, to change the Specification or Company's drawings unless Contractor submits a written state =ent clearly indicating the -requested changes and obtains Constructor's written prior approval thereof.- In the event of conflict between the Specification or Company's ' drawings and Contractor's ' -s specifications, calculations, or drawings, the.for er shall prevail. Relative to the work hereunder, the perfor=ance by Contractor of any engineering work which is under the jurisdiction of the California Civil. and Professional Engineers Act shall comply with the requirements thereof.

5.6 Changes

Requests by Contractor for any changes in the ,..,*[ require =ents of the Specification and drawings shall be brought to the attention of Const;uctor for written apptoval of Engineer. No changes will be authorized without such approval. s 6.0 AWARD OF CONTRACT AND INF0FF.ATION FURNISHED BY COMom 6.1 Award _of Contract: All work performe subsequent to the award d of contract shall be perfor=ed in accordance with the contract. 6.20:6 GC-5

Gen 2ral Conditiens to constitute infringe =ent, Centrac tor shall, at his sole expense, either procure for Cc=pany the right to cor.ttnue such use; replace the infring-ing ite= with a noninfringing ite= sat:sfactory to. Company; nodify such ite= so it becomes noninfringing; or re=ove such ite= and refund the applicable portion of the contract price. 9.0 RISK OF LOSS OR DAM GE TO WORK 9.1 Until the work is cc=pleted and accepted by Company, the risk of 1 css or damage to the work and =aterials shall remain with Contractor, except as otherwise provided in Nuclear Insurance and Inde=nity, Para-graph 32.0 of the General Conditions following. No damages or extras will be allcwed for unforeseen difficulties or obstructions. 10.0 MODIFICATIONS, ASSIGNMENT, AND NOTICE 10.1 Mcdifications: No provision of the centract shall be dee=ed = edified or vaived by Cc=pany without the prior written consent of Con-structor. No oral statement shall in any =anner =odify or otherwise af fect the ter=s and conditicas set forth herein. 10.2 Subcontracts and Assign =ent: Contractor shall make no sub- ~ contract or other assign =ent hereunder without the prior written censent of Cc=pany, and when consent is, granted, it shall not relieva Cent: actor of any cbligation to Cc pany hereunder. Provisiens of any subcentract which are in conflict with this contract will not be recognized. Nothing contained herein shall create any contractual relations between any subcontractor and Cc=pany. 10.3 Notice: Any notices regarding =odifications or assignr.ent given.by either party (Co=pany or Contractor) to the other hereunder shall be dee=ed to have been given when stated in writing and deposited in sealed envelope in any Urlted States Post Of fice, registered, postage prepaid, addressed, if to Contractor, at the address given in his proposal and, if to Co=pany, as follcws: Pacific Gas and Electric Company Vice President-General Cons truction 77 Beale Street San Francisco, California 96106 e 11.0 BOND 11.1 Bond Recuireren_ts: If requested by Cc=pany, Contractor, within five days of such request, shal.1 btain a pay =ent and perfornance bond in the a=ount of 100 percent of the contract price, in a form and with a surety acceptable to Co=pany. Cc=pany.will rei= burse Contractor for such bond separately, within 21 days of receipt f ro= Contractor of the surety co=pany's invoice. therefor. 6.20:8 GC-7 m .__.m...__ .,._.__m._.

~ c .ral c.. i.#.-s o _,m., e...,... ..o, u. 3 _;..s e. s. ......._..y., such 'e .ranc e as 8 6.-. i fi a d in ~'s. v:.ch 13. 3 f e! D: cin., ' tor .~ ~. 1.'. v. %. :. *. ' =..~. o r t o ,-'....'.a. .&... n' 1 ~ ' ' ~.. ~ 1 ' ~.., -.. ?. ' *..f.1 ' a. - r_ _: ._sintain, during t:.e perf. cr.ance : n eof, r ;.:deduc tible '- mr, ce fer both bedily in'ury and property & case liability (ot'. -r ' an su:cecbile), naming Cct.trecter as t:.e insured 2nd including F 7an; as an additienal. r.ad ins. red, in>crar cs ucri done u-der this er.- tract is conca nad, ad including a crcis-!! ability clause. ~!h e insurence a= cunt shall be not less than S200,000 for in'ury to or death of cne er scre persons as a result of any -cne,ccur.ence, and not 1:.ss :han $200,000 for damage to property resulting f.ce uy cne cccurrence. Such insurc-nce shall be satisfectcry to Ce . ay Oud shall centain an endorsement incorporating by r+fer ca ar.d -aking a part of Contractor's policy or polic#as all the in urfnz agree:.ents, exclusions, and condit'ons of the bre :d fora ccrppf.en - sive liability spacinen policy contained in the r1 star ineucance prc3rra furnished Ccatre,ctor. If Centrac or or ny si; cents.ctor

sintains cdditice.,1 r_;unt.s of f c.rm anc2 pw: -ct? :n, cc a t

<.or shall not charge to this centcact t h e c ns t O c e of _~o r l i :i t s '.n -xcess of $200,000 for any ene occu-re"ce. 13.23 The inse:moce ccvered by rarcy :phs 13.21 ad 13.22 aicte shall be nor.uciaar in

Pure.

13.3 Cc..c;nny's diection to ?.'. ce Taru unce: C- ;any s:sil

  • cze the right, if it so a!ects, to purchase for Centractor workm n's cur;cn-sation insurance as provided for under the caster insvernce progrin and the specimen ;clicy attached berato or the bcdily injury sad pru; rty da age liability insurance as psevided for
der *he w.a r 1."
_.1c e progran and the sp+c'can policy att.:ched he.eto, cr both.

E_we.:c, for the insurance speciff ed in Paragraph 13.2, Cc ;...y shall act be chligated to purchase limits in e:: cess of 5200,000 for any one cccurrance. 13.4 Subcontractor's Insurance: C. pany shall also have the = -. - 4-e"- r ee witn t.ae asne rig.t, ir. it so elects, to purcnase una -,-a n limits for any subcontractor who, befe ce.the subcontract is cade, has offered to perform work at the rork site. To facilitate the latter, Centractor shall negotiate all subcoacracts to provide for such election in the manner set forth in the caster insurance progran furnished to Cen-tractor and shall prcaptly prcvide to r; rany, for wch subcont aetor, before the subcontract is e.-cuted, ch2 'nsu..mca dc a s c+ci-ied in the se? contrac cor's insm ance c.:.st'. coa' re (s c. .ple 'ca.. is e. m ' id :o the Preposal Forn of the Specificar'on). 13.5 .Ce.s t.: .v. insurraca c-.;ed by ec.. u. e.all *;e 4.n m a specified in the 3;rcimen Jnrur-aca policf as ar 'ug in the ..ar instica.:ce program fu cnished to Ca:. actor. C~ ;>.y shall maka e' d i.u to purc: in insurance far Cw .. t e r e r e ny sc<,, w ccr ' .-a

o C c.-

d. 'f tra : tor, in erit!:g :afore the s n t.,ct :r - acn t. ic t is C. ;..f elacts to, 1 weh ' c2: 11.221:1 GC 9

e. ....,. ~.. 13.7 Osury ce Fri sd r,+: A ;nr y irr. t rin; for ' - .:a i, %r aurd2 r sha ll furnish the e.'ma r a t.::: if. sta of i.r! An's Cz; u-tfcn Insurance eeidencing th:,: the colicy of insur:nce arr mted is in full f::ce.:nd effect -nd shall ft.:nish cop'es of all 30d11"z.In.9:r

d

?reperty 2..sge I.iability Insur.... e polici2s arr. ngcd. Such c +rti" cr e and polic'=s shall prc"ide that notice will be ~iven to the ether,.irt."> s at ' r.s t thirty d.sys c rior to c.meellatica cr sui s tantive chn e f, '3 for. cf such policios. Cc.rrany shall have the right to ins;"ct t'.e criginal policies of such insurance, 13.3 Return ?cami"..s: Any and all ra turn premiu a -.d di" ' ds for t':e f nsurance cpc cified in preceding ?.a gtsphs 13.1. rd 13. 22 / M1 ' a payable to Cc:p.iny if Cc peay elects to : irchase such f w.?ce. ~ 14.0 _C_I.AI'd 3Y COST? ACTOR _FO_R DA'uGES 14.1 if Centrac tor clains ext ra con..'.'o " a or t' o Cr.. - Ci, n" aria.ing out of Ccupeny's adr' ais tration or 'at a, et 1 4.a af tha.

  • c t or other action en the part of Cc=pany, Centr,.cor shall Mmit to Cca-structor a written statcrent cupporting the claim eithin chir t'y d.1/.s of the action or decisien giving rise to the c2afred d:-

ys. Cen tl a r t..a r 's failure to so subsit a s t tc cut J thin seid t'i'a ty.' f a 611. c. 4.- ra a traiwar of the claim. C a u.etor i.all v . e s r d r '.v. t a., : - ' t. .n-rent of his intent'.cn to :de a c.'n'. will rce - " f Gy C .y's require ent for supporting the claim. Contra tor ;h.'11 'a spec.f i"c regarding. chat his claim is for; t: hat equip:< nt, - aterials, inor. nd everh ad are affected, and he shceld give an Ost'nate of the -. mt of the cla'n. Contr.htor shall curr.ntly sr'...it to C.... ; .y a21 p...,'- ,t cost di ta relating to such a claim as it de.alcps, includ'.a;; ;%.oll, equip.: ant rental, catarial used, and any cther infoi.r.acion ch ic h i ' s'.,s to or affects the propcsed claim. 15.0 1 _ :_.. S 15.1 Contractor shall diacharge at enca all lians .,hi h may be c filed in cennection with the trork, and shall. cce Cenpt-ny har:-lass tharc-frcs. Cc=pany may retain fron any pay-ents dua under the ccatract sufficient funds to discharge any del'aquint a.. counts cf Cct.tra tcr.!ch liens on Cc pany's rcperty h rte h an or an ': e f C ed, ..*n i C. 7.ar y ny at any the pay tharafrcm, for C.f.raccor's u.-unc, mh m t.a -s ua adrittedly due thereon. .v-... u' T m. = a. s. *. *.>.'.' c: r. c.' . r. r a s. 16.0 E'?!nS Fi?U.SENTATIVE 26.1 Centrol: Cc r: c.v 's s.2; te sn r a t i..1 h c.har;a of 'n-t c'en of the centact 4 hall ';e th2 Ccestruc.ue. C<n.s n:ter ill mi t'.e rk u n w: - cy ec '- nra cer'- ' c u ry

i s t ion ' t

.2 $ r.n na N...s or i.aa * :n r. dct. 11. 151:3 '4 11 t

r..... c. .;.o . m.. _ : : c.. c_ c..~.3 . _ _-. a 13.1 Ccapany shall ha ce the right to -@e ';o;h field und - ;p ins;+ct :ns r.d tests. Cc: ;any's inspectors shM1 have free ac +5 s to the wcrk at all tires. Neither the - aking nor the failure tow.e such in4;ections and tests by C xpany nor the express or implied apprcml by C ni.any of any part of t?.e :.urk shall relir e Centractor of the ,ca- . sibility to ec=plete.:ad guarantee the xcrk as specified. Kejec.ed crk shall be renadied as direct 2d by Ccas tructor at sole expe -se of Ccntia. tor. 19.0 nrT.vc r,7 51;SPF.SSIGN OF ::CFX. 19.1 p gpencien of '.*crk: Ccas tmc'.or my espc ad the ork' or delivery of materials for ccuses which Cc.structor censiders to be suificient. 19.2. Delivery of 'StarSis : C e l iv.- ry J.i t = s or :: erN s to be ~ supplied by othe.:s directly ur th rcush C.c., .y het a 1.-an s..: W1 eo allcw Centractor suf ficient time for ins tallativn in ec.cplie.ee wi.th the specified Schedule of Cons truction. ~ 19.3 Eatif_icyr ien,: Centr,c or shall notify Ccnstructor 7. ptly in writing u,cn knc.:1nd;e of any ' n-na h ; ccuse for delay, 4 C. ..y will use its best efforts to p1 w at such delay. Failure to So '. f fy. Constructor cs required abcve sha]1 cer 5 ritute waiver by Ccut netur cf any concessicas or benefits specified under this Paragraph 19.0. 19.4 Ce l ays...t.?. i th in Ce..n _t_r_a c..t o_.r ' s Cen_t r__o_.l.: No dditic nl cr-m- cion or other concemiens will be allcwed Ccntractor for an; A.q-cs incurred as a result of delays arising frc causas for vbich Cut esctor is r,.:spensible. If, in Censtructor's opinien, any mch d='ay is saf fi-ci.nt to prevent Centractor's cocpliance with the specified Schedule of Construction, Contractor will be required to accelerate tha wo.rk ti.rcqh cvertine or other n22ns, at his expense, as necessary to allcw for ccepletion en schedule. 19.5 Delays Seyond._ Con _tra.c_t or 's.C._e_n _t r_o_l: In the event of a delev. in delivery of caterial to be furnished by or thrcush Ccr.;any or of a delay that is, in Constructor's opinion, caused by circu-2.t nces L.. c.d Center.ctor's centrol (exc2pt delays due :o.uther), Cens :cac+.c vU l inics ti; ate the cau;es and re. edies and :9.y eT.iL 2 or aun' M e* - ty,f the procadures set fcrth beicw. Contractor will be prc.c.ptly ac i-:' H s to which precedure shall be folicwed: 19.51 If, in Ccnstrictcr's opinion, the currect pro ccis of c the uork is s,tiafactory and the delay ia ninor (Inss t':ca - s /.cys), Contractor :..sy be recuired to cc.gic i a the ' cork f a ccord-m e with the spac4 fisd Sch.;dule of Ccs t.,c tion with ..o $1' ce i for extra ti a or n.tra corc;en;ation. i l I i 't.?51:3 GC-1.3 _. __ ~ __ -. - __.

Cen 7!1 f*cr>'t.?ns

  • .; ad'iti.9a1 r:..' ' n. ry,

19.5251 e.n iha-ring, or.M erical cn;-nse ac tu a lly : :: ' rad sel21/ h=: ause of longer shf ts, nore :ays .ri:d'per as, or uitiple shif ts par hy.

p. 0

-_,...m,.. m e.~-.. 7. t.. *r* .. a 20.1 Tm 'nat ha for C.'.u. e : If (1) Ccntractor fails to conform to the requirrents of the contract; or -(2) Centractor seeks relief .C.:r any law for the ban-tfit o: insolvents or is adjudged bankrupt; or (3) ac.y 1%s1 proteading is c::--.enced against Contractor nich, in Cc u t.me or's c-'-ion, nty interfera with the perfor-.ance of the contract; or (a) the p:.3 s cf the vork is such as to nake it a; parent in Ccnst.uc % r's c.;f rica that the work will not be coupleted within the specified t!..c c.nd Cc:.pany hcs requested Centractor to take such steps as are ne c mry - to acccup31sh the required prciress and conplation, and Cantractor Ms fniind to do so, Censcay asy at its optica :nd withc"t prij.4'ce to.ny other t's,ht i t nny hi-re, t ake c'. - r md conple te all or Art o f *.* 4 .:k . :! v;; C.ntr ctor's.-qu';._-n t J ad fa cilit'.as at the 2:.k uif.e I ay teminata all or part of the centract. Ccatractor shall be lie.Me for any :J 'itic.;al cost to Cc ps.ny arising frca any such tauirat %n. In t'e.-_it of any cuch t.::ninar#.cn, Centractor shall vacate the ork site of the. cork ',ut sh.'1.1 not re.:.ve any naterial, pieit, or '.qu'; -n t f t%ut the prior S, 2 val of Cons..uctor. 20.2 TerMnation for Cc :,any 's_-'assens : Should Company be required or deen it advisable to ter-inate the contract, it.22y do so up a writi.en notice to Ccntractor. Cener,ctor thmnpan shall take wh. - ever acticn with u yact to ptfc c nce of the work as. rill rand to ninf.n'..e its clain ayitus t Cc.pany. In the evnnt of mch tc. 'wition, Ccapuy shal.1 be lisble to Contractor only for the value of the v. rk perfow2d to the date of termination plus costs reasonably f acut red by Ccntractor in teminating his ep+. rations. Cent.racter shall not be entitled to any pa>n nt for anticipated profits on unconpleted portions of CCn!ract. MIS CEU. A':EOUS 21.0 .G.'::W-L- '* iterials + hall 5 2 m ' - e 12 ' :- r t h e 21.1 M2ter'a's 2nd Ltheds : work, the best of their kind, and subject to the appce, val of ra w .::cr. Ar-ic?es or naterials e.ay be substituted for these s7scif f ed if c Me r~.e, c._y with the *.ric ten cons :nt of Censtructcr. Ins tal'.a t ' ;.: of rectured ir u chall be in accordance with the roc d a i '. c. u o r s.

cifica ion of rhe mufac ture r, excep t wha re oth.-twise'.

c

  • thd h m'n.

':". e n.- t' 's to.2d by Crntractor shall ha such as vill ;rch. e .:.i: f.e tu:.y uc ck in u;cer > nce with the

  • ras t c.un en t practice.

11.731:7 dC -13

t .r,1 C - :t c ' :s 4 12.3 C :r ri:n: 50 d'r :: c-: : watica 111 14 ie to ( : 7 '_. i ' * ):

  • O r " '- J.

~ 1 C e O f 51. ley ~ c r r. O, T cI I k c t., "T" OL'Ir,-

  • 'or 2..y d0 lay 1seulting therefr:*.

9.3.Q c. :.;.m..: :::r "L. rec '. 3 :

1. r.. r, 2 _ f '.%

TQ.::..C D...:s 1 av - ~,. . *.s a 23.1 ?a "I s r ! < c s a,d C.:n du c t o f '.*e rk : C::t roctor shall 0.1 - 'nd c-

ct :h2 work :: dequataly safe;uard a31 perse.u and property f ca injury. Centractar shall direct the perfeinance of the work in c: pli-ance with reascnable safety regulations and work pcactices ind with all-epplie Gle federsi, state snd local 1:.us, ~ rules, and rquhtiens, Sc'ed-ing,- M e,uc limitarfons, these of the Division of Industrial Safety of the Califotata S:. ate Ocparte.snt of Industrial Relaticus. All y;.u mel shall wcar appre:2d "hard 1.ats" c en at the work site except as may be

~ otherwise per--itted by Ccas tructor, b'ork in areas adjacent to elc-ctri-cally energized equipnent shall be perforrad in accordance with C:pccy's e.MSlished safety rules and as directed by Cc str:ctor. Cc ; ay may rqtire Cents: actor to cheerie re.v :.: :ble sa f"Ly p.-c. dicus in um.'on to these ia use er pr: posed by Co nractor.

'rither t':e giving of meh spacial instructions Sy Cc27-z.y nor tha adhorance the.reto by Contrr,cf or shall reliave Centracter of the sole responsibility to ed ntain so ~c and afficient.Grk#ng C ?A T. tio:-s.

23.2 Ide nti f f catica 2

  • ns,: Ccatr.cor shall

,;1y,-d r r ite its czplcyaes to wear a distinctive, visible b:,d ;e of 2 'entification while on Cc.peny's property. Insofar as practicable, C.: ;uay will cequire Centrector's *=playacs to use cne entrance (as designated by Cons tr_ c::or) in,; Ng to and from cork. C:st.uctor's ;, tests .t.d vim t crs v4.ll be requi. +d t o secure a pe. -it frcn c:ns tructor at the t.ork sit e t o - ':e r, and will be logged in and out of the propet ty with the pe: nit b+ing retaincd by Constructor at the tine of logging cut. Ccatractor's picy-ees chall not enter electrically energized equipnent areas or other areas '~ cut of ccas tructica 9.inics -xcept when on of ficial business or with the e:.prcas pe rmission of C:ns truercr. 23.3.L?df.tdonal Pracauriens: Should Constructor requast th it Centractor provide certain safeguards not in use but !.eec.ed neces u ry and shculd Centractor fail ~to comply with such request eith!.n'a r3 acn- -ble tine, Constructor ey pr: vide said safeguards and Ccnt;,setor Ua11 tr T- tese Cc-pany for all e:<panses re-uiting rhnef t r. !3.4 ?:ctectica of ?' cot s and '.' alls : Can -act3r ' hall.: ot:1ct 411 f'ocrs and trails frcn f.ju:y $nd discolcr iticas, he t o e.. " :.: 2 to cils c'd ether afscolorin3 ,3, s,c s, durin g.sa &;.-.inc e c f the vo d. k.v m.s'utv cr disc 31orv 'on a1.1 *:e rc. aired at Cani ac t or 's v.:, - m. %.h re-att s %'e by Cc.at t ac t.vr sh. 11 be subject to the appraval of Cc. a t: clor.

11. 42:2
  • -C 17

=rr r r m---m--- - -- m -m-re-- m m - - - --,m-=-----

. ~. - Gen al c,." ' ns s.7.Q - ; ~.m

r..,
p.. r. -.

\\..c - i p '.'.d.s c:n 1 A .w .1 .s 27.1 7c rk Si t e. Oc.di.t ' rn.s : It will be =ts nad that Tiu Ier h is visited the work site and that the pc;;csal is based en a full 'er

e of all conditicns that wculd aif.
ct the cost and cenduct of the :ork.

Sid!er shall infers '.ir= elf fully as to the ph; sical conditicas at the wor'. site, including as appl'ceble, cubsucf ace snoMy, borr:w p' t etn-diricas vnd spoil dis; cral aress ; the avai: ability, locaticn, .d ' nt of construction and storcge facilities and other facilities cr stru tui.:s abcce and bel:w srcend; nacessary safety precautions and safeguards; di ensicns not indicated by the drawings ; the extent of estrMii ad l'nas and levels; work to be perfern+d by Cc-pany or others ; all rulis, casu-lations and requir. nents to be clacrved by Centractor in tho en.5et of the work. 27.2 Visit to Tork Sieg: By appointment, Ccas tructor will cen-duct 3idder cver tha.ork s'.te 2nd will indicate t'.e var'.cus ft.*tiras of the mk and conditiens to ':.a eneco ntaud e-.d ce; ply 3 %.!nr d th ay available useful inic.u.mti on. 28.0 p!ATEPsDLS, FjCILITIES, SE?NICIS, M'D ST?.CCTURES EL.P:--ISE-:D-- 23.1 .A..&.c e s.cv.. a.n.d.. S i f e tv.: Cen trac tor sh.'1.1 's. e t .2 e to his m satisf::cti< n, acd he,so'.ely r n,ca:'b]e Se,

  • c 1

7 d safety of catarials, tools, equir.ent, plaat, :. 7. r. nry oc ; - oc struct.ures incidental to the :ork, searcse or office v;cce,.c.d..y

ther-facilities and services used in the work, whether fur.F ;had or constructad by Cenpsny, Contractor, or others.

. ny 6 win s of n ch st- .- r" c 's "s t r-aished by Cc;c;any shall be do ad to c. hec >in! a,.1 c +f; i i :. c. ily..d shall not reliave Contractor of cay. og sibility. 28.2 Coppany 's.,Equigne n t,: IQon Con'.ractor is for.iittad to ine Ccgr.y raterials, tools, f acilities, or aquip ent, he

  • all
>t

!n such in first-class conditien aad racd ripair. Cent r.'ctor rNil be ru pensible to Cocpany for dar23e, alruse, er lon >.' -e wf. 28.3 Contractor's Equir ent: Teols, equipaonc, and ple-at pro-vided by Contractor shall be caintr.ined in good rnpair end ef fident cperating condition, and any which are deanad by Cc.nstr ictor t.o be n titt shall be rs ccced fec the work site ..d. spi.tcad by Cont.v.ctor. 11.. M :4 cC - i.9 m- ,-.__.7 ~...n.. . _. s- ~

-<+ Ge-'.:al C. di ris ns 19.6 'jy'*.c '.* ' : q ?".is, C.'. y -l .;* ra aL= f:c:

p-

... s due L eeu-da r suf!'. ' en t funds to ('.) discim e aa; :-li c

t r:. t

.s of Centractor for uhich liens c:- C:. : pan. 's pr ;ter.y '. ave ':n : sr - a Se fi'ed, and Cenpany c.ay at any tire pay.heref rcn ' for Centrac:cr's rec ~nt such ancunts as are admittedly due th2roon; and (2) :cp11r or.ep: ee any work de+. rad defective by C; any. 4 29.7 C'a bs..cainst C:.nanv: he acccptunce by Cent ractor of the finsi paynent heraunder shall be deened a v:aiver by Cc. tractor of all clains gainst C=pany. 29.3 !.abi_li ty,:

either acceptance of the urk b/ C~ n.ny c..r ccc/-

rean t therefor shall relicve Ccat:ector from 11,5111 t.f >.da r -he ic

  • i f ty or any of the guarantees cont 11ned in or i= plied by this - w;.ct.

30.0. DDITIO!'AL 1:QRK OR C:D::GES 30.1 C_on t _ry t_p me _Gr '.;rs : Ce :p my sy. qu' ra Ont .*cro pe rfona additicaal. crk of a na ture s1.ai toc or rein t.:d to t'.c ::m:k, cc-vidad for in the contract or may require chen;es in the work ur in r.:.a provisfons governing the work..idditional srck or cb.nges shall 52 per-fotnad by Centractor caly when art';urized in *. rit!ng rad sf, ad by Constructor. 30.11 : o cubsequen't c.' 6 will be hono. ad for ' it Tb'e effects or eine Icst result!ng frcn work cc..ned and pid for by change order. The pricing shewn in the change order shnll include all indirect or inten?.ib:e costs. If a satiff,4.rcrv. w m'ated a price c.'ncot he ap c.ed upon for ch.q.!=, addiifi.nal "o.k, or clafrs, Cenpany has the cption t o ;ay for all or sny put to the disputed work strictly in acco"d.nc2 with 1.he res' of the opt p'es previsiens, regardless of Ox;mnc. 30.2 Increase in ;;crk: Chense ceders that uquire an increase in the work shall be priced, at Co.-.p;ny 's cp ti.n, on a lu2p-:sta b a s is or at centract or other unit pricas or on a cestaplus bsis. 30.3 D_ecrease in W rk: Change orders that r+ quire a eductien in the work shall entitle Ccepany to a cr.=dit of ei:N>r in - ou rt c, wd upon between Cons tructor and Catrac. tor or en - m v. - ~ 7 ' -d a tha 'cssis of ccatract unit prices 'or wch Nck. i 30.4 Wrk Sebcentracted cn Ces t ?lus ?. tis: .\\ ll.s.id '. i '.:al * -k or changes authorized to be sube.cncoc 4d en a mt?b s 'r s!.i sh.e l be perfer:-3d 'n accord.ince wi'.h rh a p, m ' accs of pv.,73;h :.1.0 foi: e., ;. Co, racecr shall nar,oti ste all mch %'." arrxr.s dd act, ad ao tractor shall fur:.her sube.cate: c t - av..sct of i a ,ck. 11.'4::6 00-'l

. -. _... ~... - ~u.. s 4 canersi Ccr-iti:ns 1 31.12

  • a t.> ri al s

.d r : ltas mliy. n - d i n -J. 3 ..c.'- imel :di.g sa12s or use it::as th -:A:n nd the tr -pe : + t O - -f, all at oc: :.21 c es t, ! css tr-Je bu: r.; t ensh di sc :i:m ts 2 n d '. ; ; s {e f 2ir value of .2t erials ind su:,, lies alv.t.r.ed and retained by 4 Centractor. 31.13 Fror2ta s. cunts cf prcWas for the insurance r.w, ' ed in Par: irsph 13.0 for2;.;:ing but onl/ up to limits of $200,G.'O.c.: any one cccurrence for the insurance spacified in Faragraphs 13.21-and 13.22. ?r.=z.ic s 'or other insursace shall not be soprotely rainbursab le. 31.14 Tacidental direct cos ts to contracter.n ising '!., c ly ft:= parfeir.1nce of the work heteunder, prvvided they are,;.. d in writing by Constructor. 31.15 A fee qual to the perccnt23e stated in Centvet ur's p.:cceal of the total of 7:.gra;.hs 31.11 thrcu;h 31.'.4 a to ccver.m ng other thin;s proff t, superintent:Oce, ~ie ld ei l'.:n, r-scnnel, everhead, rental charges for ese of tcols snd .i Je se valued at less than $750 each and all other general and 'ad'.ract ..: pens e. 31.16 ?.antal ch. w s fue use of C,- -c.. o r '.s o ', .it .alued at $750 or nvre each at the rat.-s '.. ! t t e d by F - R c;;r with his ?ropesal. Such rates shall be the type of re atal rat's specified in Faragraph 4.14 of the General Ccnd.i ticas. Fce any rares required but not inc1.uded wi th these sub.it .d with c'" ac-tor's Ptopesal, reinbursement sh,11 be either (1) ~or c e v a 11 at rates not in er.cers of 75 percent of the rates set ivrth in the current edition of the " Compilation of Reatal ?stes for C.- st.vrtica -quipnent" published by the Associated Equipnan't Distrth" tors, plus fueled and raintained rates as cutually a. greed, or (2) fully.por-a:ed and naintained rates as nu:ually agread all as p cvided in ?arr;raph 31.5. 31.17 Cest of transportation to the work site and feca -he work site to an agreed des tination including icading and un.ieti'ng of equipment not self-prcpelled or resdily novab.le to the e:. tent that such payr.ents have not been rai derud dira:cly cr ted'..a.. '.y under other itans of tha centract. It :sp u r r a t iva '.i. ' ' :.e d t.o locattuns within California, 31.18 For approved additional. vork pe ric -sd by.1 'a - c e tr?ctor, including s.. .:catracts for t.:acal of -e;t'-.e. t : -d tt $750 or roce e,ch, Contr actor eill Se pa td the mb c.. r .t

t plus a fee as set forth below, Ihis f2e dall cover er u ".

.c 's pralit and al.1 expe.:ses inc'. dant to adn'.aimation of th e a. r oct. ;L we. e r, the faa thall not apply :o.anral of ,o', "n 1 sitbsidis. r ios of C.:ar ,,<.t or, f ran hi s p.U:t:- ' es or. c - - 11 -/d'.'.m, $11 - * . e !. - 1 +* air -chd.' .$.3. 7- ' ':r ? C ind i * ' t il t h..f ai l, s v. $f.ttfd r0 3r .1 .o., r, .a e D r 7.<tra WCCh or ch U pi >+- Ye. 't - *?d

  • I1 30 f. ! p.1/ thl 3 e

, -d to t'a fM b ' u .:v t s.

1.. " ? :3 cC-73

.c. e ...-.-..r..,,-.- .-..-..,c,, . ~. - ..y.-..,. e --.w, -- +

.f ?.i _..t s W i hv Cc -:cac t ; r for :.:41r er r.# 3. 31.32 i' - it 2 c ' A ctive

rk cr c
c.s of - 2:e ria' - u r -d due to carel.2 5 :-; ;h -

-.nship, or c s ts of my work pe rin +d chich,. 'n Ccns truc:cr's opinien, is not - scessary for the perf w.:ance of the auth.ri +d. rk. 31.4 .D..a t a R e. c.u :.r,d.: For all ces t-c.lus work > Contractor nall f coitcs for e. rrc:it with itari:ad raceipted bills for : st.: rial

.".. ort e

_nd subcc: tract work. C:ntractor shall sub it certified copy of payroll ccvaring all 1cher empicyed by Centractor and by subcontracecrs perforn-ing work on a cost-plus basis. Satis factory evide nce shall a'so be su'-itted to. verify :starials drawn frca Cc.ntr c tor's s tock, r :ntal of C. t:,ctur's equipment, and ether --Isc+11anecus itcus of cost not ctherwisa verified. 31.5 - i;nent F-ntal: Ecu 33.51 - -.e_S.'.e m. b ly.. %...e s : Fcr 31.511 hre wthly rates shall 4.wiur'a cyn rat-ing labor, oil, fuel, grecse, a d ecst o# se cticin3..nd .a ! n ts! nin~s rhc ec. f...- at. 31.51.2 7 ;u f., me :ws f.lsb la at 'm e.rk sf 1

4 s ' :d

.'ur incident al ec s t-,.1us '. ark wi ll ba. l d for en r.n,hi orly rate based upon the actusi hours (inclu 'i:'S CL'rt.i. c) aced. The hourly race shall be 1/176 of.the quotad ton 61y rste. ~ 31.513 If Ccrpany --"':cs a ri t: =-n. - c,- cat fc r Cca - t ractor to hold certa!n equ'., :ent at C.a work cite a cacially for cost-plus work, cenpc.n=4 tion for stradby time will be 1/352 of the c.ucted cuthly re a for th.e hours such ere ment 1 a is not used during a 40-Leur.eeck (or 1/2 nci..ul d ntal re t a). This Par.srs;h ;;nrantees Centractor.:?i.0um.. ant for at 1.t 2st 40 Scuts ;er ceek at ene-half ut al re.: cal race. 31.514 If C pany reques es Contractor - to furnish special 'quipm nt not en hand at the ccek site fo: usa en ces t-plus wrk, Ccnpouy will cc:pe nsate C:nciactor for. 2 + t of roving Nch equi,.ent on 2nd off the uork sit?. Cc ; m.- 7 tion #3r re ' al cf.uch aqut;-snt will be 73 p,im - of *: 2 ntes sat forth in cha lat ts t edit'.on of the "Cc.:pi' u'.ca of ?ntal ?.ates for Ccastruc tica Equipment" publishad by tha W ociated Equipnent D

  • s t rib ut o rs,

if th4.s equipr.at is m d for icss t'un ena ' - k, an heurly rate : pal to 1/8 of -'1 i d.41y rt...a1 var.a vill ta paid up to the cucunt o.' rha J- '.y te. Tf mch qvi;. -at is 'sced ore t' an ene vuk .d' r'., c ae - i h_,.p n '. u r ly ra t e

m T. s.o 1lLO tha

,s ty a vi.11 b a ;1:.d :p t o

.*..a 2

.an t of t.h.t w.h ly ra c e. If h . :t-- i c '.; .; d.~ o r m r t thaa : e p h, c a br'.y t a , a l r o 1/1. l 5 - % u.b l y a2 all.~.a, fd. i'c

  • a 3

a :.a t. e. :.s te, r a, _er,.j ..y 1 - of tN m u ly .1 na.

11. 63:2

':C -i5 a.

J -3 e;,,- -,,.5 . -..c t : C. man ~i ci ll . :..e r m ; ' .31.Y

r. i.ty 1 32.3 :: 'c s

a re a-int with th e L'.:i t + d Ir.a t a s At:ni c In >. 'sv C.:r:-is s i n s, x.,v' f-d in Section 170 of the.it:nic E.,rgy Act of 1954, as anended, and d e previsiens of 10 C??., Part 140. 32.4 ?-ried of'Ir:urance: To t h e +-:.: t. a t.vailab l e, the ':.c u -. e end '.ed. nity.irra.y.e.ats to be obtained by C:...pany shall cont'm:a '. n ef fect for such period as may be necc.s sary to covar liability ar's!..g out of or resulting frca the equi;nent, sterial, and/or services fur-nished.crsinnt to-this contract. C.: at r a. t dr sh all b e p w '. d, ;:n ec.,uus t, with evid.-..ce tha t tha Cc.p ny :... s ..r ared int o the i_Mu -

e and i.: ' aity arranc iats cut]' +d 2 boca.

33.0 I"EPG..E.NCY viH. ICLE.- 33.1 If an +r ee;, cy.:h'cla '3 t r. c ' 'ed fo r t ren r;o t t ' n g '.. ' :u t'/y fajured proj ct c. * >l to "!cil f..il'l' .4, Coa t. r.= ct o r s h a l 1 ' r.a t.311 '21e e,...cific =11y s i <,.. c d -.. c.a v:.o are qualified to drive de vehicle and to care for the injur:-d in ec a of v :arsency. 33.2 2dditic 21 U. ! ts: Nothing centsined '.n th.1 ? act - fic5tien shall re R.vc C..v 2.'.tsr f ...n c.o r' Af 3 s id vi..t r in'r3 211 s t :e t e',1rs, b le. ',e t s, & :t :.44, .turial id fi-a t -r f d '< i'.s -1 ., 4. i d by any a plic.ble 4.fety c r ' =r of t he Div fa 'on of InJes t. ial ..f.-ty of i the Cslifornia State Dcjartr.:nt of Ind"s tt!al F'latiens or as rr.quf.r. d by any other federal, s tate, or Jocal laws, rules or regu1 1tiens. I 9 s 'iC U .--,....-,.-.,.c e,9,.., e m - ewe w _

.. m G- - i..-- - u o-e; 9 P..gg. .....,.4 a .,3 33, e 7 ,

  • v s e s.e e Cyp ne ens co

+ s r. $t-.;ae .7 T 4 e C 84 =* a. a... a s 3 7 c..* * *- Se a l a ,.3.,. .,7 -)- 't. L*G t..*T, '* G? ..E .( .m_. .. ets s* 5 .s-e.__ . A.-.

  • 4

..c

  • ,.v.

.,_.t 1-

  • ?-O I.

..e. o

,,,q.__,.

. C + "g* ..mre

7. 9.

.r ,.. (*.) i,

  • ^

1 . ?. { **.:.( a.;,(.* ( s au.. t.* 3 *. *..t # n s. 3 :.* t. >,.. /. t. ( ' ' '

c...
r. (*.

r ..r..., .t ..w e. s. C ..M..'

t?*: : r.i'
.!.u:;-
; -r'm.i t! 5 a t. f u ir f
er a. -i'.r.f ;.. !, a r c.. ' - 1:*
  • ll

..,.. r,r..r..eg. .. r,.. .s = (.. 1 -<.T .a.. .i.. g,. ~... , r..m u. : r..' e... r t-N,/ .I i e,.. if L.: t.. .a. : 3..~'af i.-

c. :

C -s ; .6. .. \\ V. [... C., f

  • u e%t-d to ;. r:' -: fu Cmtruce ' : it. r.

..i* b k. .... \\- d- ..a -e. - ,.s V .e . u.r,, ...r. r~e r.. r .,1......s t =.. ,....,..J..!.e'....- ,q \\j ?.**'?...- ..N 4, <...

k..

a u t, s. % : 1,,, t. : n yr:. -p(/- a). t w c..w s - e :. n n.v- . : 's tt u :

- 4*n,t h fi k ;f,; p.

.1 r. *.a ;.:t (10 c f r pen'.\\11 : e,,.** * 'e : - t. Y.*c. '.

  • O t' c O lr br's !.' S f,,
4. *

. 7. 4 .?.,. . ; e...,.~ 3 .9 ..,.p, 1% e..,.,- e.

  • s.

t.: fa u ' w :. a.< e. w rfe.... e n f. y 4g%

a. Ns

,* \\. %..*~ N. -t..:. r N'..' s f... :s: a (..*. 4 t y .t S a e .,g.....+. ..,.9 I t a p .,f. l i s I a g .s I %.4 g i i ) i .~,,.....,,o,..,r...._.-,


,------m

-- n- - - --u.--- ---.-------a

a..-.. -..a..- -. ~ -. - e

  • 3-123

............ y3... S h........ E i.. :.n 2 3.t. .....u r. ,g.. . -- p...- o c.i . 2 :....,.. - t s y .c .5 3. c ! (* i - i;i; a '* -' 4 2 of C= r rie tor.... _ .u. 2 3. ~.<*.*,.sa of Cen w tor, - C:rpr: tien, -.- _ ~ Firt .a.hi p,. T.s ri t iip /* .:...' t or ' i s a : s ~ 1

  • *.=. ' L :r.:r eit c io e In.tn.ce _..

.- ::: :a ::t:mt . -i t ' ' ' *.. n r - r.... - ..s* r.,r's 7... o -1. Sa's Cc.,et. ti:n Incuu m e: a. t.*n h:*tn's ce;. c..eti.:a carrier 5. " n *- n's ec.s.a.t f en m:li cy :r:.:ba r....._. r ...4 :tica ~cc l ic.y <..rf o d._._._ - c. .'"*- n's .-e 2. Mic Li. 511ity I c r: v:e: - a.- 2.:/11Y tr..E Y 1 h bilit-/ ca.ier L* Lit 3 b. Fre.ert dc:.ca.e. lit.bility cu rf er L.c '! L s...... _.... 3. L' -511! ty Inrure: : c ethc.r '.hr.n.'.*te:::sbile: 7.! 'es a-e. ~.itiy in'ur/ i f e. bili:./ c.u.;ter.... a

3..'
.s b.

T.

ety /
:
  • 1 lirbi*ity c3.zier.

r*'c s:

'. t.d C.cc.2 F.'..1d ?-3.o11.'..;at f.o bc ~.,. ~..I tfr ce

~ -~ t o Im'r,1;.t. t i. n : 1. 9 s.i che pr...:-a

r. e.a ch:t cul 1 ta e *

,, 4 tL.2 :. t: - V -:e for i f ' s c f i' : 1,e ' 3 / O 00,0s,3 h dily f.*,..y ( "I d 3 -). t I 1. J,.. 3, tf .,1 1 1. ( Wdit.g s u :

  • !* a).

C ;. e.. - s1 4 0 t.)

  • t :

m / 3 .T.* fts "/:,.0,0 %d i.l.y..Ia i; t.y 42 !s .otte. dile s) f 2:. ). C.,0 /.?.00,. 30 o.f..T... y - 1 1.,. ( >.cludina' l 4. Opt.rctican, if c:'d C i S. ('w t1 et.>r 's., : t.- ti te - c.

r...a:.. e &u 1 4

d. C...oloD d c t : (:f ens ~ s s Total Li-fts Prev.rty 0 - t[a (c..Yeludii.~> ct f..abile.u) + 2b -{0.6. 0./ $.2.5 i..0 t a. Ov:2:aticas,it nd C f. Cc.e:roeter's

t: ci.ivi e

Ccatrn:tual e. h. Cc P.le' :d cpwations .s AOtal ' ~ ~ ~ ^ To al.~94.ly Injuxy e sud L:; i.y C u ,3

  • t

.t 2. I f th a s : a i g a 1 :' no !.,y i.h.. . t- . '.a c '. ; 2 ,/ his u.;tle-c c.. d.r, t'. a C., .y.;41.1 s ,taa>,; e, J '. r d !:*. it to i:.tx,-a..c t*.3 s.: t ..td. .* w 's i .*c 3. 9..,1 (; r,c ;t w. " cent), f f y, !31y ' i 1 ;; ?: '- 1 1* 1 '. j ,83 ix; "ho e, ,y a:i.t 1 ' a.t. '

e. 3.

s- ;): (, 1..? L..,

i.,

a, - \\ t o 4.t.s,;. to *!1 tty 7 .2 1,2 t.*a c j .;r /. 7 *... *:2 * >,:? :1 t*-1 1, c'.. c. ,. ny 111., 42 . eg 4.~0,t,:n *a,: 3 *.,'t; *9._7 ; i 3, y e 3 '. t. 3 1.s e- .r. ~J t

. *. s..

2

),

1*.** (;st - *f t.j f (.

1

' '. " ;) 0 /) J

  • y '

) { )3 /$ .-s. 1 .., f

4.,, I n.

e. s * .f. f . 'a s* t, t l !, 218.; f. 1 Ei' ) f t.h ~*t

  • I

./ 1 if p3 t 4, 1 { + 1, -t. s. $f..* P' a p, ,e -{ t.

t...g a

u. s.., c ' o.. 1

  • t,>

1 = t e, e ,J.g {, 3 1 1 ss-<y. .a -ee v .egygi. p=.-wye--*.e---.g.. --e '-g 3.-a eW py w -p A. d. we ,p ywq y.g %,e..,..-_qi,-. p p' y ....,..._........,.........-.,....e , ~-.... m s ..c ..... ~ s.g.-y

.......2n . ~ - -. S 6- $3 3 -.,.?. ,.,3 t. ,. -f - 2 :.r- ,-*s-et 3.- ~Ty

  • L L

-...L O...O..ll:C ::.l._T_S 1 3 D.2 - D3: ?.iCIFIC CAS A.D d'.ECTRIC CC:FA?."i ?OPOSAL IN2 Manager of Materials Dcpartment Facific C:s and Electric Ccmpany 77 32 ale Straet San Francisco, CA 94106

Dear Sir:

'daving carefully +.xantnad S;.scif f catica 'to. 2848 ad the i c e'.:;s for the Final Pa'atin; at liablo Canyca ratt s 1 a-d 2, th.'. ? -r s ' 3 n.'d c ;. 's to ev.ecute a contract t o. r f :rn 'll ' rk J.* t f.a t h i n d in :-- 1

i. h the Specif $ cation and accc.:q.u.yf ng ud.c;s c.d to u m p t.'s fu ll p;,

.n t >r nit prf ce.s e ad 1.c :p sun a:. cut s ut said work cc pensation established by tha forth for the various items listed in the pages of the pricin; sc'.+dule follev-ing. Prices are exclusive of surety ' nd ecst but ',clu*e all tc .'s inca r e.sd in the perfer snee th.ceof. The prices queted in the pricing schi:le # re 54v-d.u;ca all cc co-nents of the equipeent and/or raterial used in the <ork having Sean pec

  • ud or manufactured in the Lnited States.

It is understcod that wa ray also 2.:br it 2 c ;2 rata progesal .; 'd upon use of foreign c-:pcaants, cvided (1) ' e quote an aturnate pr ica Zvr each propesal ite af f ected, and (2) we subit a detailed list of all 'cre'.:n cc:ponents contained therein. For work p rforud by Cent.racter or sube:c.crae* ars. n a c 4: -;

  • a s

basis in sce cedance wich F icasraph 31.0 of the Ce vil Cced f :Ir =, :'m s are quoted in Item 10 of t.he..ri-#.n3 s. hedu2e. It

  1. . s t
  • rstc.*d et te 1y e

of the iters of re! ' ursabia cost sat f at i.h in Fe.1;;aph 31.0 aca ,i '. f censidered as cverhead, and thera' ore, M.e f.sr.s quo ted.sta.1

b ':.,u.s.

It is also undarstoed that all f ans q :ot ti will ba an ' ;.r t ant factor la d n.:.: f e. '.:; the award of contract. l i 1 ,m=*.wm.=pe-. e.e.e.:- -.e e> a w.m._,.,. c..g.. m, w.,.,y,,,,..,,. y a

8 i

Its

,,i ?cr extra eerk perf:c; d en a Iur p--r: or acc ad price * :s' =, ca scree t: suinit for Ccas truc tor 's ap,.r: tal, if rquw.d, a c:np

  • a te pc f e breakdcwn in accordsnce eith Farsgraph 30.6 of the Cen=: al ccaditiens.

?c e such vork, the au:unt 1icir'ed to cover Ccntracter's and subcontrac*crs' f.as on the iter.s listed in Far w aph 31.0 will not ex.:.vd that allewd ly ':e ' cs geted in the pricing scMdule or the fees cciff ad. ?cr surety bcnd, if required, Cc p w.y 4111 pay the actual ;c. -fu. ces: thereof. The undersi;ned submits hcrewith the infernati:n requ'r.d by Faragraph 4.0 of the General Canditions: i j 1. Any preposed cha:Se in the ccnstruction schedule. 2. A list of prc; a ed constructica plant it. is. 3. The nanes and addresses of all pr:pesed mule.ntreacturs. 4 Insurance Questicanaire and "'fastar In -nr.nce Peep am." 5. Equip-' ant rental ratas for m,: ipr ;.,t .-l.cd.it $/10 c - >re . cia : (0' a, and (b) fueled and n.iintained. The Specification is signed and returned hemith. The undersi;n,$d a3rcas to cenplate all mrk included u/ ler t.*d.4 C;ecification in accordance with the construction schedule set f rth la %c-i tion 1 of the Specif! cation. It is understood and agreed that no ext.afon of tine for conpleting the work beyond that specified in said cons ructica schedule will be granted in case the actual field quantities of ..rk aca.d the estinated quantities that are set forth for the various itens in the foregoing pricing schedule. The undersianed hereby certifies that am/are licensed under Chaptar 9 of Division III of the Susiness and Fcefesaic:sl Code of the State of California; the nonber of the liconse is and the date of expiration is ~ ~ ~ ~ ' ~ Sa::e of 71):s..__._ i. Address PSene Sf 3aature of Prasident of Cor;.or:ttion Signsture of Secretary of Corporation. C.cyceica '..; organied...dar 'ho 1res of i ha 5.na of S7 AL i .~.. _,.,,,_~_.,, _ m.,............~-.,,mn-_.-.n.~.. n -.

p... e..., :

,..,..-._.__.,,.,4,

f> I s t .~

  • l f&

f ..t. 7 ?- .* e .L .,.,G- ...r 2_D 2 2C A u. .2. .:0, c_' 3.f S.I F.__.C T I_C_S_. O F. '. . ". IITY F *:iT .' E _.. 1 c,.

m. ' en ' H 1 A
  • n g (?..ja r h 5. 2 3, Se c t!.on 1 2n.1 T.r nr s-h 1. 3, E.< c t i an 3).

L.S. 2 7.--s en laber (T ire s..=rh 1.215, Cacticn 3), size of crcs to be Icto.=in.d by C;r.structor. (C r +. a = j;b fc. c. :n 75 s. ac ' n.) 2.vera:;e Cre i Ter '/enth A. Up to 6 m'en. F.r-at 3. 6 to 10 man. ? .it C. 11 to 15 nen. P.3 c. c.it D. 16 uen.:.td cver. ?.rc.nt 3 Fe s en : aarisis (?* cay aph 1.216, Ncti. n 3). a' .it 10 Fee en incidental force acccunt '.ork in accocdsnee with Paragr?ph 31.0 of the Caneral Cc-aditions. ?, -t The fees quoted above provide for the fc1.1 wi: g field paracnnel: 3idder to fill cut. i l Fr o..orin.t e.r ? e n t-A. Full time, or 3. F1rt eine heurt per.eek, or i C.

Une i

C'.trical ?ersennel A. Full tira, or 3. ?>rt tima ' ancs per :?*k, or t C. "o i. e j i ..-e .+.-~.e.ew...- ~,..,w. ...7,

) .. s

<.'. 3

.s

: s. I. t..N.

....:..\\- _e t. 7.:2y.s.r.w-.s,. .i. Re v. '!o. te .-.a.>e No. 1.v. No. 2ste Ptie No. ...P a..,.: '.*o. _. S u v..._N.o... 1, t e Fc - C ver 1 7-14-33 2-2 1 7 -l ' --8 3 4 4 sus i 1

l 4

l I .s ., f, ' 14 t . ' < *

  • s t,q

. '. ' ' t-f, q I ,y ;- 3 d,1 o ! c ti .4+ f -4 ..en,- w W W

.. - ~.. - -. - -. -.. ~.. s O. .+4 ...,.o m:. 2-2 viC ; '*o. 1 2.22 Fi.e.._l.d..ri.c :! ' a o f P rimad Surf aces : Pri ed surf e:s 4 et11 te elc red to rm eva all foreign atter.als prior to fi.: sh ceat p;'iestien. " 2. 13 ", eld Splatter: Exterior surfaces certaining < eld

platte.rs -Sat are subjected to strospheric conditices ed rw". it'cn c

,t-.i":.tien shall be r:.c ecd by grinding racoth to :':e m f ce "d t' en a sp.:eial ecating :; plied in acco d ree with rection 5. C' %c prf:crs #311 Se cL.,ed by. ire Smhing. 2.3 Zinc-coated and/or galvorif zed steel surfaces shall be degreaed with solvent t 3 ccecve oil, dirt, 3.nas,=, 3:d ch,icals ed .t.-d dry -ith cle:n rags.

.'cncc ar t w." s welds, c: : vices,,.,. :f s,.. p p i tH g, u d j o i-t s :' 3. l ' a fill d te i h :Jditiens! ::1.ic-- ri dt +.' iia 3 1

.. y d.. as its en 'cuft.ces chall be tr.a c.:d prior to coating. 2.4 Stainle.s stool surfacas to be c. ated shall be cler.nad nd d, p.nad pior to f ct'wr :urface pap ration. 2. ',1 E..S c. s

  • ,11 ha 'Ir
  • 3d wit h it:ca-fr.-e

.i to,. <. ida the pzari.lc ( nbur,.,tt cen) cec;...r.4ded by the coa ttig a' i; ur. Prime shall be applied cier clean and dry surfaces. Pcice t.o <;pli-cation of coating, all welds wil.1 Love been 3round srnor't />nd the h

" tr vill h;ee. b wi r..2 cd by ot ers.

2.42 Frg gt 9;pgre_to St.r_cng Ch.' M cals : P r c e >>.'.' r a

..c s.s ? m y ph 2.^1.

" enc ent.1: ecos welds, ercvices,.pmes, d.mp pitt*'g, sad joints shall be filled by others. 2.5 Cc crete rd :P.senev: 2.51 Ce.'eral: All surfac.is shall be allowed to cuca at le.:st30dedsbifirecoating. All surfaces shall be clean ud dey. Pohture content shall be as icv as possible and no greater thin 15 pue nt c.s r asored by a motst' ire testing device. W ter st 0 1, grout,n.x u13 r iens, ce ilir g ec.;onds, fo t:i a l s.; s e.1 ;, -tM, od o t' ' e i. f t r it!.t s 4 b i.1 ba t e.ri.. c d. l 2.32 Gnecete surfaces shall ba checked for surf sca.Mds .-4 t'.no shanli'b..c':an cyn, if found, sud chall Sa

i b A by c ' '-

1. It itz. e <.111 be a ved. Prio r i o c<u t t n 3, a s - ill .-Q 1

f...<. t u r J 1 til,J r lo fluc.

d,*. a j a r. All Stirf/c. s O 'l1 Sa .! ;ifh c1'en 'ntir.'ad vne led to re.:.we dirt o dd '""t. .511 at: ; W, ' o). s, i-1 o the c 3. cractic'ts shil, be fil' ad. it '. a m

> l Fili.er 101 s0 d stn*c'< tl"sh with t':o surface.

ii!1er .'ill ta 31'. gi to ?. y :

  • r ce ;h t.y ',,
  • u e %g i s

,,.1 d. 1.53 a u... ', : .t 1 1 r "il ty od sc JM ' ti l '.a 4,f.... <. All 1 c..e n !a l s'.11:. 'm 1 id .,0 .t. .., t J.11 S.: v 4'.y ca.:" J 3 ..-m. .._.4

O O .'1, A.() [( ( .A) )

  • 5 I d.

'4 r w.t t ut : v os.: sec. o n= 1 n :s - u :s n:' .J. O ' 7 ' u < s. C M J r.v:.. y 24, l '.;24 PGandE tc' ter '!o. : OCL-31-029 l*r. Jchn 3. LiL*n, "agicril /.'.iifstrator U. S. Flucle;r ;'c ulitcry Cc: mission,,%gicn V u 1450 !' aria t..>.ne, Suite 210 V31 nut Crcek, CA 9?596-5268 F3:

r..c t:.t "o. E0-2 / S, "L -7,P R - 75 N J ot !'o. iO-3/.3 Die 51o C.nn n Units 1 cnd 2 SSER 21 - Allegation 100 0:ce Mr. I'srtin:

The encle:1re to this ltttce provi'Os with ir.fc..1tica ra;;. fi g *.si.i..; af Cartoline pretective coatings u:cd in the Dicblo Ce.ry n cm.'ai...nt buildings. This infor.:atit,.1 uss ray ested Ly ^.he !DC ?.3 ca V Steif <'m * ;a i 0 2:r%r 5,1533 22 ting :ith.hdE at ti.e pit.:.t site to disc.::s.:.e,.ili.y con.ol progr;m for pointing (SEER 21, c.11e;ttion IC)). Kindly acknowle:1;e reccipt of this .terial on the anciosed cc)y c,f '.his letter a.1d return it in the enclosed ad:!r, ssad.invalc;e. "ir, . oly, f j

a. l.,

-l ' f /,,/,,:/ t:10 r::. e .:c : G. !/ % h"..,o C..~ v ice li st --r*~~~.

L

~ '~ ~: ~" ~ ~ " ^ ~ '~ ~ ~

O o /u T 'd:P' bit I I I,.-...,..y,.,.,s I. ..s. .....D i.- ?.g. y- ..s... i L. nu ? . I E E) P.'U f. E.- I I.M .'M I I E. - ('5$. ,1 - :... fr,r;]( s. t.9 ..*7 --.7 i j r. - u :- 2. ( j. r t r-. '..- ). -_. =, r e gs +_ + '..." g T t1 q. =

r..... ; _;: -

.y- . r, -

:, _ e. ; C 3

( 7?CXY-CCAL TAR 79 1 1 8 0.003 i. ' D.'. C .5 M :.;Iii E 3 V I:;Y L 25 i_1 2

0. 0. 9 1-1/2 0.029

. n..3 5 $ \\.". i'.- AL'.;Y D 27 1 1 O'..-: t D 1 1 5 I::0?'.AJ:IC ZI!;C 460 MIL FT/ CAL 1 0.024 -.) 1;;C 11 $ ";:4 0.U;IC ZINC 2000 MIL FT/ CAL 3 0.024 . 3.7'C 11 ED 5 INDhC.1241C ZINC 700 MIL FT/ CAL 2-1/2 0.024 --) 27NC 12 INGAC.Ui1C ZINC 1000 M7L iT/ CAL 3 n.019 c.1.1 C 14 ?fI .FDXY-CO.;L TAR 7 6..+_- 1 3 0 .3 '.S.', ? uTE 5 4 5 VI5YL CC?OLYPiR 32 1 1 4 0.0u9 i.t ti J.-; 70 .f ING.-CA2;ic U :;C U.0 MIL 'ri/ CAL 3 A.o24 ^

^ ;E ;;3-li.i? ;;i -

101 '. :' E '. '-M 21 1 2 2 0.t 07 Cec $ -. ' 'Lu !; rsr2GiE 145-

1. F;. TEA 2;E-31YO:EN 97 1 2 40 0.C06 -

... a.:.'.E 1i 0.i3 ! V i E n c.Y--:- OLY A II.,e s8 + 1

  • 4 0.t 10 it. :26 191 7Alh'IR C't$

Er CC-POLYAMI:;E 70 1 1 5 0.010 (2 0Litt-; 191 's15ISH *vf ETEXY-POLY;.2:I.DE 70.+ 1 5 O. 010 2 107..'.::2 l'33 2RILM h ! EPCXY-POLY.'.MIDE 5011 3 0.010 . !Ot.::E 193 FINISH (v $ EPCXY-t0LYAMIDE 46 1 1 3 0.010 a.: .E 133 GLCES C' i 7.?CXY-?OLY.U r DE 49 t 1 3 0.010 W..E 135 "J77ACFR C r.. C XY-F 0LY A';1 as C9 t 1 10 ',0

0. 0 :' 9

.c't.nc 200 Cw I COAL 7.' 7- {F O.i.Y 'r.;'. i t./ 0E 74 1,1 3

0. N 3 e. c '.- i.. 7 7 3 5.'- I 4:.TXY-70t'.c li_ m:

NO !;/A

1. c '- )

l

'.03 I::F1 C13 W O.FD.D iF-al.JC G4 1 2 6

'). 'S ' '.E l'. /

. a.: u0 07.1 C 32.+. 2 8

1 3

)

'a A r. 0 /1. ] .. C 0 15 1 2 O3 71 r ') ' t. C ,3 :- 2 8 3 I m~

k O -) e,..> i s.

1..

j . - -..5 O F,U:.. ; ;'. :D .y i ; :. v ~ J s-M D D F_t.T r.E- ,i!.";- s. .__c e.; : : : C_ P r- _ ';_I:S.. (.'.r t-

T.)

..: ~c5_'."' "'*' C.l

  • s; : s. :-

3 s,- - f 4: - A r

-e
P P;E 3 05 I:. MER C '.!

10DIF7 7.D 'FF';OLIC 54 1 2 3

0. ' DS

'711NE '05 FI?;iSH Cs 5 MODIFIED.hiSOLIC 64 1 2 3 0.c:S OL75E 205 SriFACER TG MODIFIED FF.ESOLIC 100 1/16" 0.011 ;I 263 PRI".ER (f f MODIF E3 THENOLIC 75 1 2 5 0. ~S ';E 253 FINISH.:'- .0IFIED F'.1. N.IC 75 1 2 5 O. .3 ~ ' T NE 2 C 5 L'G ,,,, 3 MODIFIED PHENOLIC 65 i 2 6 0.0s9 N: 372 : AIM.R.'i'. ':0DiF'. E9 7 'oD C 6312 5 3.C.3 MDDIFisD l'iE:.3LIC 75 1 2 5

1. i. ; 3 m.,.E 272 /INISH i;irt *3 926-1 t

VTNYL CCFOLYMIR 34 1 1 4 0.~;9 .it. s E 2 03 7 ',7 5

c LYvn. it.- 30. AL 1511 t/2 n.

.9 6 I J. f: s.ce. O aus 4 e m -. 2 -.m}}