5N oY?tscBcxY2 Waynesboro, Georgia 30830 Telephone 404 554M61, Ext. 3360 404 724 8114, Ext 3360 BB SEP 3 P l! 1 k Geor iaPower D. O. Foster Vice President ite sou!!nn enJrc nstem Vogtie Project August 27, 1986 United States Nuclear Regulatory Commission Region 11 File:
X7BG10 Suite 2900 Log:
GN-1058 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
50-424/86-39, 50-425/86-19 Attention:
Mr. J. Nelson Grace The Georgia Power Company wishes to submit the following information concerning the violation identified in your inspection report 50-424/86-39 and 50-425/86-19:
Violation 50-424/86-39-03, 50-425/86-19-03, " Failure to Follow Procedures for Control of Welding Consumables" - Severity Level IV.
Georgia Power Company acknowledges the violation as identified in the USNRC inspection report.
The violation resulted from a failure by responsible personnel on duty during the weekend of April 26-27, 1986, to properly fill out a material requisition for welding consumables.
The requisitioning and issuance of welding consumables are governed by Georgia Power Company (GPC) field procedure MD-T-12 and Pullman Power Products (PPP) procedure VIII-3.
The primary function of the material requisition for welding consumables is to provide a traceability record for the material from the time it is released from the GPC warehouse until it is received and placed in stock at the contractor's welding material distribution center.
PPP welding material distribution centers normally maintain adequate supplies of welding consumables to support weekend work.
Restocking is routinely accomplished during the week when personnel experienced in this function are on duty.
On the weekend of April 26-27, 1986, vendor representatives were on sitt f to perform repairs to two valve bodies requiring the use of E309L-16 welding electrodes.
The material requi!.ition for the electrodes was processed by personnel who do not normally perform this function.
It should be noted, however, that these personnel were experienced in the control of welding material distribution from the welding material distribution center.
A review of the rod tickets used to obtain the electrodes for the valve body repairi concluded that proper control was maintained.
8609110302 860827
\\g
\\ SN!
PDR ADOCK 05000424
\\
G PDR
'~
)
1 f
Page Two l
The certified material test reports for the subject E309L-16 elec-trodes were reviewed and it was confirmed that the electrodes were quali-fled for the work in which they were used, To prevent further violations, GPC procedure MD-T-12 has been revised to clarify approval requirements for welding material requisitions.
An authorization list has also been developed to specify, by name, personnel authorized to approve requisitions for welding consumables.
In addition, appropriate GPC mechanical engineering and warehouse personnel and appropriate PPP personnel are being retrained in project procedural requirements for the requisition, issue, and stocking of welding consumables.
The retraining is expected to be completed by September 24, 1986.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Your truly i
D. O. Foster REF/D0F/tdm xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 J. H. Miller R. A. Thomas L. T. Gucwa J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head P. R. Bemis G. A. McCarley R. E. Conway J. A. Bailey D. S. Read J. T. Beckham
- 0. Batum Sr. Resident (NRC)
R. H. Pinson G. Bockhold C. S. McCall (0PC)
P. D. Rice C. E. Belflower J. E. Joiner (TSLA)
B. M. Guthrie J. F. D'Amico D. C. Teper (GANE)
D. E. Dutton E. D. Groover NORMS l