ML20214M826
| ML20214M826 | |
| Person / Time | |
|---|---|
| Issue date: | 05/06/1987 |
| From: | Edgeworth P NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| To: | Bell T, Jordan E NRC, NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
| Shared Package | |
| ML20214M829 | List: |
| References | |
| CON-FIN-D-1761, CON-NRC-05-86-165, CON-NRC-5-86-165 NUDOCS 8706010442 | |
| Download: ML20214M826 (1) | |
Text
y CC:
NRC FORkA 255 CONTRACT NUMBER -
410 76)
NRC-05-86-165 DIVISION OF CONTR ACTS MODIFICATION NUMBER U S NUCLE AR REGULATORY CCMMISSION WASHINGTON, D C. 20555 0NEW U MODIFIC ATION Of HE R ISpeco!vl NOTIFICATION OF CONTRACT EXECUTION CONTR ACT 8ASED ON.
Edward Jordan, Director 7o.
AUTHORIZATION NUMBER g 7,,,,j Office for Analysis and Evaluation IE-86-165 of Operational Data DATE 1/6/87 rq CONTRACT CHANGES PER THIS ACTION
,q m
FROM:D (L U 71 -
T'. 16 C AON O ' bY '
~ idoor,,ct s;cc.,iar; to,rei Within scope change to qvC provide training courses; Paul Edgeworth increase ceiling amount; Contract Admin h trator provide incremental funding.
Contract Administration Branch DIVISION OF CONTRACTS. ARM CONTR ACTOR IN,n* & L oc,t.oai EXECUTION DATE MAY 0 G 1987 Combustion Engineering, Inc.
1000 Prospect Hill Road TYPE OF CONTRACT P.O. Box 500 Windsor, CT 06095-0500 Fixed Price Requirements PROJECT TITLE PERIOD OF PERFORMANCE Simulator Lease for Combustion 5/23/86 - 5/22/89 Engineering Training Course PRINCIPAL INVES TIG A TOR Robert Price NRC AUTHORIZED REPRESENTATIVE T. Larry Bell, TTC 8&R NUMBE R FIN NUMBER 20-19-10-12-2 D-1761 NEW NRC FUNDS S 42,280.00 FUNDING TOTAL FY 8._, FUNDING (PRIOR)
S 180,000.00 TOTAL NRC O8 LIGATIONS S 222,280.00 r f)v C R *.'M N T e ROPE H f y A T T ACHVE N T tSi s
f 870506 CONTR AC7 DOCUMENT 4 RC-05-86-165 PDR NRC F ORu 2%
41G 76J B