7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION BOSTON EDIS0N COMPANY DOCKET NO. 50-293 ENVIRONMENTAL. ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of a sche'dular exemption from certain requirements of 10 CFR Part 50, Appendix J, to the Roston Edison Company (BEco/ licensee) for the Pilgrim Nuclear Power Station located at the licensee's site in Plymouth County, Massachusetts.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action The proposed action would grant temporary relief from the 18-month fre-quency part of Section III. A.6(b) of Appendix J which requires, under certain circumstances, that Type A overall primary containment leakage tests be per-formed at each plant shutdown or approximately every 18 months, whichever occurs first.
Need for the Proposed Action To meet the "approximately every 18-months" requirement of Section III.A.6(b), a Type A test will have to be performed upon completion of the ongoing Type B and C testing of airlocks and valves. However, performing the Type A test at this time is unnecessary since the Pilgrim Station is shut down and will remain so until after the reactor has been refueled and a Type J
A test is performed in the spring of 1987.
8612050002 861121
~
PDR ADOCK 05000293 P
i PDR_
t l
[
~
p Environmental Impact of the Proposed Action i
Type A testing is performed to assure that primary containment leakage l
is within acceptable limits during plant operation. Since that purpose will be served by the test to be performed after the reactor.is refueled, and the reactor will not be operated prior to that time, any earlier Type A i
testing is unnecessary. Eliminating the earlier testing may, in fact, reduce 1
occupational exposures. The proposed exemption does not affect plant nonradiological effluents and will have no other environmental impact.
I Therefore, the Commission concludes that there are no measurable radiological or nonradiological environmental impacts associated with the proposed exemption.
t Alternatives to the Proposed Actior.
Since the Commission has concluded there is no measurable environmental impact associated with the proposed exemption, other alternatives need not be i
evaluated. The principal alternative to the exemption would be to require rigid compliance with the Section III.A.6(b) reouirements. Such action would not enhance the protection of the environment and would result in un.iustified i
i costs for the licensee.
4 Alternative lfse of Resources This action does not involve the use of resources not considered previously i
in the Final Environmental Statement related to the operation of Pilgrim Station.
Agencies and Persons Consulted The NRC staff reviewed the licensee's request and did not consult other agencies or persons.
I
~
m
3-
~
FINDING OF NO SIGNIFICANT IMPACT The Commission has determined not to prepare an environmental impact state-ment for the proposed exemption. Based upon the environmental assessment, the NRC staff concludes that the proposed action will not have a significant effect on the cuality of the human environment.
For further details with respect to this proposed action, see the licensee's letter dated Auoust 29, 1986. This letter is available for public inspection at the Commission's Public Document Room, 1717 H Street, NW, Washington, D.C.
and at the Plymouth Public Library, 11 North Street, Plymouth County, Passachusetts.
Dated at Bethesda, Maryland this 21st day of November 1986.
FOR THE NUCLEAR REGULATORY COMMISSION 4'
Rajender Auluck, Acting Director BWR Project Directorate #1 Division of BWR Licensing
\\
4 M*
W DFWrf e
T-9 M
9
JISTRIBUTION e
uvvKUL BWD1 Reading CJamerson November 21, 1986 RAuluck DOCKETNO.
50-293 Rules and Procedures Branch MEMORANDUM FOR:
Division of Rules and Records Office of Administration FROM:
Office of Nuclear Reactor Regulation
SUBJECT:
BOSTON EDISON. COMPANY, PILGRIM NUCLEAR POWER STATION One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal i
Register for publication. Additional conformed copies ( $
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s)and Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s)and Facility License (s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration of issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility License (s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
- )
Notice of issuance of Construction Permit (s).
l Notice of Issuance of Facility Operating License (s) or Amendment (s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
Other-
_{
N.
RCurufluL d 0 h k ffece of Nuclear Reactor Re ulatilb DivisionofBWRLicensinh BWR Project Directorate #1
Enclosure:
As stated
Contact:
Phone:
.D.B :
BBKXBNBI.
errace.
4.....
)UXNAMr>
2, e^"
- w:c rn,u sie no,eos unew ono OFFICIAL RECORD COPY s
y s
u