. OPERATING DATA REPORT
~
DOCKET NO.
50-244 DATE
_ July 8, 1986 COMPLETED BYdeb r E h M m
Andrew E. McNansra TELEPHONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Notes
- 2. Reporting Period:
June, 1986 1520
- 3. Licensed Thermal Power (MW ):
m nntained at 100% during 490
- 4. Nameplate Rating (Gross MWe):
the report period with three 470 ex ptions, detalled on
- 5. Design Electrical Rating (Net MWe):
490 Page 4,
- 6. Maximum Dependable Capacity (Gross MWe):
470
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr. to-Date Cumulative 720 4,343 145,463.00 i1. Ilours In Reporting Period
- 12. Number of Ilours Reactor Was Critical 720 3.352.75 111.639.92 0
0 1,687.55*
- 13. Reactor Reserve Shutdown llours 720 3.323.50 109.348.13
- 14. Ilours Generator On.Line 0
0 8J *
- 15. Unit Reserve Shutdown llours 1,080,912 4,837,920 152,560,545
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gross Electrical Energy Generated (MWil) 364,749 1,632,322 49,925,178
- 18. Net Electrical Energy Generated (MWil) 347,214 1,551,836 47,355,153
- 19. Unit Service Factor 100%
76.53%
75.17%
100%
76.53%
75.18%
- 20. Unit Availability Factor 102.60%
76.03%
70.83%
- 21. Unit Capacity Factor (Using MDC Net) 102.60%
76.03%
70.83%
- 22. Unit Capacity Factor (Using DER Net) 0%
0%
7.13%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative Total Cormuncing January 1,1975 e Q_
p i nev. 4 s o u i
8609100349 860630
\\\\
PDR ADOCK 05000244 R
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Julv 8,_1986 COMPLETED BY S _V E N %o-1 =
e-Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH June, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEV 2L (MWe-Net)
(MWe-Net) 1.
489 17.
488 2.
489 18.
488 3.
490 19.
488 4.
490 20.
489 5.
489 21.
487 6.
492 22.
487 7.
491 23.
485 8.
490 24.
484 9.
489 25.
486 10.
489 26.
310 11.
489 27.
486 12.
490 28.
486 13.
490 29.
485 14.
489 30.
485 15.
489 31.
16.
489 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
\\
l
D(X'.KET NO.
50-244 tlNIT NAME R.E. GINNA NUCLEAR POWER PLANT,
UNIT SNUTDOWN AND POWER REDUCTIONS DATE July 8, 1986 COMPLETF.D IW O'd -# 8-M_; %
Arxirew E. McNamahl REPORT MONTH. TUNE 1986 TELEPilONE 315-524-4446 Ext. 301 Ginna Statico m
.E n
e 5;
- =u Licensee s,
ge Cause & Corrective e }$j
,r Event j4
!y No.
Date
{
jj 2
Action to Report #
- j u
Prevent Recurrence dE J
e 2
g u
o 6/26/86 F
15.25 A
HC HTEXCH Ioad reduction to approxanntely 46%
reactor power level.
1-A-1 Condenser tube leaks plugged 5 tubes. Load reduction arxl restora-tion of reactor power level to 100%
occurred on same date.
l 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 w us %
H-Other (Explain)
Exhibit 1 - Same Source
1
\\
. NARRATIVE
SUMMARY
OF U2ERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Julv 8.
1986
[ Andrew E. McNamara 3 -7 2. M M a --> -
COMPLETED BY TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH June. 1986 The reactor power level was maintained at 100% for the majority of the report period, with the following exceptions:
On 6/17 the reactor power level was reduced to - 97% for a short period to perform a Periodic Test on the Auxilary Feedwater System.
On 6/19 the reactor power level was reduced to - 99% for a short period to perform a Periodic Test; Standby Auxiliary Feedwater System Flow Check.
On 6/26 the reactor power level was reduced to - 46% to isolate the 1-A-1 Condenser to repair tube leaks.
After plugging five (5) tubes the reactor power level was restored to 100% before the end of the day.
i 6
GINNA STATION MAINTENANCE REPORT
SUMMARY
JUNE, 1986 During the month of June, routine maintenance and inspections were completed.
Major safety related work included:
1.
M-40/ Monthly Snubber - Insp.
2.
- 1-A, B,
C S.I.
Coolers - Insp.
3.
- 1-C & D Standby Aux.
F.W.
Pumps - P.M.
Insp.
4.
- 1-B Charging Pump - Replace Drive Belts.
5.
- 3 SPING Monitor Pump - P.M. Insp.
6.
Spare Toxic Gas Analyzer Pump - Rebuild.
9
.~,
e Re7;mre ~
. e.
ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001'
... co[ E."$Ye.2 7oo GINNA STATION July 8, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Wachington, DC 20555
Subject:
Monthly Report for June, 1986 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1986.
Very truly yottrs, d
va 9J fStanleyM.Spapor Superintendent of Ginna Production SMS/eog Attachments cc:
Dr. Thomas E. Murley NRC (1) 4 C.-_