ML20214N192
| ML20214N192 | |
| Person / Time | |
|---|---|
| Issue date: | 07/21/1986 |
| From: | Knapp M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Themelis J ENERGY, DEPT. OF |
| References | |
| REF-WM-39 NUDOCS 8609160147 | |
| Download: ML20214N192 (3) | |
Text
,
WM Record File WM Project 3/
Docket No.
JUL 211986 PDR /
J//dtN, Distribution:
T.,n/ vv/ vv/ L i 1
(R..etu.r.n to WM, 623 SS)
Distribution:
_Jm-r/f MJ Bell WMLU r/f RE Browning NMSS s/f GN Gnugnoli M Haisfield Mr. John G. Themelis, Project Manager DM Gillen Uranium Mill Tailings Project Office DE Martin Department of Energy MR Knapp Albuquerque Operations Office J0 Bunting P.O. Box 5400 Albuquerque, New Mexico 87115
Dear Mr. Themelis:
We have reviewed the draft UMTRA Project Site Management Manual per your June 4, 1986 letter. We have no major concerns. The enclosure provides minor comments for the most part related to the NRC's role in the UMTRA process.
If you have any questions regarding these comments, please contact Dan Gillen at FTS-427-4160.
Sincerely,
/y Malcolm R. Knapp, Chief Low. Level Waste and Uranium Recovery Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards
Enclosure:
As stated NO wjyj e60721 WM-39 PDR OFC :WMLU WMLU
- WMLU
.....:......I[h...::......hd..:W.MLU MME :M Haisfield :DM Gillen artin
- MR Knapp DATE:86/07/ff
- 86/07/\\'I
- 86/07/l$
- 86/07/g{
~
I Comments on Draft UMTRA Project Site Management Manual Preface. Doesn't indicate the purpose of this document.
Information in Section 1.1 would be more appropriate.
Page 11. Line 11.
Statement should read, concurrence in DOE " decision" to...
Page 17. Table 1.1 is unclear. More of a description and legend are needed.
Page 23. Figure 2.2 indicates NRC concurrence in draft CADSAR during Phase IV of the Alternate Site Selection Process. NRC will be reviewing and commenting, 5ut will not concur in draft CADSAR.
Page 41. NRC concurrence in. Final RAP should be included in Figure 4.1.
L'ine'll indicates NRC can'urrence in the final design. NRC -
Page'48.
c concurs in the final RAP which may include the final design Page 50. Paragraph 2 should indicate that NRC "may" participate in the formal design review meetings, as appropriate.
Paragraph 6 should indicate that NRC "may" attend the close-out session of the value engineering meetings, as appropriate.
Page 67. Paragraph 4.
Certification is not part of the ifcensing process.
Page 69. 7.3 LICENSING There will be no license application submitted to NRC. NRC will issue a general license for post-remedial maintenance of Title I sites by amendment to 10 CFR 40. NRC concurrence in the site-specific surveillance and maintenance plan will render the site licensed. A proposed surveillance and maintenance plan will be submitted to NRC prior to certification. Based on NRC comments, a final surveillance and maintenance plan is prepared and submitted to NRC. The final plan'will contain the site-specific surveillance and maintenance program, legal description of the site, site ownership, subsurface mineral ownership, and reporting and recordkeeping requirements.
Page 70.
Figure 7.2
" License Application" should be replaced with " Proposed Surveillance and Maintenance Plan".
6
I 1 " Complete Final License Application" should be replaced with
" Complete Final Surveillance and Maintenance Plan".
" Approve / Issue License" should be replaced with " Concur in Surveillance and Maintenance Plan" Page 71. Paragraph 3.
Omit references to license application (see page 69 comment).
Paragraph 4.
Phase II inspections should be modified to read as follows. These inspections are unscheduled and are conducted by specialists in a potential problem area (e.g., soil mechanics for settlement) as identified in Phase I inspections.
Page 72. Replace heading " License Application" with " Submit Surveillance and Maintenance Plan", and replace heading " License issuance (NRC)" with
" Conc,ur in surveillance and maintenance pl,an (NRC)".
Page 73.
Figure 8.2 should indicate notification of NRC and s'ubmission of preliminary assessment and Phase II inspection plan, prior to conducting Phase II inspection. This action is required by the DOE document " Guidance for UMTRA Project Surveillance and Maintenance".